Loading…
Loading…
14,148 results • Best match
Construction of combined operational offices for DGCA, BCAS, AAIB, AERA and AAI at Safdarjung Airport, New Delhi.SH- Provision of Elevators
Construction of DEIC on the First Floor of Existing Civil Hospital at Rohtak in District Rohtak (Providing Bed Elevators only)
Supply, installation, testing and commissioning of unit spares for Johnson Escalator E-5881 at PF 1 FOB of TJ Railway station. List of spares is enclosed in Annexure- A. Make/Brand:- Johnson
Passenger awareness safety instruction flux board size-6 feet x 4 feetof good quality star flux material riveted on MS frame size- 1 inch square,printing matter in three language for escalator
BUCKET ELEVATOR SPROCKET, DUPLEX, Z=27, PITCH:44.45mm, 1600032205, Z=34, 1600032204, ESP DRAG CHAIN SPROCKET, SIMPLEX, Z=13, PITCH:31.750 - 1600066025, PCI LOOP CONVEYOR SPROCKET, Z=24, PITCH:25.4mm - 1600066026, PCI LOOP CONVEYORSPROCKET, Z=25, PITCH:25.4mm - 1600066027, Z=28, PITCH:25.4mm - 1600066028, THICKENER CHAIN 1 1/4 INCH SIMPLEX R3119 (1BOX=3.05 MTR) -1600066029, THICKENER 0.625" 23 TEETH SPROCKET - 1600066030, THICKENER 0.625"57 TEETH SPROCKET - 1600066031, THICKENER 1.25" 19 TEETH SPROCKET - 1600066032, THICKENER1.25" 38 TEETH SPROCKET - 1600066033, THICKENER1.25" 17 TEETH SPROCKET - 1600066034, THICKENER 1.25" 34 TEETH SPROCKET - 1600066035, Drag Feed Chain for ESP - 17M 022312
Mumbai Division (Non-Suburban Section) - Provision of Escalators (17 Nos) at Palghar (3), Boisar (3), Dahanu Road (3), Vapi (6) and Valsad (2) (Composite tender for Electrical and Civil work)
Construction of 2nd Annex Building for the Government Secretariat- SITC of Passenger Lifts- Retender
Installation of new lifts in various places of University of Calcutta premises under Kolkata North Electrical Division, P.W.D.-------SITC of Lifts at Raja Bazar Science College and Economic campus at BT Road .
Customized AMC/CMC for Pre-owned Products - Annunal Maintenance Contract of OTIS make 01 No Elevator installed at PPH and 03 Nos Elevator Installed at Penstock Emergency gate shafts P1 P2 and P3 of Pong Power House during the year 2026-27 and 2027-28..
Repair work of Elevator installed at Kutni Poshak Dam District Chhatarpur (MP) complete work with material and labor at work site as per G Schedule and direction of Engineer.-in charge.
RMO Lifts in A,B,C,D-I & D-II wing at Sena Bhawan, New Delhi. SH - Comprehensive maintenance of Johnson make passenger lifts 3 Nos. in B wing & 4 Nos. in C wing Subwork/Packages: RMO Lifts in A,B,C,D-I & D-II wing at Sena Bhawan, New Delhi. SH - ... passenger lifts 3 ...
The detailed scope of the work/contract is specified under section III. However the list of works mentioned is only indicative and all other incidental works in completing the work of Comprehensive annual Maintenance Contract of 1 No. of M/s ... Thyssenkrupp Elevator (India) ... Passenger Elevator installed ...
SITC of 4 nos lifts in admin and academic block - 1 along with civil, electrical works required in campus of Gurugram University, sector-87, Gurugram.
AMC of 08 Nos lifts installed in Type-II Block-B, C and D and Type-III Block-B quarters at 95 Bn BSF Bhondsi under DIG(HQ) FHQ BSF New Delhi
Operation of Lifts
Providing comprehensive maintenance to 2 nos 13 Passenger lifts Thyssenkrupp make at NEW TELECOM BUILDING Bengaluru for 2 years
REPAIR AND DAY TO DAY MAINTENANCE SERVICES TO CERTAIN LIFTS OF MAP AND OTM ACCOMMODATION AT VSN CHILODA GANDHINAGAR
Design, manufacturing, supply, erection, testing and commissioning of Passenger Elevators - 2 nos. (Capsule / Panoramic type) for Admin Building at Barh STPP
PROVIDING ANNUAL COMP MAINTENANCE CONTRACT OF ESCON MAKE TWO NOS ELEVATORS INSTALLED AT F TYPE 36 QUATER NEAR MATA MANDIR BHOPAL
Comprehensive Annual Maintenance Contract of Five (5) Nos. KONE Elevators installed at Neer Shakti Sadan, NHPC Office Complex, Sector-33, Faridabad
Examination ,Testing and Certification of lifting machines, Elevators, Pressure vessals, safety valves, Tool and Tackles for Tehri HPP for 02 years.
Annual Maintenance Contract for Operation of two No. of OTIS Elevators at Nagarjuna Sagar Dam for 2025-2026, Nalgonda dist., Telangana
Providing 2 Nos Hydraulic Elevators proposed in Yadagirigutta Temple (one at NW corner of Mukhamandapam and one at Ladduprasadam), Yadagirigutta, Telangana
Procurement of spares for ALIKRAFT make rack and pinion type elevators working in Coal Handling Plant at STPP, Jaipur, Mancherial, Telangana
SITC of 13 Passenger 02 Nos. Elevators at Judicial Court Complex Building for ADJ, SCJ-Cum-ACJM Court, Sangaria District Hanumangarh.
