Loading…
Loading…
16,802 results • Best match
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Different works for Providing Functional Household Tap Connection (FHTC) by Augmentation of T/W- III, Zone-I for Dakshin Chak Water Supply Scheme
Providing FHTC Functional Household Tap Connection under Jaldhara Jal Swapna for Tarapur Part I at Ranaghat I Block by retrofitting of Ground Water based PWSS for Tarapur Water Supply Scheme under NAD I PHE Dte
Providing FHTC (Functional Household Tap Connection) under Jaldhara / Jal Swapna ...... at Haringhata Block by retrofitting of Surface Water based PWSS for Haringhata and Chakdah (Part) Water Supply Scheme under Nadia Arsenic Division-I, PHE Dte.
Augmentation of Rampara Faridpur Piped water supply scheme to accommodate construction of OHR ,Arsenic cum Iron Removal PlantAIRP and service road , laying of design pipeline and providing FHTC Functional Household Tap Connection under Jal Jee
Augmentation of Bhundar kismat Piped water supply scheme to accommodate construction of pump house ,boundary wall and service road , laying of design pipeline and providing FHTC Functional Household Tap Connection under Jal Swapna in Bhagwangol
Construction of Boundary Wall, Pump house cum Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for PARULDAHA (ZONE 26) MOUZA Piped Water Supply Scheme of BARUIPUR Block
Laying Distribution System with providing Functional Household Tap Connection (FHTC) and Construction of Pump House with water supply and sanitary arrangement (as per deptt. drawing) of ABJAKHALI PIPE WATER SUPPLY SCHEME in BISHNUPUR-I Block
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAYAN Piped Water Supply Scheme at Narayandighi and Sadhanpur (Part) Village (Mouza), Burdwan - I Block under Burdwan Division, PHE Dte.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-I and II) Piped W.S. Scheme at Arra, Amarun, Nawada, Sunur ................ Bhatar Block under Burdwan Division, PHE Dte.
Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site 2nd tubewell site and road restoration of Palihar PWSS at Kaliyaganj Block under Raiganj Division, PHE Dte.
Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe and supply of necessary fittings within Champali w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. (Phase-I)
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of UTTAR RADHAKANTAPUR PWS Scheme at Uttar Radhakantapur, Patra,Katna etc village mouza, Memari-I Block under BURDWAN Division, P.H.E Dte.
Retrofitting of Kudagara Water Supply Scheme at Arsha Block of Purulia Sadar Sub-Division for Providing Functional Household Tap Connection (FHTC) under JAL SAPNA programme under Purulia Division, PHE Dte. (Habitation covered Gourangdih, Manpur, Kan
Providing Functional Household Tap Connection (FHTC) to all the households in Luxbagan Water Supply Scheme Block - Gosaba, South 24 Parganas District under Alipore Division, P.H.E. Dte. including Operation and Maintenance of Scheme for one year.
Relaying of damaged distribution System by new for Providing Functional Household Tap Connection (FHTC) to the remaining households in connection with Jal Swapna for Kusumtala Water Supply Scheme, Block Namkhana under Alipore Division, PHE Dte.
Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Zafarpur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I)-2nd Call
Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site 2nd tubewell site and road restoration of Baghan PWSS at Kaliyaganj Block under Raiganj Division, PHE Dte.
Functional Household Tap Connection (FHTC) including other allied works of Bhamuria Water Supply Scheme at Neturia Block of Raghunathpur Sub Division under Purulia Division, PHE Dte. Part-D (Mouza-Bonra under Bhamuria GP ).( 889 Nos.)
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distribution system at Uttar and Dakshin Bhatora Piped Water Supply Scheme under Amta-II Block under Howrah Division, PHE Dte. Zone-II 2203 nos
Construction of 150 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design and drawing of foundation
Providing FHTC Functional Household Tap Connection under Jaldhara Jal Swapna for Parniamatpur Phase I at Ranaghat I Block by retrofitting of Ground Water based PWSS for Parniamatpur Water Supply Scheme under NAD I PHE Dte
Providing of Functional Household Tap Connection FHTC at Budharugaon and Dhakpara Mouzas under under Jal Jeevan and Jal Swapno programme of Budharugaon Water Supply Scheme under Phansidewa Block under Siliguri W/S Division P.H.E. Dte.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Balgona Piped Water Supply Scheme at Shikartor village and Tulsidanga village (3 Nos.habs) Bhatar Block under Burdwan Division,PHE Dte.
