Loading…
Loading…
781 results • Best match
Constrcution of Amaravati "HAPPY NEST" Residential Housing Project consisting of Total 1200 Apartment units in 12 Towers G+18 Floors pattern with Sub Structure,RC wall Super Structure using shear wall technique with aluminium ... , Lifts ,DG ...
Constrcution of Amaravati "HAPPY NEST" Residential Housing Project consisting of Total 1200 Apartment units in 12 Towers G+18 Floors pattern with Sub Structure,RC wall Super Structure using shear wall technique with aluminium ... , Lifts ,DG ...
Operation And Maintenance Of Electro-Mechanical Installations - LOAD TESTING OF MHES AND ITS ACCESSORIES (GT/GTG/RG LIFTING DEVICES, LISTERS, FORK LIFTS, PALLETS, EOT CRANES, HOISTS AND MOBILE CRANE)
Comprehensive Annual Maintenance to 4 No.s 15 passengers Johnson Lifts in 10 Court Building in District Court Compound at Visakhapatnam for the year 2025-26. (i.e from 15.11.2025 to 31.03.2026)
Inspection conveyor - 4 meters width - 600mm with wheels material SS 304 grade, Infeed elevator conveyor - 2.5 meters with 350 x 350 hopper material SS 304 grade, Vegetable hot air blower with axial fans- 3 meters material SS 304 grade
Construction of Administrative Building for Bank of Baroda at Amaravati, Andhra Pradesh including Internal water supply, sanitary installations, drainage, Internal Electrical Installations and Fans, Fire Fighting System with Wet Riser, Automatic Fire ... Passenger Lifts , ...
Construction of Office Building (Basement G 5 Storeyed) including Internal Water Supply, Sanitary installations, Drainage IEI & Fans, Fire Fighting with Wet riser system, Automatic Fire Alarm System, Mechanical Ventilation, Lifts, UPS Backup, AV System, PA System, VRV &VRF AC System, CCTV, LAN, Substation equipments, DG Sets, Roof top solar power generation system, Streetlights, Development works like External Water Supply connection UG Sump, Internal roads, Bore Wells with pump sets, Rain Water harvesting, Horticulture operation etc., for GST Commissionerate at Tirupati, Andhra Pradesh.
Balance work of Construction of Amaravati HAPPY NEST Residential Housing Project Consisting of Total 1200 Apartment units in 12 towers of G + 18 Floors Pattern with Sub Structure, RC wall Super Structure using shear wall technique with aluminum ... Fighting, Lifts , ...
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Completion of balance works viz., Architectural Finishes, Internal and External Electrical, Plumbing and Sanitary Fixtures, Fire Fighting Provisions, Lifts, DG, HVAC, Security Systems, External Development and Land Scaping etc., for Multi Storeyed Quarters of 432 Apartment units in 18 towers of (S plus 12) Floors Pattern Buildings for Honourable MLAs and Honourable MLCs and All India Services Officers near Nelapadu, Amaravati, Andhra Pradesh on Lumpsum Contract (Percentage Tender) System with the DLP of 2 Years
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Completion of balance works viz, Architectural finishes (excluding internal wardrobes), Internal and External Electrical, Plumbing and Sanitary fixtures, Firefighting ... provisions, Lifts , ...
Annual Repair Running and Maintenance of electrical and Mechanical Services at Custom House Rajaji Salai Chennai - 01 Subwork/Packages: Annual Comprehensive Maintenance and servicing contract for the 4 Nos Johnson Lifts Krishna Block for 24 Months
Providing,Supply and installation of Interior finishes, Fit out, Lifts for main building of judicial complex and also construction of external infrastructure works including canteen,Kitchen & Security building including civil and MEP works, Retaining wall/compound wall for entire site, storm water drains, internal roads-(Rigid pavement &Paver blocks),Surface parking-(DBM Pavement), UG Sumps, STP and other miscellaneous works for phase 2 development of judicial complex in Super block "F" of Amaravati Government Complex area in Amaravati Capital City, Andhra Pradesh on Design Build Item Rate contract.
Establishment of Research Centre and training facilities for National Centre for Coastal Research (NCCR) at Dolphin Nose, Visakhapatnam SH : C/o Laboratory Building including internal water supply, sanitary, drainage and Internal Electrical ... System, Lifts , ...
