Loading…
Loading…
2,388 live1,112 closing this weekmost from PHE and Department Of Military Affairs
2,388 results • Best match
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. I and II under Khargram W/S Scheme, Block-Khargram, through Manual Motor Starter Panel at P.H. No. I, II and III under SALAR W/S Scheme, Block
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I, II under Parulia W/S Scheme Block Khargram and P.H. No. I, II of Zone II under Beniakhali W/S Scheme Block - Domkal , P.H. No. I, II of
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I under Badda W/S Scheme, P.H. No. I under Fatepur W/S Scheme Block - Burwan , P.H. No. III under Bele W/S Scheme Block- Khargram , Dist-M
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I under MANIGRAM BALARAMBATI W/S Scheme, Block SAGARDIGHI, through Auto Motor Starter Panel at ZONE I P.H. No. I, II and ZONE II P.H. No. I, II
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under SIKARPUR W/S Scheme, Block FARAKKA , through Auto Motor Starter Panel at P.H. No. I and II under GIRIA KISMAT W/S Scheme, Block-RAG
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under SAGARPARA W/S Scheme, Block JALANGI, through AUTO Motor Starter Panel at P.H. No. AIRP HIGH LIFT, P.H. No. I and II under BRINDA
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under CHandkathi W/S Scheme, Block- NAWDA ,through Auto Motor Starter Panel at P.H. No. I and II under DHULOURI W/S Scheme, Block-DOMKAL
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at ZONE I P.H. No. I , II and ZONE II P.H. No. I , II under SAGARDIGHI W/S Scheme and through Auto Motor Starter Panel at P.H. No. I under AUGMENTATION OF
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I, II , HIGH LIFT , ZONE II P.H. No. I, II AND ZONE III P.H. No. I, II under MURADPUR W/S Scheme, Block JALANGI , Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I, II , ZONE II P.H. No. I, II and ZONE III P.H. No. I, II under BHASAIPAIKAR W/S Scheme, Block-SAMSERGANJ , through Auto Motor Starter P
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I, II , III under BENIPUR W/S Scheme, Block-BHAGAWANGOLA II, through Auto Motor Starter Panel at ZONE I P.H. No. I, II and III AND ZONE II P.H.
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under BAHADURPUR W/S Scheme, Block- SUTI I , through Auto Motor Starter Panel at P.H. No. I and II under KISOREPUR W/S Scheme, Block-SUTI
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I, II and III under REJINAGAR W/S Scheme, Block-BELDANGA II, through Manual Motor Starter Panel at P.H. No. I and II under MAHULA W/S Scheme, Bloc
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under JORGACHA W/S Scheme, Block-DOMKAL and through Auto Motor Starter Panel at P.H. No. I , II and III under JURANPUR W/S Scheme, Bloc
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I, II and ZONE II P.H. No. I, II under HAZI MAHAMMADPUR W/S Scheme, Block-LALGOLA, through AUTO Motor Starter Panel at P.H. No. AIRP HIG
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under RAMCHandRAPUR W/S Scheme, Block RANINAGAR II and through Manual Motor Starter Panel at P.H. No. I and II under NABIPUR W/S Scheme,
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under UDAY NAGAR W/S Scheme, Block-JALANGI, through Auto Motor Starter Panel at Zone II Part A Pump House I and II (Augmentation under JA
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I, II, III under ZONE II of Hizole W/S Scheme, Block-KandI, through Auto Motor Starter Panel at P.H. No. I, II under PARBATIPUR W/S Scheme,
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under SUNGAI W/S Scheme, Block BERHAMPORE,through Auto Motor Starter Panel at P.H. No. I and II under RAMNAPARA W/S Scheme, Block-BHAGAWA
Silt cleaning and scraping work Of Bewar Dy from km 0.000 to km 5.700 ( using a Poclain machine) And From km 10.000 to km. 15.263 using machinery on the unlined section and using manual labor only on the lined section from km 5.700 to km 10.000.
MTPS-II-M-II-Circle-CHP-I- Reconditioning of 870 PST Scoop Coupling, inclusive of required consumables etc., for Ring Granulators in Secondary Crusher House
Appointment of contractor for Loading and Transport of Uncrushed Limestone from Factory stock to the Crusher inside the Cement Plant, Ariyalur Cement Works, Ariyalur District
Main compressor assembly for electric locos, 1000 liters per minute capacity with driving motor 14 HP, 10.4 Kw rating, speed 1000 RPM, working pressure 10.5 kg/ Sq.cm, free air delivery 1000 LPM with H class Insulation as per CLW spec, No CLW/ES/C-34 Alt.O (As Per UVAM ID:2100711).