Laying Distribution System (Part-D) allied with Providing Functional Household Tap Connection (FHTC) at Distribution Pipeline (Part-D) and rising main at Thakurganj and Adjoining Mouzas Water Supply Scheme within Phansidewa block under SSD, PHED
Augmentation of Diar Syampur ZoneII Piped water supply scheme to accommodate construction of OHR boundary wall and service road laying of design pipeline and providing FHTC Functional Household Tap Connection under Jal Swapna in Bhagwangola
Functional Household Tap Connection (FHTC) including other allied works of Parbeliya Water Supply Scheme at Neturia Block of Raghunathpur Sub Division under Purulia Division, PHE Dte. Part-B ( Mouza- Parbeliya City , Parbelia under Bhamuria Saltor
Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe and supply of necessary fittings within Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. (Phase-I)
Providing Functional Household Tap Connection (FHTC) to all the households in Radhakrishnapur Water Supply Scheme, Block - Sagar, South 24 Pgs. District under Alipore Division, P.H.E.Dte. including Operation and Maintenance of scheme for 1 (one) year
Providing Functional Household Tap Connection (FHTC) in Bankra mouza including laying of UPVC/PVC pipe and supply of necessary fittings within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, PHE Dte.
Laying of DI UPVC Distribution Pipeline and Providing FHTC (Functional Household Tap Connection) by Augmentation for Nalabara Zone-I Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, PHE Dte.
Providing Balance Functional Household Tap Connection (372 nos FHTC) from existing distribution system within the command area of KHANDAGHOSH PWS Scheme at .......... Mouza under KHANDAGHOSH Block of Burdwan Sub-Divn. under Burdwan Division, PHE Dte
Augmentation of Hazi Mohammadpur ZII Piped water supply scheme to accommodate construction of service road , laying of design pipeline and providing FHTC Functional Household Tap Connection under Jal Swapna in Lalgola Block of Murshidabad Dist
Laying of UPVC Distribution System pipeline and Providing FHTC (Functional Household Tap Connection) for augmentation of Kachua Swarupnagar Water Supply Scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Srirampur P. W. Supply Scheme at Srirampur ( Srirampur East Para Habitation Village, Purbasthali-I Block under Burdwan Division PHE Dte.
Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area ........... of TEANDUL PWS Scheme within Raina-I Block of Burdwan Sub-Divn. under under Burdwan Division, PHE Dte.
Functional Household Tap Connection (FHTC) including other allied works of Bathanbari Water Supply Scheme at Neturia Block of Raghunathpur Sub Division under Purulia Division, PHE Dte. Part-B (Mouza- Ghatkul, Gobindapur Alis , Amaidi, Hariraidi ALIS,
Laying Distribution System with providing Functional Household Tap Connection (FHTC) and Construction of Pump House with water supply and sanitary arrangement (as per deptt. drawing) of DAULATPUR PIPE WATER SUPPLY SCHEME in BISHNUPUR-I Block
Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site, 2nd tubewell site and road restoration of Rampur PWSS at Raiganj Block under Raiganj Division, PHE Dte.
Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe and supply of necessary fittings within Kalitala w/s scheme, Hingalganj block under Hasnabad Sub-Division, PHE Dte. (Phase-I)
Laying Distribution System with providing Functional Household Tap Connection (FHTC) and Construction of Pump House with water supply and sanitary arrangement (as per deptt. drawing) of KANNYANAGAR PIPE WATER SUPPLY SCHEME in BISHNUPUR-I Block
Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Nityanandakati Balti Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase I)-2nd Call
Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site, 2nd tubewell site and road restoration of Alianagar PWSS at Karandighi Block under Raiganj Division, PHE Dte.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ALIPUR Piped Water Supply Scheme at Debipur, Alipur and Benapur ........ Village (Mouza), Memari-I Block under Burdwan Division PHE Dte.
Construction of Pump house cum Chlorine Room, Boundary Wall along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of TEKA MOUZA Piped Water Supply Scheme of BARUIPUR Block
Functional Household Tap Connection (FHTC) including other allied works of Bathanbari Water Supply Scheme at Neturia Block of Raghunathpur Sub Division under Purulia Division, PHE Dte. Part-A (Mouza- Bathanbari,Bhurkundabari under Gunyarae G.P). (10
Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of BAGILA Piped Water Supply Scheme at Kiskinda , Krishnapur, Talchini and Bagila Village, Memari-I Block under Burdwan Division, PHE Dte.
Functional Household Tap Connection (FHTC) including other allied works of Parbeliya Water Supply Scheme at Neturia Block of Raghunathpur Sub Division under Purulia Division, PHE Dte. Part-A (Mouza-Gosaindi, Parbeliya, Gopaldhawah, Parbeliya City und
Laying Distribution System with providing Functional Household Tap Connection (FHTC) and Construction of Pump House with water supply and sanitary arrangement (as per deptt. drawing) of JULPIA PIPE WATER SUPPLY SCHEME in BISHNUPUR-I Block
Laying of UPVC Distribution System pipeline and Providing FHTC (Functional Household Tap Connection) for augmentation of Dhopaberia-Ganrakupi Water Supply Scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte
Providing Retrofittng Functional Household Tap Connection FHTC in connection with JalJeevan Mission and JalSwapna under command area of village of Gujasti Rampur Village code 314898 under Amaipara Zone-A Surface water based Water Supply Scheme