Loading…
Loading…
2,770 live1,123 closing this weekmost from PHE and Department Of Military Affairs
2,770 results • Best match
Supply of M S Grill for Walkways of boiler & Coal Mill Plateform and stairs at BMD-I WTPS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Deputation of GERB Expertise Person for Crusher Spring & Damper replacement work; As per SOW
Water boiler of 30 ltrs capacity for hot buffet LHB type coaches generally confirming to IS:3412 or latest along with control box and necessary plumbing & tap arrangement on a common base plate confirming to RCF s Specification No. EDTS-118, REV -E with amendment No.2 or latest & Drg.No. LH 72221, Alt- a or latest
Hiring of machinery for leading of Rails, Fishplates & other material from various locations over Northern Railway including shifting of Rails and Fabricated Glued joint and other allied works to facilitate Fabrication of insulated Glued Joints at Glued Joint workshop, in Track Depot Ghaziabad for a period of Two years.
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I, II,III AND ZONE II P.H. No. I, II under SARBANGOPUR W/S Scheme, Block-NAWDA and through Auto Motor Starter Panel at P.H. No. I and
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under BARASATUI W/S Scheme, Block-BERHAMPORE and through Auto Motor Starter Panel at ZONE I P.H. No. I, II and III and ZONE II P.H. No. I
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE- I P.H. No. I, II , III ZONE II P.H. No. I, II and ZONE-III, P.H. No. I and II under KARIMPUR - JALANGI W/S Scheme, Block-JALANGI , through Manual Mot
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under KUSUMGACHHI W/S Scheme, Block-SUTI II, through Auto Motor Starter Panel at P.H. No. I and II under HARUA W/S Scheme, Block-SUTI-I,
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under KEYADANGA W/S Scheme, Block-SUTI II, through Auto Motor Starter Panel at ZONE I P.H. No. I and II ,under PROSADPUR W/S Scheme, Bloc
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I , II and ZONE II P.H. No. I , II under RATURI W/S Scheme, Block SUTI I and through Auto Motor Starter Panel at P.H. No. I under UMARPU
Custom Bid for Services - HIRING OF SERVICES FOR HANDLING AND DISPATCH OF LIQUID HYDROCARBON AT GAIL GANDHAR FOR 24 MONTHS PROVIDING OF RESOURCES AS PER SCC AND SOW OF TENDER DOCUMENT BIDDER HAS TO QUOTE SERVICE CHARGE AND GST THEREON ON TOTAL ... Gas Compressor Station
Providing, supplying and Installing of pumping machinery at different pumping station in petlad.
Design, supply, installation and commissioning of eletroplating equipment and machinery for new EPS
175 02 203 1 GASKET, 172 01 259 2 GASKET, TU 005 6016 872T25 15 BORE DIA 25MM, 188 31 205 GASKET, 188 31 203 GASKET, 188 31 250 GASKET PACKING, 188 31 251 PACKING, 188 31 252 PACKING, 188 31 253 PACKING, 188 31 233 LOCKING PIN, 188 31 234 LOCKING ... NK003329 AIR COMPRESSOR GASKET, ...
Fabrication of SH back pass tube bends (OD 50.8 mm x 7.11mm Thickness SA 213 T12) required for Unit-1 & 2 Boilers on supply of free straight tubes by M/s APPDCL
SHIFTING OF EXISTING 200 MM Dia. PVC KALAVAD GROUP RWSS PIPE LINE OF NANA VADALA VILLAGE AT MARUTI STONE CRUSHER SITE UNDER M&R TO KALAVAD GROUP
SUPPLY OF 3TON, 3PHASE SPLIT ACS FOR PLC PANELS OF CRUSHER HOUSE CONTROL ROOM AND STACKER PLCS AND COAL SAMPLING PLC ROOM IN THE CHP AREA AND
Replacement of the damaged insulation over FG Ducts, steam pipe line, around boiler Ist & II nd pass & Replacement of Refractory at various locations of Boiler of Unit-I & II as and when required for the period from 01.10.2026 to 31.03.2027 including in Annual Overhauling works.
Supply Various Coal mill Spares/Fabricated items for coal mill type XRP 803 of Boiler-7 at Wanakbori TPS
Custom Bid for Services - Overhauling, Maintenance, Repair, Troubleshooting activities of Steam Turbine and Centrifugal Compressors for TA 2026 Similar Category Repair, and Installation of Plant Systems/Equipments (Version 2)
Work of Overhauling of sump pumps at Various Conveyor Tunnel, F.O. Trench and wagon tippler-1&5 tunnel of CHP, WTPS.
