Loading…
Loading…
440 results • Best match
Digital Earth Resistance Meter (Q3), true rms clamp meter (Q3), Handheld Digital Infrared Thermometer (Q3), Digital Multimeter (Q3), Non - Contact Voltage Tester (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6697912 Dated : 23-09-2025 Bid Document 1/18, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category true rms clamp meter Time allowed for Technical Clarifications during technical evaluation 6 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC QUALITY ASSURANCE DEPARTMENT Auto CRAC Days 45 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Enamel, Synthetic, Exterior (A) Under Coating (B) Finishing Paint (V3) Confirming to IS 2932 (Q3), Aluminium Paint for General Purposes in Dual Container as per IS 2339 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6487558 Dated : 25-07-2025 Bid Document 1/12 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Enamel, Synthetic, Exterior (A) Under Coating (B) Finishing Paint (V3) Confirming to IS 2932 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC INDENTOR Auto CRAC Days 10 Quality Assurance Plan document 1753424603.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Energy meter, Current Transformer 1, Current Transformer-2, Current Transformer-3
PROCUREMENT OF ELECTRICAL CONSUMABLES
Industrial Switch (Q3) MSE Exemption for Years of Experience and Turnover
Ethernet CAT 6 armored cable
Refilling and supply of 2.5% LEL calibration gas in ONGC owned cylinders for a period of 3 years
Rain Suit (Q3)
Unified Storage System
NDT testing for silos
Industrial Safety Shoes, Electrical Safety Shoes
HOSE SS CORRUGATED 3" ID, 300# FLANGE, HOSE SS CORRUGATED 2" ID, 300# FLANGE, HOSE SS CORRUGATED 2" ID, 150# FLANGE
Caustic Soda Lye
Dosing pump (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6750650 Dated : 08-10-2025 Bid Document 1/9 Number of Auto Extension count 2 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Dosing pump Time allowed for Technical Clarifications during technical evaluation 6 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC QUALITY ASSURANCE DEPARTMENT Auto CRAC Days 45 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Industrial Washer Extractor, Industrial Dryer Tumbler
LED Light fitting (well glass light fitting), LED Light Fitting (Tube Light Type)
CLEAN AGENT 10 KGS HFC 227, CONV HEAT SMOKE DETECTOR, CONV MANUAL RELEASE SWITCH, CONV MANUAL ABORT SWITCH, 2 ZONE CONV SINGLE AREA GAS RELEASE PANEL WITH BATTERIES, CONV HOOTER CUM FLASHER, SUPPLY OF PVC INSULATED FRLS COPPER ARMOURED ALUMINIUM ... CHARGES, FREIGHT CHARGES
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover
Life buoy with life buoy life line and life buoy light, Life buoy life line, Life buoy light
Pour Point Depressant (PPD)/Flow Improver- EOA Kakinada MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Bid Number ( ) : GEM/2024/B/5242168 Dated : 02-08-2024 Bid Document 1/8 Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC INDENTOR Quality Assurance Plan document 1722593795.pdf Evaluation Method Total value wise evaluation Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 43629000 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 17 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Manager (MM) Oil And Natural Gas Corporation Limited, Central Procurement Department, 8th Floor, Core 4, Scope Minar, Laxmi Nagar, New Delhi-110092 (Oil And Natural Gas Corporation Limited) Splitting
Group A1 Supply price for item sl No 01.001 of the MR, Group A2 Supply price for item sl No 01.002 of the MR, Group A3 Supply price for item sl No 01.003 of the MR, Group A4 price for item sl No 01.004 of the MR, Group A5 Supply price for item sl No ... A1 Freight charges ... A2 Freight charges ... A3 Freight charges ... A4 Freight charges ... A5 Freight charges ...
