Loading…
Loading…
705 results • Best match
Civil works including ,Painting, Aluminium partition works, Furniture, Zebra blind curtains, Glazed window shutter etc.
Product Crusher Assembly, Pillow Block SN62 or equivalent for free end, Pillow Block SN622 or equivalent for fixed end, Driven Pulley with Sleeve PCD 400, Driven Pulley with Sleeve PCD 265, V Belt, Rotor Assembly, Crusher Chain
PROCUREMENT OF CASE MATTRESS HOSPITAL AND SHEET HOSPITAL WHITE BLEACHED 255 CMS X 175 CMS
Cork mug with embossed printing IOS SAGAR, Pen with Box IOS engraved, Magnet Rectangular IOS engraved, T Shirt with IOS Logo for FFC and Ships staff, Short with IOS Logo for FFC and Ships Staff, Jacket with IOS Logo for FFC and Ships Staff, IOS Sagar ... training, Pillow with ... with Pillow cover and ... and bedsheet , ...
Convective Patient Warming Blankets (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6116262 Dated : 22-04-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Pillows - Synthetic (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7017279 Dated : 18-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Separators, Wall Mounted Hangars, Cloth Hanging Wire, Motivational Posters, Study Lamps, Cloth Iron Stand, Door Curtain, Window Curtain, Locking Gate Arrangement, Wall Mounted Study Table, Illuminated Board, Cloth Dryer Stand, Floor Mat, Announcement System, Television, Drinking water cooler
HOUSING, BEARING, UCFC 206, HOUSING, BEARING, UCFC 208 L III, PILLOW BLOCK, DRIER PINION, 300 TPD NP
Provisions are given for demolishing brick work Roof sheet changing providing and fixing stainless steel and curtains
This work includes curtain blinds,wall panelling ,executive table,executive chair, visitors chair, cubboard,decorative painting work
Civil works including Painting, Aluminium Partition Works, Tile Work , Furniture, Zebra blind curtains, Sheet Roofing , Godrej Shelf, etc.
Highland Cot with IV Section, ICU Cot with 4 Section, Mattress for ICU Cot, Mattress for Highland Cot, Instrument Trolley, Steel Slotted Angle Rack, Steel Table, High Back Revolving Fitting Hydraulic Lift Cushion Seat and Back, Hospital Stool, Steel ... Table, Mattress for ... with Mattress
Sheeting, Tickings and Bedsheets (V2) as per IS 175 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Construction and Repair-Maintainance for Kasaragod Division office building 1,providing window curtains for HED office building 2,Mosquito nets
This work includes pvc paneling acoustic wall paneling calcium silicate false ceiling New Aluminium door curtains with zebra roller blinds carpet
Cotton Pillow (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6989139 Dated : 11-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 44548 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
MATFLOOR RUBBER 0.125" THICKNESS 3FT WIDTH 18FT LENGTH N0413-9238755, MATTRESS COIR N0451-1292394, PU FOAM MATTRESS WITH PRIMARY CLOTH COVER 75" X36" X3" N7210-000087, DOOR MAT COIR FIBRE CENTRE GREEN BORDER 28" X16" N7220-000014, BASKET WAIST WASTE PAPER N0461-R000142, BUCKET POLYTHENE 20 LTR CAPACITY N7240-000016
Spring Mattress (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6035427 Dated : 07-03-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
This estimate include provisions for the Supply of Consumables and washing charges required for the daily cleaning and maintenance of resthouse is includedengaging man mazdoor for urgent cleaning works washing charges for bedsheets towels etc
As decided the whole toilets in the building has to be provided electric heater and there was no hot water line provided And bed sheet for VIP room and other rooms and floor mat for rooms buckets and toilet cleaning utensils are included in thi
This estimate includes MDF locks concealed hinges handles lipping polishing drawer channel al partition dismantling tile work vitrified tile concrete curtain epoxy etc
Compressed Mattress (MHA) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6941974 Dated : 17-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Supply, conveyance and repairing, changing cloth, cleaning, washing, polishing etc. complete with all suitable and standard accessories etc. of Double size Settee, Double Ducker 6,small size Settee, Double Ducker cushion Three seat settee
he items included are cubicle telescopic drawer channels brass handles brass cupboard locks concealed hinges teak wood lipping painting window curtain hydraulic door closer
The scope of work includes Repair works such as Painting, installation of wind turbines, incinerator and curtains, repair of vehicle shed , septic tank cleaning etc
In this estimate included Aluminium sliding windows instead of old windows,False celing with T15 grid system of 600x600 mm module,Vertical Blind curtains etc.
