Loading…
Loading…
14,148 results • Best match
All in all comprehensive maintenance for 06 Nos KONE Elevator installed at 264 Nos, Multy Storey, Gandhi Nagar, Jaipur.
Providing Eight (8) Passenger Elevator to Training Institute at Vegetable Market Yard Bowenpally under AMC., Bowenpally of Hyderabad District.
C/O Indoor Auditorium Chamba in Tehsil and Distt. Chamba (HP) (SH- Providing One No. (13 Passenger) Elevator therein)
Pdg. Comprehensive AMC for 2 Nos. Elevator (Make Schindler) for 5 Years installed in Kisan Bhawan, Sector-14, Panchkula.
Supply, Installation, Testing and Commissioning of fully automatic Machine room less (MRL) passenger glass elevator at NSCBI Airport, Kolkata
Bucket Elevator DE and NDE Shaft and its Sprocket Wheel Assembly and Cast Steel Supporting Roller Assembly 3 Items
DESIGN, MANUFACTURING, INSPECTION, SETTING AND ASSEMBLY AND CERTIFICATION OF HORIZONTAL STABILIZER, ELEVATOR, FIN, RUDDER ASSEMBLY JIGS, ICY GUAGES WITH
Gear box for Bucket Elevator and Gear box for Second Stage Crusher in Bottom Ash Handling System 2 Items
PROVIDING ANNUAL MAINTENANCE CONTRACT (A.M.C.) OF 01 Nos. 8 PASSENGER ELEVATOR( BG2) INSTALLED AT SP EOW OFFICE KATANGA JABALPUR
Design, Supplying, Installation, Testing and Commissioning of 1 No. 8 passenger machine room less Elevator in Himachal Bhawan, Chandigarh.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF RACK AND PINION TYPE ELEVATOR FOR FA AND HCSD SILO FOR NTPC MOUDA.
Construction of compound wall for Indira Park affected in Elevator Corridor from Indira Park to VST main road junction
Supply, Installation, Testing and Commissioning of 01 No. 10 Passanger Elevator at O/o Deputy Commissioner DAC, Jalandhar. (Punjab).
AMC of 3 nos Passenger Elevator (Thyssen krupp) at Court Complex at DJ Court Campus,Udaipur(FY 2026-27)
Replacement of buckets, Liners of 1000 mm bucket elevator unit No. 509 under Main Washing Plant of Rajrappa Washery
Providing Hydraulic Elevator from 5th floor to the 6th floor near staircase at TGPSC (Prathibha Bhavan) Building Nampally Hyderabad
Repairs/Maintenance of Surya Make 8 passenger Elevator (544 Kgs) in Viswaksena hostel block in SGS Arts college, Tirupati
Supply and Installation of 6 Passenger Hydraulic Elevator to Commissioner's Bungalow in Vijayawada Municipal corporation.1st Call General Funds
Comprehensive Annual Maintenance of Thyssenkrupp Make Passenger Cum Freight Elevator Installed at Kadra Power House And Kodasalli Power House
Supply,Installation,Testing and Commissioning of 13 Passenger Microprocessor based elevator of Administrative Building at Paradeep, Plastic Park,Paradeep
Comprehensive Annual Maintenance Contract for 6 passenger, Schindler Make Elevator installed at SMC, A-6, HUDCO PLACE, New Delhi
Biennial maintenance contract of 3T and 1T KONE make elevator installed in the 1x500 MW unit, SGTPS, MPPGCL, Birsinghpur
PROVIDING ANNUAL MAINTENANCE CONTRACT (AMC) OF 1 NOS 8 PASSENGER ELEVATOR (BG2) INSTALLED AT SP EOW OFFICE KATANGA JABALPUR.
Supply, Installation, Testing and Commissioning of Passenger Elevator G and 1 at Main Canteen, NCBS, GKVK Campus, Bengaluru - 560065
Conveyor and Elevator Textile Belting (Fire Resistant Belting for Surface Application) (V2) conforming to IS 1891 (Part 5) (Q3)
Custom Bid for Services - MODERNISATION WITH EXTENSION OF EXISTING ELEVATOR KONE MAKE AT BPCL KR CITY OFFICE AT KUNDANNUR
Unbranded Fire Resistant anti-static (FRAS) Conveyor and Elevator Textile Belting of length 50 meter and width 1000 millimeter
Conveyor and Elevator Textile Belting (Fire Resistant Belting for Surface Application) (V2) conforming to IS 1891 (Part 5) (Q3)
Conveyor and Elevator Textile Belting (Fire Resistant Belting for Surface Application) (V2) conforming to IS 1891 (Part 5) (Q3)
Repair and Overhauling Service - Multifunction Machines MFM; REPAIR OF SLING FOR HOISTING HORIZONTAL STABILIZER AND ELEVATOR; No; Buyer Premises
Custom Bid for Services - SERVICE CONTRACT FOR ECE MAKE ELEVATORS INSTALLED at DSTPS, MTPS, BTPS, KTPS, RTPS & HQ OF DVC FOR 2 YEARS Similar Category Operation and Maintenance Power House/Power Plant
COMPREHENSIVE MAINTENANCE OF ELECTRICAL PASSENGER LIFTS INSTALLED AT KABUL LINE (BLOCK NO 149,150,154 AND 163 ) AND TODAPUR ( P 6,7,8 ) UNDER GE(U) P AND M DELHI CANTT 10 (TOTAL LIFTS 14 NOS)
Renewal of 2 Nos. of 26 Persons bed cum passenger lifts and each 2 Nos. of 10 and 13 Persons passenger lifts at Theni Government Medical College and Hospital in Theni District.
