Loading…
Loading…
856 results • Best match
Carriage of spillaged coal from the drain of PS-3 to PS-4 and its approach area by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place Pont No. 5 for a lead less than 0.5 KM at Rajrappa Wash
Handling and Transport on Lumpsum Basis - Handling & Transport Service, HIRING OF SERVICES FOR TRANSPORTATION OF FLOW METERS FOR CALIBRATION TO METER PROVING FACILITY FOR UTTAR PRADESH AND BIHAR REGION, Handling and Transport on Lumpsum Basis - ... - Handling & ... & Transport Service, ... REGION, Handling and Transport on ... - Handling & ... & Transport Service, ...
Loading/unloading, painting, adjusting and testing of 50 kg. CI test weights, issue of verification certificates by State Legal Metrology department, Odisha as per Weights and Measures Act & Rule including providing labour for calibration and stamping of test wagon at Bondamunda Station, CKP Division, S.E. Railway for a period of two years
Transporting of all sorts of small fittings, tools & plants, consumables, switches, C.M.S. crossings, SEJs, Glued Joints etc. heavy materials on emergency basis in concerned to IOW & PWI stores by road with Trailor or Trucks including loading, ... loading, unloading , ...
Handling and Transport on Lumpsum Basis - Handling Service, Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service on Lumpsum Basis - Explosive van of carrying capacity of 10 Te
LOADING, UNLOADING AND TRANSPORTATION OF CONCENTRATE AND ENGAGEMENT OF PAY LOADER AT MOSABANI PLANT FOR SIX (06) MONTHS
69/Construction of Sheet Shed for Loading / Unloading point and miscellaneous civil work at newly constructed TRW Itki.
68/Construction of Sheet Shed for Loading / Unloading point and miscellaneous civil work at newly constructed TRW Khunti
Handling and Transport on Lumpsum Basis - Handling Service, Transport Service, Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling Service, Transport Service, Handling & Transport Service
Loading, Unloading and Transportation of Ore and Concentrate and Hiring charges of Payloader at Mosabani Concentrator Plant for Six (06) months
HIRING 04 NOS. MANPOWER (01 CRANE OPERATOR, 01 RIGGER AND 02 HELPERS) FOR LOADING, UNLOADING, MATERIAL HANDLING WORK AT DEP RANCHI
Design Fabrication, Supply Transportation Erection including loading unloading of LGSF Porta cabin Building of Size 16m X 3.5 m Ground Floor oNLY
Dismantling unloading, loading and unloading iron structure of CHP in respect of D(K), Dhori area.
Contract of loading, unloading of LPG cylinders and haulage clearing, cartage and miscellaneous works for 2 months period at Bokaro LPG Bottling Plant
Dismantling of 3.3KV two set 1000 GPM pump, motor from Mahuatand to IWSS CCD like loading, unloading, transporting charges, Cutting of iron, steel materials
Work of testing the weighbridge by loading unloading and shifting of 20 kg CI Test weights on the weighing platform at Road W/B of Block-II Area.
Dismantling transporting loading and unloading of Haulpack Shed near Workshop of ROCP SJ
Custom Bid for Services - ARC for loading, unloading, shifting, stacking of material & housekeeping in O&M, main Store, DVC, KTPS, Koderma Similar Category Operation and Maintenance Power House/Power Plant
Dismantling transporting loading and unloading of Haulpack Shed near HEMM Stores at ROCP SJ
Dismantling, loading and unloading of old and abandoned iron structures on platforms of Dhori Siding near old Karkhana of AADOCM.
GUNNY HANDLING AND TRANSPORTATION AT PPC AT GARHWA DISTRICT
Construction of sprinkler at loading and unloading point under Sawang GVP Ph-II, Kathara area
H. T. Bolt and H. T. Nut
Comprehensive logistics, transportation, safe lifting, loading, unloading, fitting, and fixing of Distribution Transformers of various capacities from designated Stores and TRW to designated sites and vice versa within the jurisdiction of ESA, JSR
Loading and unloading of C.I. test weight for testing and Calibration of weighbridges under Kusunda Area
Transportation of equipment/ spares/ materials including their loading and unloading
Handling and Transport on Lumpsum Basis - Transport Service
Work of loading and unloading of materials of ICCC system for commissioning at sites of Block-II Area
GUNNY HANDLING AND TRANSPORTATION AT ALL PPC AT PALAMU DISTRICT
Old Shed Dismantling and New Shed Fitting and Iron Materials Shifting Loading and Unloading for Kuya Departmental OCP Patch.
Miscellaneous work with testing in weighbridge like 20 ton weight transfer (loading and unloading) from Regional to KDS_II, 42 ton weight transfer (loading and unloading) Ena old WB to Ena new WB-II and unloading of 19 ton weight at Ena new WB-II
Custom Bid for Services - Translocation and related activities of 220 trees for proposed 132kV Solar Pooling Substation at DVC Maithon AND Transportation of Forest Materials (Timber/Logs/Fire wood) including numbering, loading, unloading & stacking.. Similar Category Tree Translocation Service
Loading and unloading of CI test weights for routine testing of Damoda weighbridge and KKC Link weighbridge under Barora Area.
REPAIRING and DISMANTLING MANUAL PULLING LOADING and UNLOADING and REASEMBLING 2 NOS PONTOON AT AKWMC OCP SUMP UNDER KATRAS AREA
Loading and unloading work of CI test weight for testing and calibration for stamping of the weighbridges under Kusunda Area.
Cutting, dismantling, stacking, loading and unloading transporting the iron and steel materials from Patherdih Coal Washery to Sudamdih Coal Washery.
40 Feet Long Rail Pole 70 No, Transporting Loading and Unloading by Crane and Accurate Place Shifting for Reg. Store
Custom Bid for Services - Appointment of Regular Handling and Transport contractor
For loading and unloading work of CI test weight for testing and calibration for stamping of the weighbridges Under Kusunda Area
Engagement of JCB on hire for loading and unloading of theft coal from peripheral village to stop coal pilferage under ROCP.
Handling and Transport on Lumpsum Basis - Explosive Van 06 Te carrying capacity
Handling and Transport on Lumpsum Basis - Transportation of of Poles by trailer
Handling and Transport on Lumpsum Basis - Explosive Van 06 Te carrying capacity
Handling and Transportation of Containers and Cargo at Tatanagar ,TATA Container Terminal, Jharkhand.
Making 2 nos. loading and unloading ramp platform near General shift Attendance room Rest shelter 7 and 8 Incline under Dhori Khas.
Loading and unloading of CI test weight from old khanudih rail W/B to reginal store Block-II Area for safe keeping