Construction of 100 MLD WTP at Peruvennamuzhi with upward flow sludge blanket technology and laying transmission Main- Construction of Steel Bridges, Land Scaping and Protection Works
Facility Management Services - LumpSum Based - Crew Rest Room at Alappuzha; Facility management of Running Room; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Crew Rest ... of bed sheet and ... and pillow cover ; ...
Wooden Panelling, Washable Wallpaper, BWR grade plywood made table, Storage, Medium size framed art prints, Logo, False ceiling, Curtain , PVC Door and LED Strip Light
Maintenance work
Manpower Outsourcing Services - Minimum wage - Skilled; Others; Cook, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Others; Asst Cook Caretaker cum Supervisor, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; Waiter ... Waiter Bedding Cleaning ...
Bunk Bed Mattress (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6275271 Dated : 26-05-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest orders issued by Ministry of MSME, the bidder shall be exempted from the eligibility criteria of "Experience Criteria" as defined above subject to meeting of quality and technical specifications. The bidder seeking exemption from Experience Criteria, shall upload the supporting documents to prove his eligibility for exemption. 2. If the bidder is a Micro or Small Enterprise (MSE) as per latest orders issued by Ministry of MSME, the bidder shall be exempted from the eligibility criteria of "Bidder Turnover" as defined above subject to meeting of quality and technical specifications. If the bidder itself is MSE OEM of the offered products, it would be exempted from the "
The items included are dismntling tiles,laying new tiles,fixing curtains,plastic emulsion painting,Synthetic enamel painting,cement concrete ,carpenter for repairing doors windows,man mazdoor etc.
The estimate includesthe maintanance of MACT Quaters by Painting ,Replacing the sheet roof at porch ,replacing the curtains and also tile work for steps and waste pit included
Provisions are given for dismantling the exsisting old tiles and laying new tiles in the bathroom, providing curtains, partitions, painting, and interlocking back side of the office etc.
Custom Bid for Services - Electroplating of Dress No 2 C Button, Custom Bid for Services - Washing of Navy Blue Blankets Similar Category Hiring of Upholstery Service - Cleaning and Dry Cleaning Hiring of Upholstery Service - Cleaning and Dry Cleaning
Metal Beds, Foam Mattress, Steel Tables, Almirah Steel, chairs- office, Bed Side Table, Centre Table, Sofas, Restaurant Table, Executive Table Bidder Turnover (Last 3 Years) 47 Lakh (s)
Bomb Suit, Real Time View System, Explosive Vapour Detector, Electronic Stethoscope, Deep Search Metal detector, Non magnetic Tool Kit, Car Remote Opening Tool Kit, Non linear Junction Detector, Bomb Suppression Blanket
GENERAL-KLC- Urgent Maintenance and repairs-Providing horizontal blinds in Members reference branch and curtains in protocol section and painting of statues in front of Assembly building-General Civil Work
Vigilance and Anti Corruption Bureau, Central Zone, Kochi - 17-Painting of office and Providing Shelves and cup boards, Door and Window curtains, Notice board in the Special Cell, Third floor
OT Table, Anaesthesia Workstation, Anaesthesia Workstation with Volume and Pressure Control Ventilation, Adult and peadiatric ICU Ventilator, Infrared Clinical Infant warmer, Fowler Cot with Mattress, Dental Chair with Accessories
Mosquito Net MBI, Pillow with Hollow Polyester Fibres 650MM X 400MM MBI, Sheet Barrack 240 X 135 CM MBI, Slip Pillow MBI, Polish Leather Black MBI, Knife Clasp MBI, Optical Whitener Bottle MBI, Soap Box Plastic MBI, Track Shoes Size 10 for PTI MBI, Apron Cook KOC, Polish Leather Black KOC, Knife Clasp KOC, Optical Whitener Bottle KOC, Soap Box Plastic KOC, Mug SS Aristo No 4 Size KOC
In this estimate computer table cum cabins with side table for office room and assistant engineer room executive chair for AE and window curtain inoffice and AE room are included
The work includes laying M30 paver blocks of 6cm thickness providing curtain for windows Also DR msonry foundation for yard compound wall, solid bloc masonry plastering cement primer painting etc
KLC Section II Providing curtains for Nila Block in MLA Hostel room Nos are1 2 9 10 11 12 13 13A 29 30 38 39 42 43 48 49 51 52
100m deepening , cost of protection wall 62 m length and 3 m ht , const of curtain wall , lining of Apron , Abutment , Body wall , providing dowel bars , FRP shutters and locking arrangements