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Completion of balance works viz., Architectural finishes, Internal and External Electrical, Plumbing and Sanitary fixtures, Firefighting provisions, Lifts, DG Sets, HVAC systems, Building Security systems, Internal Roads, Street Lighting, including Internal Ward robes, Podium Hardscaping, Landscaping for 21 Towers etc., for Multi-storied Quarters of 855 Apartment Units in 9 Towers of (S plus 12) Floors Pattern Buildings for Housing of Non-Gazetted Officers near Nelapadu, Amaravati, Andhra Pradesh on Lumpsum Contract (percentage tender) System including Defect Liability Period of 2 years.
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Completion of balance works viz., Architectural finishes, Internal and External Electrical, Plumbing and Sanitary fixtures, Firefighting provisions, Lifts, DG Sets, HVAC systems, Building Security systems, Internal Roads, Street Lighting, including Internal Ward robes, Podium Hardscaping, Landscaping for 21 Towers etc., for Multi-storied Quarters of 855 Apartment Units in 9 Towers of (S plus 12) Floors Pattern Buildings for Housing of Non-Gazetted Officers near Nelapadu, Amaravati, Andhra Pradesh on Lumpsum Contract (percentage tender) System including Defect Liability Period of 2 years.
RFP for Engagement of Project Management Consultant(PMC) for WORLD BANK and ADB financed Amaravati Capital City Development Program related to Completion of balance works viz., Architectural Finishes, Internal and External Electrical, Plumbing and ... Provisions, Lifts , ...
Construction of Office building including internal water supply, sanitary installations, drainage, IEI and fans, Fire fighting, Mechanical ventilation, Lifts, UPS backup, AV system, PA system, VRV and VRF AC system, CCTV, LAN, Substation equipment, DG sets, Rooftop solar power generation system, street lights, Developmen works like external water supply connections, UG sump, internal roads, Bore wells with pump sets, Rain water harvesting, Horticulture operations etc., for GST Commissionerate at Tirupati, Andhra Pradesh. SW Providing outsourcing man power service to Office of Assistant Engineer E, CPWD, Tirupati on job basis. Subwork/Packages: Providing out sourcing man power services to Office of the Assistant Engineer E, CPWD, Tirupati on job basis
Construction of Office building including internal water supply, sanitary installations, drainage, IEI & fans, Fire fighting, Mechanical ventilation, Lifts, UPS backup, AV system, PA system, VRV&VRF Ac system, CCTV, LAN, Substation equipment, DG sets, Roof top solar power generation system, street lights, Development works like external water supply connections, UG sump, internal roads, Bore well with pump sets, Rain water harvesting, Horticulture operations etc., for GST commissionarate at Tirupati, Andhra Pradesh. SW. Providing services of inspection vehicle with qualified licensed driver on monthly basis for Office of the AE(E), CPWD, Tirupati. Subwork/Packages: Providing services of inspection vehicle with qualified license holder driver on monthly basis for the office of the AE(E), CPWD, Tirupati.
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Completion of balance works viz., Architectural finishes, Internal and External Electrical, Plumbing and Sanitary fixtures, Firefighting provisions, Lifts, DG, HVAC, Security Systems, External Development and Landscaping etc., for Housing of Gazetted Officers Type-I and II and Class IV Officials consisting of a total of 1440 Apartment units in 14 towers of (S plus 12) Floors Pattern with a BUA of 27,24,080 Sft with Sub-structure, R.C. wall Super Structure using Shear Wall technique and Aluminium Form work in Amaravati Govt., Complex, Andhra Pradesh on Lumpsum Contract (percentage tender) System with the DLP of 2 years
Operation and round the clock transportation of the Unit-6 Mill Rejects system, including collection, cleaning of surrounding areas, and disposal to the designated yard, including all leads and lifts at Stage-IV/Dr. MVR RTPP for six months. i.e from 01.04.2026 to 30.09.2026 in the year 2026-27
Construction of OTM Complex for Indian Coast Guard at Muthukur, SPSR Nellore Dist., AP. SH Construction of Admn block (stilt plus 3), Accommodation for single living officer (G plus1), MI Room (GF), MT Garage (GF), Guard Room (GF) and Armory room ... fittings, lifts , ...
Construction of Permanent Campus for Indian Institute of Petroleum and Energy IIPE, Visakhapatnam at Vangali Village, Sabbavaram, Ankapalli District, AP SH Design, Development and Construction of Central Administrative Block South, East Academic ... fans, lifts , ...