Procurement of spares for ALIKRAFT make Rack and Pinion type Elevators working in Coal Handling Plant at STPP, Jaipur, Mancherial,Telangana.
PROV ANNUAL COMPREHENSIVE MAINTENANCE CONTRACT OF ESCON MAKE TWO NOS ELEVATORS INSTALLED AT F TYPE 36 QTR NEAR MATA MANDIR BHOPAL
Improvements to 3 Nos of 1360 KGs capacity (OTIS MAKE) Elevators in 4th, 8th and 18th blocks of NSRS Srisailam Project
Madurai Division - Comprehensive Annual Maintenance Contract for M/s. Johnson Make Lifts of 13 Passengers capacity - on various locations of Madurai Division (Total 25 Nos of Lifts)-for the period of five years".
MANUAL OPERATION INCLUDING CARRYING OUT REPAIRS ROUTINE MAINTENANCE MONARCH MAKE LIFTS IN GEMINI ROHINI REVATI KARTIKEYA LIFTS INSTALLED AT ARCHANA SARVANA VISWARKARMA JYESTHA DANISTHA ALAKNANDA BHARANI AND VATSALA UNDER GE (NW) NOFRA COLA
PERIODICAL MAINTENANCE OF LIFTS WITH ESSENTIAL REPAIRS IMPROVEMENT AND RESCUE OPERATION OF LIFTS OF MARRIED OFFICER ACCN, ALKA, ARCHANA, ARADHANA AND 84 LEADING SAILORS ACCN (BRAMHAPUTRA, BETWA AND BEAS) UNDER GE (NW) KARANJA
Comprehensive Maintenance and Operation of Lifts at DDU Hospital, Hari Nagar, New Delhi for the year 2022-23, 2023-24 and 2024-25 (SH Comprehensive Maintenance of KONE Lifts at DDUH, Hari Nagar)
Improvement/Up-gradation of Defective/Outdated of 2 Nos old lifts into 2 Nos. New Lifts along with EI Works for Foot Over Bridge at Punjab Kesari, Near Wazirpur Depot, Ring Road, Delhi.
SITC of 3 nos. 13 Passenger Lifts for Admin. Building, Patto Panaji, Goa Against scrapping PART A SITC Portion, PART B AMC Portion and Part C Credit sale of old Lifts ic dismantling
Maintenance of Street Lighting of PWD Roads under West Electrical Division, PWD, New Delhi. (SH- Miscellaneous repair works of Techno make lifts installed at Multan Nagar FOB for the smooth operation of lifts)
MOEI, Pump, Lifts of Subway, Under Deck and FOB on Delhi PWD Roads under PWD Electrical Division South during 2022-23. (SHProviding and Fixing of missing accessories in Qutub and Panchsheel FOB lifts)
Replacement of four Nos. 8 Passenger lifts at IBCTS and Hostel in MSIB Complex at 35 S.P. Marg, New Delhi (SH: Conversion of Four Nos. 8 Passenger lifts from duplex to simplex system)
RMO Sub-station, DG Set, Wetriser system, Automatic fire alarm system, Air Conditioning plant and lifts at Aayakar Bhawan, Sector -17, Chandigarh. (SH:- Comprehensive Maintenance of 4 Nos. 13 Passenger ESCON make lifts)
Maintenance of Electrical and Mechanical installation at Pratyaksh Kar Bhavan, Rajkot during year 2024-25. SH - Comprehensive maintenance of 2 Nos. of 13 passenger lifts and 2 Nos. of car lifts (Make Johnson)
RMO Passenger Lifts at Main and WSS Building, Gents Hostel, Ladies Hostel at AIIH & PH, 110, C. R. Avenue, Kolutola, Kolkata during 2025-26 (SH: Comprehensive maintenance of 8 passenger OTIS make lifts).
ARMO E&M Services at Supreme Court of India, New Delhi Subwork/Packages: Providing Services of operation for lifts and escalators at Administrative Building Complex
ARMO E&M Services at Supreme Court of India New Delhi Subwork/Packages: Providing Services of operation for lifts and escalators at Additional Building Complex
Design and Construction of Civil, Structural, Architecture, MEP, VAC, Lifts, Escalators, Landscaping and Associated Works for Integrated Development of MMFC with Kuralagam at Broadway Chennai
Repairing of 1Nos. x10 passenger Otis make Elevator (Machine No. H008564) installed at BSNL Telephone Bhawan building Main Road , Sahid Chowk , Ranchi(recall).
Overhauling, Servicing, Maintenance and up-keeping of Lifts in functional condition
Comprehensive Maintenance of 9 Nos various capacity passenger Lifts
Comprehensive maintenance of OTIS make lifts 6 Nos 1.5 MPS and 1 No. 2.5 MPS
Supply, Installation, Testing And Commissioning Of Lifts at Various Departments in Savitribai Phule Pune University.
Sh-Annual Comprehensive maintenance 20 Nos. lifts (Kone Elevator Make) at 336 MS Houses at Mukherjee Nagar, New Delhi.
Comprehensive maintenance of Thyssenkrupp Make 16 passenger capacity Lifts as per NIT