Compressed Helium Gas Conforming to IS 15583 (Q2)
Custom Bid for Services - First mile from COD to Railway Yard- (Vizag filling plants to Vizag ICD), Custom Bid for Services - Container handling Charges at Vizag ICD, Custom Bid for Services - Rail Freight Vizag ICD to FCON, Custom Bid for Services - Container handling charges at FCON, Custom Bid for Services - Last Mile connectivity from FCON to Patna COD, Custom Bid for Services - Last Mile connectivity from FCON to Muzaffarpur COD, Custom Bid for Services - Last Mile connectivity from FCON to Gaya COD
Custom Bid for Services - COMPREHENSIVE AMC DEKTOP PCS ALL IN ONE PCS LAPTOP SERVER PC PRINTERS Similar Category Annual Maintenance Service - Desktops, Laptops and Peripherals
Grease, Lithium Base, EP - 2 (BEML) (Q3) (3 (3 ))
Custom Bid for Services - Providing professional services for operation and maintenance of 5NosCONCOR Owned 45T 4HighReach Stacker Similar Category Operation And Maintenance Of Other Machines And Plants
High Viscosity Index Anti - Wear Hydraulic Oils (Q3) (3 (3 ))
High Viscosity Index Anti - Wear Hydraulic Oils (Q3)
Antifreeze Coolant as per IS 5759 (Q3)
Custom Bid for Services - Hiring of Professional Services for containers Inventory Management through Hand Held Terminals HHTs to be provided by CONCOR at MMLP Visakhapatnam CCJS Andhra Pradesh Similar Category Support Services
Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System
Custom Bid for Services - Schedule I Daily interior cleaning exterior cleaningwashing toilet cleaning carriage watering positive locking and security of coaches during PM attention Destination Board and Placard boards changing on PM trains and ... and Freight depotNLPD
Mechanical Seal for Cargo DM Water Pump No. 1 and 2, Development Cost, Mechanical Seal for Salvage Pump 2 _MER and DGR, Mechanical Seal for Sludge Pump -1_DGR, Mechanical Seal for Lub Oil Transfer Pump2, Mechanical Seal for HT Fresh Water Stand by Pump 2, Mechanical Seal for LT Fresh Water Stand by Pump 2, Mechanical Seal for Ventilation Cooling Pump Vertical, Mechanical Seal for Sludge Pump 1_MER, Mechanical Seal for Aux Fresh Water Pump 1, 2 and 3, Mechanical Seal for Fire Main Pump 1, 2, 3 and 4, Mechanical Seal for Aux Sea Water Pump 1, 2 and3, Mechanical Seal for Hot Water Circulating Pump, Mechanical Seal for Domestic Cold Fresh Water Pump 2, Mechanical Seal for Domestic Hot Fresh Water Pump 2, Mechanical Seal for Domestic Hot Water Circulating Pump
line matrix printer Average Turn Over of Last 3 Years 15 Lakh (s) Experience with Gov. Required 5 Year (s) Line Matrix Printer ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values Ungrouped Type of Line Matrix Printer ... Gothic, Courier , ...
line matrix printer Line Matrix Printer ( 2 ) Technical Specifications Specification Specification Name Values Allowed Values Ungrouped Type of Line Matrix Printer Standard Standard, High Definition Print Method Impact Line Matrix - Type of Enclosure ... Gothic, Courier , ...
CONSULTANCY SERVICES FOR ASF DEVELOPMENT AT GWALIOR AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ASF DEVELOPMENT FOR 8 MONTHS AT GWALIOR AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - SOIL INVESTIGATION FOR ASF DEVELOPMENT AT HUBLI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ASF DEVELOPMENT AT HUBLI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ASF DEVELOPMENT FOR 8 MONTHS AT HUBLI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - SOIL INVESTIGATION FOR ASF DEVELOPMENT AT MOHALI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ASF DEVELOPMENT AT MOHALI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ASF DEVELOPMENT FOR 8 MONTHS AT MOHALI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - SOIL INVESTIGATION FOR ASF DEVELOPMENT AT PRAYAGRAJ AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ASF DEVELOPMENT AT PRAYAGRAJ AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ASF DEVELOPMENT FOR 8 MONTHS AT PRAYAGRAJ AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - SOIL INVESTIGATION FOR ASF DEVELOPMENT AT RAJAHMUNDRY AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ASF DEVELOPMENT AT RAJAHMUNDRY AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ASF DEVELOPMENT FOR 8 MONTHS AT RAJAHMUNDRY AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ADDITIONAL TANKAGE CONSTRUCTION AT RAIPUR AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ADDITIONAL TANKAGE CONSTRUCTION FOR 4 MONTHS AT RAIPUR AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ADDITIONAL TANKAGE CONSTRUCTION AT BHUBANESHWAR AIRPOR; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ADDITIONAL TANKAGE CONSTRUCTION FOR 4 MONTHS AT BHUBANESHWAR AIRPOR; Project Management; No; Hybrid(As specified in Bid Details 2/34 scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ADDITIONAL TANKAGE CONSTRUCTION AT SURAT AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ADDITIONAL TANKAGE CONSTRUCTION FOR 4 MONTHS AT SURAT AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ADDITIONAL TANKAGE CONSTRUCTION AT VARANASI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ADDITIONAL TANKAGE CONSTRUCTION FOR 4 MONTHS AT VARANASI AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR ADDITIONAL TANKAGE CONSTRUCTION AT PATNA AIRPORT; Project Management; No; Hybrid(As specified in scope of work), Hiring of Consultants - Milestone/Deliverable Based - RESIDENT ENGINEER FOR ADDITIONAL TANKAGE CONSTRUCTION FOR 4 MONTHS AT PATNA AIRPORT; Project Management; No; Hybrid(As specified in scope of work)
Prefab Hut/House of size 4.88 M x 4.88 M - As per GeM Drawing Average Turn Over of Last 3 Years 500 Lakh (s) Experience with Gov. Required 3 Year (s) MSME Exemption For Years Of Experience And Turnover Yes Prefab Hut/House Of Size 4.88 M X 4.88 M - ... Transpotations/ Freight charges ...
Prefab Hut/House of size 4.88 M X 9.76 M - As per GeM Drawing Average Turn Over of Last 3 Years 300 Lakh (s) Experience with Gov. Required 3 Year (s) Prefab Hut/House Of Size 4.88 M X 9.76 M - As Per GeM Drawing ( 37 ) Technical Specifications ... Transpotations Freight charges ...
Tamper Evident Seals for LPG cylinders (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ... unloading, freight , ... & freight charges. ...
Safety Cap for Self Closing Valves of LPG Cylinders (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc ... unloading, freight , ... & freight charges. ...