Construction of New National Academy of Customs, Indirect Taxes and Narcotics (NACIN) Under Phase-1 at Palasamudram, Anantapur District, Andhra Pradesh. SH: Planning, Designing and Construction of Buildings, Development works, Bulk Services, ... system, Lifts , ...
CONSTRUCTION OF 400 BEDDED 350 AND 50 SUPER SPECIALITY HOSPITAL GROUND PLUS SEVEN FOR ESIC AT SHEELANAGAR VISAKHAPATNAM ANDHRA PRADESH SUB HEAD PLANNING DESIGNING AND CONSTRUCTION OF BUILDINGS DEVELOPMENT WORKS BULK SERVICES HORTICULTURE WORKS ... SERVICE LIFTS SUBSTATION ...
Construction of Office cum Lab Building (stilt and 4 floors) for MPEDA at Bhimavaram, W.G. Dist. AP. SH: Balance works of building including internal water supply and sanitary installations, sewerage system, drainage & development of site, internal ... of Lifts , ...
Architectural and structural design and construction of Office cum Lab building (Stilt and 4 floors) for MPEDA on EPC basis including Internal water supply, & Sanitary Installations, Sewerage system, Drainage & Development of Site, Internal Roads & ... of Lifts , ...
Pencil box (Q4), Gel Pen (Rev) (Q4), Eraser (Q4), Scales (Steel scale) as per IS:1481 (Q4), Paper weights (Q4), Sketch Pen (Fibre Tip) as per IS:10562 (Q4), Stapler Pin/Staples (Rev) (Q4), Paper Clips as per IS:5650 (Q4), desktop ... Top Elevator Writing ...
Femur interlocking awl- 11 inch, Straight ball spike 12 inch, Shoulder percussion awl 8 one by two inch, Tibial interlocking bone awl 10 inch, Cannulated bone awl 9 one by two inch with reamer tip and serrations, Humerus bone awl 5 inch, Z type K ... Periosteum elevator Straight- ... Periosteum elevator Straight- ... Periosteum elevator Straight- ... Periosteum elevator curved ... Periosteum elevator curved ... Cobbs Elevator - ... Cobbs Elevator - ... Cobbs Elevator - ... Cobbs Elevator - ... Bristow elevator - ... Donalds elevator , ...
Construction of Administrative Building (Cellar plus Ground plus 4 including internal water supply, sanitary installations, drainage and development works and providing IEI and Fans, Street Lighting and Compound lighting lifts, Addressable Fire Alarm System and PA system, Fire Fighting System LAN system with switches, UPS system, Solar Power Plant, VRF / VRV AC system and Audio Video Conference system etc. for Dr. B.R. Ambedkar University, Srikakulam, Etcherla , Andhra Pradesh SH: Balance work with as RCC works )for head rooms, terrace water tanks, miscellaneous works at all floors, UG sump etc) left over masonry works all floors, left over finishing works like external and internal plastering, putty, final painting works, flooring works like Granite and vitrified tile and Ceramic tile works and other works like steel work, false ceiling, roofing, wood works, sanitary, water supply, drainage, aluminium , structural glazing, water proofing etc. as detailed in schedule of quantities Subwork/Packages: SH : Balance work such as RCC works for Head rooms, terrace water tanks, Miscellaneous works at all floors, UG sump etc left over masonry works all floors, left over finishing works, like external and internal plastering, putty, final painting works, flooring works like Granite and vitrified tile and ceramic tile works and other works like steel work, false ceiling, roofing, wood works, sanitary, water supply, drainage etc. and development works as detailed in schedule of quantities
Construction of various buildings under phase-I for Central University campus Ananthapuramu, Andhra Pradesh. Subwork/Packages: SH: Construction of Central Administrative Building G & 2 floors, Academic Building Block -I & II G & 2 Floors, Boys Hostel ... Fans, Lifts Fire ...
Gel Pen (Rev) (Q4), Black Lead Pencils IS - 1375 (Rev) (Q4), Scales (Steel scale) as per IS:1481 (Q4), Eraser (Q4), Cleaning Duster (Version 2.0) (Q4), scissors (Q4), Packing list envelope (Q4), Sketch Pen (Fibre Tip) as per IS:10562 (Q4), desktop ... Top Elevator Writing ...