Estimate for Design, supply installation testing and commissioning of 5 Nos. lifts in P1 P2 T1 T2 shafts and spillway access shafts along with decommissioning dismantling of existing lifts on RSD project.
Repair and Maintenance of 13 Nos lifts ( 10 Nos of SFA Campus and 03 Nos lifts of frontier Hqrs Campus) installed under Frontier Hqrs SSB Lucknow for the period of 12 months.
AME for Lifts for Srinivasam PAC and Madhavam Rest House pertaining to AE-II section in ESD-III, Tirupati for the period of 2024-25 to 2025-26(Part-A Johnson Lifts)
Replacement of 6 and 8 Passengers Beco make Lifts by 2 Numbers 10 Passengers Machine room less lifts (Under buyback)in 10 Court building complex at Nizamabad in Nizamabad district.(3rd Call).
OUTSOURCING OF SERVICES FOR OPERATION OF LIFTS AT POWAI AND WORLI ALONGWITH REPAIR AND MAINTENANCE OF ELECTRICALLY OPERATED LIFTS (8 PASSENGER, 10 PASSENGER, 13 PASSENGER) AT POWAI AND WORLI UNDER GE DAMAN
RMO of 1 No. 10 Passenger lifts installed at 26 Nos. Special type MS flats at Brahmaputra Apartment, Dr. B.D. Marg, New Delhi. (SH- Comprehensive maintenance of 1 No. 10 Passenger Lifts)
RMO of Sub-Stations, DG Sets, Wet Riser System, Fire Alarm System, Central Heating System, Lifts, STP installed in different Office buildings of LBSNAA, Mussoorie. (SH:- Comprehensive maintenance of Kone make Lifts.)
RMO Sub-Station, DG Set, Wetriser System, Automatic Fire Alarm System, Air Conditioning Plant & Lifts at Aayakar Bhawan, Sector 17, Chandigarh (SH: Comprehensive Maintenance of 4 Nos. 13 Passenger Escon Make Lifts)
Maintenance of Electrical and Mechanical installation at Pratyaksh kar Bhavan, Rajkot during 2025-26. SH: Comprehensive Maintenance of 02 Nos. of 13 passenger lifts and 02 Nos. of car lifts.(Make: Johnson)
MOEI AND FANS INCLUDING RMO OF WATER SUPPLY PUMP SER, 125 KVA DG SET, WET RISER, PASSENGER LIFTS ETC FOR AGs OFFICE, THRISSUR. SH: COMPREHENSIVE MAINTENANCE OF 2 NOS 13 PASSENGER LIFTS
Operation & Maintenance of 4 Nos. 8 Passenger Lifts at GPRA (Type-V & Type-VI), 30, Belvedere Road, Kolkata during 2022-23. (SH: Providing comprehensive maintenance of 02 (Two) Nos. IBIJI make lifts)
RMO of Sub-stations, DG Sets, Wet Riser System, Fire Alarm System, Central Heating system, Lifts, STP Installed in different office buildings of LBSNAA, Mussoorie.(SH: comprehensive maintenance of Johnson make Lifts)
RMO Sub-Station, DG Set, Wetriser System, Automatic Fire Alarm System, Air Conditioning Plant & Lifts at Aayakar Bhawan, Sector 17, Chandigarh (SH: Comprehensive Maintenance of 04 Nos. 13 Passenger ESCON make lifts)
AMe for Lifts for Srinivasam PAC and Madhavam Rest House pertaining to AE-II section in ESD-II, Tirupati for the period of 2024-25 to 2025-26(Part-A Johnson Lifts)
Annual maintenance of 3 number Lifts in the Dharwad District Court building and one number Lifts in the building of the Chief Engineers Office (North Zone) Dharwad for the year 2025-26.
RMO of Sub-Stations, DG Sets, Wet Riser System, Fire Alarm System, Central Heating System, Lifts, STP installed in different office buildings of LBSNAA, Mussoorie. (SH:- Comprehensive maintenance of Kone make lifts.)
Comprehensive Maintenance of CCTV system at ITO Skywalk, New Delhi