Custom Bid for Services - Bidder to quote lumpsum amount for contract services for service engineers on call basis for two Chhabi make charges installed at GAIL Khera Compressor Station inclusive of GST and all other expenses for 06 mandays for a per.. Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - REPAIR WORK AND COMPLETE OVERHAULING OF HEAT LESS ADSORPTIO N TYPE AIR DRYERS ELGI MAKE LOCATED AT CENTRALIZED COMPRESSOR ROOM QTY 06 NOS MPF MC NOS 3639 3640 3512 & 3513 MODEL ELRD 900A AND 02 NOS PORTABLE AIR DRYERS MODEL.. Similar Category Repair and Overhauling Service
Combi Cooler, Suitable for Screw type compressor Model No. KES 160, Part No. : - 274.02. 580.50
BMD-Service Charges for online testing and pressure setting of Boiler Safety valves of 1X500 MW KTPP Unit
Supply of M S Grill for Walkways of boiler & Coal Mill Plateform and stairs at BMD-I WTPS
ARC of cleaning work of Boiler and its auxiliaries for Unit-I and Unit-II, DCRTPP, Yamuna Nagar
CLYDE BERGEMANN INDIA PRIVATE LIMITED Blower Crg Assly W/o GM, 88.9, Axial SB RS-A For APH Soot Blower (Model-RSG-AR) , PART ID-91MX0400-14 ( 1 Unit ), Gear Box, W/IEC Adptr, For APH Soot Blower (Model-RSG-AR) , Part ID - 190234, ( 1 Unit )
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5211G Work of servicing of various gear box of ESP and Wall blower/LRSB of Unit no-6 Ukai TPS on as and when required basis (BMD-6); WT-5211G Work of servicing of var..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Deputation of GERB Expertise Person for Crusher Spring & Damper replacement work; As per SOW
Water boiler of 30 ltrs capacity for hot buffet LHB type coaches generally confirming to IS:3412 or latest along with control box and necessary plumbing & tap arrangement on a common base plate confirming to RCF s Specification No. EDTS-118, REV -E with amendment No.2 or latest & Drg.No. LH 72221, Alt- a or latest
Hiring of machinery for leading of Rails, Fishplates & other material from various locations over Northern Railway including shifting of Rails and Fabricated Glued joint and other allied works to facilitate Fabrication of insulated Glued Joints at Glued Joint workshop, in Track Depot Ghaziabad for a period of Two years.
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I, II,III AND ZONE II P.H. No. I, II under SARBANGOPUR W/S Scheme, Block-NAWDA and through Auto Motor Starter Panel at P.H. No. I and
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under BARASATUI W/S Scheme, Block-BERHAMPORE and through Auto Motor Starter Panel at ZONE I P.H. No. I, II and III and ZONE II P.H. No. I
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE- I P.H. No. I, II , III ZONE II P.H. No. I, II and ZONE-III, P.H. No. I and II under KARIMPUR - JALANGI W/S Scheme, Block-JALANGI , through Manual Mot
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under KUSUMGACHHI W/S Scheme, Block-SUTI II, through Auto Motor Starter Panel at P.H. No. I and II under HARUA W/S Scheme, Block-SUTI-I,
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under KEYADANGA W/S Scheme, Block-SUTI II, through Auto Motor Starter Panel at ZONE I P.H. No. I and II ,under PROSADPUR W/S Scheme, Bloc
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I , II and ZONE II P.H. No. I , II under RATURI W/S Scheme, Block SUTI I and through Auto Motor Starter Panel at P.H. No. I under UMARPU
Providing, supplying and Installing of pumping machinery at different pumping station in petlad.
Custom Bid for Services - HIRING OF SERVICES FOR HANDLING AND DISPATCH OF LIQUID HYDROCARBON AT GAIL GANDHAR FOR 24 MONTHS PROVIDING OF RESOURCES AS PER SCC AND SOW OF TENDER DOCUMENT BIDDER HAS TO QUOTE SERVICE CHARGE AND GST THEREON ON TOTAL ... Gas Compressor Station
Fabrication of SH back pass tube bends (OD 50.8 mm x 7.11mm Thickness SA 213 T12) required for Unit-1 & 2 Boilers on supply of free straight tubes by M/s APPDCL
Replacement of the damaged insulation over FG Ducts, steam pipe line, around boiler Ist & II nd pass & Replacement of Refractory at various locations of Boiler of Unit-I & II as and when required for the period from 01.10.2026 to 31.03.2027 including in Annual Overhauling works.
SHIFTING OF EXISTING 200 MM Dia. PVC KALAVAD GROUP RWSS PIPE LINE OF NANA VADALA VILLAGE AT MARUTI STONE CRUSHER SITE UNDER M&R TO KALAVAD GROUP
SUPPLY OF 3TON, 3PHASE SPLIT ACS FOR PLC PANELS OF CRUSHER HOUSE CONTROL ROOM AND STACKER PLCS AND COAL SAMPLING PLC ROOM IN THE CHP AREA AND
175 02 203 1 GASKET, 172 01 259 2 GASKET, TU 005 6016 872T25 15 BORE DIA 25MM, 188 31 205 GASKET, 188 31 203 GASKET, 188 31 250 GASKET PACKING, 188 31 251 PACKING, 188 31 252 PACKING, 188 31 253 PACKING, 188 31 233 LOCKING PIN, 188 31 234 LOCKING ... NK003329 AIR COMPRESSOR GASKET, ...
Supply Various Coal mill Spares/Fabricated items for coal mill type XRP 803 of Boiler-7 at Wanakbori TPS
Custom Bid for Services - Overhauling, Maintenance, Repair, Troubleshooting activities of Steam Turbine and Centrifugal Compressors for TA 2026 Similar Category Repair, and Installation of Plant Systems/Equipments (Version 2)