Loading…
Loading…
3,767 results • Best match
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3)
Decorating by providing colours as per directions of EIC of Gel rice or LED light string, Decoration of Terminal building by providing coloured LED flood light fittings, Decoration of pheriphery of Terminal building by providing pixel LED light, Providing and fixing decorative tricolor Paper Fans at various locations inside terminal building, Providing and fixing decorative hanging banner at various locations inside terminal building, Providing and fixing decorative tricolor Baloon decorations at various locations inside terminal building, Providing and hanging decorative tricolor Frills at various locations inside terminal building, Provision of selfi stand with comfortable seating and decorative arch with related theme, Provision of theme stage of 8 X 8 ft electrically illuminated decorative stage
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6495747 Dated : 25-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
modular electrical enclosure switch board boxes for modular type accessories (Q3), LED Bulb with Battery as per IS 16102 (Q3), Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3), LED Bulkhead Light (Q3), Molded Case Circuit Breakers ... (Q2), LED Batten with ...
Flame Proof Flood Light 100W, LED Flood Light 150W, Tape Insulation PVC 15mm x 6mm, Glass shelf corner 10 inch x8mm thick, Urinal Flat back 430x370x340mm, PVC packing Solution 250ml, FRP Chajja 1.50m x 0.84m, Insulted Water Tank Cover of 1000 Ltr Capacity
Miniature Circuit Breakers-IS 60898-1:2002, Molded Case Circuit Breakers (Mccb)-IS/IEC:60947, LED Luminaire (Recessed Luminaire), modular electrical switches and accessories, Non Modular Elecrical Switches And Accessories Flush Type-IS 3854, PVC Flat ... Fixture- LED tube light, ... IS:1258, LED Luminaire (for ... bulb, LED Luminaire (For ...
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate ... category LED Luminaire for ...
As per BOQ
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6325856 Dated : 16-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable ... category LED Luminaire for ...
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3)
LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Luminaire ... (Q3), LED Batten Light ... ( LED Tube Light) ...
Evaporative Air Cooler 110 ltr, Rectangular Stainless Steel Chafing Dish 9.5 Ltr, Shamiyana 14 x 18 Maroon, Flag 6 x 4 Red and Navy Blue, 10 Watt LED Flood Light, Curtin 3.5 x 8 feet Maroon, Curtin Rod 12 feet, Curtain Rod Bracket Set
LED Tube Light (Retrofit Type) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number : GEM/2025/B/6709085 Dated : 23-09-2025 Bid Document 1/12 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Modular Socket, LED, Tube light, EXTENSION BOARD, CORE CABLE, Energy Meter, PVC Cable, LIGHT With Driver, Air coolers, Exhaust Fan
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6495892 Dated : 25-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6285589 Dated : 15-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6294567 Dated : 13-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6297571 Dated : 05-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6297590 Dated : 07-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6285585 Dated : 15-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
twin post lift hydraulic electrical, led light, cable, auto cut switch, safety lock BOQ Title BOQ BID
Wooden Bed, Sofaset, Pillow Foam, Blancket, Bed sheet and Pillow, Fridge, Led light BOQ Title BOQ BOQ
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) (3 (3 ))
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) (3 (3 ))
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) (3 (3 ))
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) (3 (3 ))
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) (3 (3 ))
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) (3 (3 ))