"Set of Piston & Cylinder Assembly Dia 100 mm (LP) for Compressor Model No. PEL 1000 consisting of 10 Items as per Annexure `A? 1. 01-113-201 Compressor Ring 02 Nos. 2. 01-113-202 Stepped Comp. Ring 01 No. 3. 01-113-203 Slotted Oil Ring 01 No. 4. 01-113-204 Piston Dia 100 mm 01 No. 5. 01-113-205 Gudgeon Pin Dia 20 mm 01 Nos. 6. 01-113-206 Circlip B-20 02 Nos. 7. 01-113-207 Gasket 01 No. 8. 01-113-208 Cylinder Dia 100 mm 01 No. 9. 01-171-601 Hex Bolt M 12x75 06 Nos. 10. 01-174-701 Spring Washer M12 06 Nos.
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I, II and ZONE II P.H. No. I, II and III under BALI W/S Scheme, Block-NAWDA , through Auto Motor Starter Panel at P.H. No. I ,II, III an
Goods Transportation service - Monthly Based Service - Within city; Construction Material, Machinery & Equipment; Pickup Truck
Goods Transportation service - Monthly Based Service - Within city; Construction Material, Machinery & Equipment; Pickup Truck
P F fully automatic star delta alongwith allied accessories for 80 HP pumping machinery
Goods Transportation service - Monthly Based Service - Within city; Construction Material, Machinery & Equipment; Pickup Truck
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5232G the work of rectification and restoration of boiler roof top at 64 meter in Boiler Unit Nos 3 to 5 at GSECL Ukai TPS BMD 2; As per Schedule B and scope of work m..
SPECIAL REPAIR TO BOILER OF 850 KG/HR CAPACITY OF ENGINE DIVISION AT 3 BRD UNDER GE (AF) MC CHANDIGARH
TGGENCO-YTPS-Supply of Seal ring segments for HP1103 Bowl mills required for Boiler-III and IV/YTPS/Stg-II.
Fridge Whirlpool 184L, Wooden Packing, Onsite Compressor Warranty for 1 year, Onsite Warranty for 1 year, Accessories
AC 1.5 Ton Hot and Cold, Stabilizer, Compressor warranty 3 Years, Onsite electrical Fitting, Onsite Quaterly Maintenance
Cross Assy, Cable Assy Clutch, Rubber Hose, Hose Front Flexible, Oil Seal for Crank Shaft, Compressor Assy
Various Routine, preventive and breakdown maintenance works of conveyor system at coal handling plant of WTPS on as and when required basis.
No Plane Ring Hammers For Elecon Make Crushers M/C No. CO/0651/33. (1 Set= 26 Nos. ) Manganese Steel (Mn- ( 2 set ), Days Toothed Ring Hammers For Elecon Make Crushers. M/C No. CO/065 (1 Set= 28 Nos. ) Manganese Steel (Mn-11 ( 2 set ), Toothed Ring ... Make Crusher (set) ... Make Crusher (set) ...
Construction Work Of CC Road, RCC Under Ground Sump, RCC E.S.R., Pipeline, Pumping Machinery, Animal Furnace Shed, Smashan Shed, Otta, Fencing, Reno. Shed, Compound Wall With Wire Fencing, RO Water Cooler And 2MLD Under Ground Sump, As per various Location Chart At. Upleta Dist.: Rajkot Under 15th Finance Grant, Manoranjankar Grant And SJMMSVY
BMD-Availing the services to carry out various Non-destructive examinations (NDE) in 1X500MW boiler during upcoming capital overhauls 2026-27
TGGENCO-YTPS-Supply of T and P items like Welding Machines, Electrode Drying ovens required for Unit-II Boiler, Stage-I.
TGGENCO-BTPS-STAGE-II-BM-Division- Complete Overhauling of burner Assemblies of Unit-4 Boiler during the Overhaul in 2026-27
Custom Bid for Services - SCHEDULE 1 RAJKOT RO Digital Automatic N2 Tyre inflator, Custom Bid for Services - SCHEDULE 2 SURAT RO Digital Automatic N2 Tyre inflator Similar Category Operation And Maintenance Of Gas Compressor Station Operation And ... Gas Compressor Station
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Repair of compressor with material; Service Provider
Replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, Take up pulley bearings, opening and closing of R.C.feeder doors, replacement and ... reducer gearbox , ... of boiler and ... to Boiler coal ...
The Work of As and when required Item rate contract for Maintenance works - routine / schedule / preventive / breakdown of K.G.Khosla make Air compressors with associated auxiliaries of Unit no. 1,2 & 3 of WTPS.
Supply Erection and Commissioning of 18 Channel Acoustic Steam Leak Detection system with manual purging for Tower Type Boiler pertaining to stg2
Supply and Application of High Velocity Oxy Flame Thermal Spray Coating in Various erosion Prone tubes of Boiler Unit 7 at WTPS
Procurement of Shell and Tube type Working Oil Cooler(WOC) installed in BHEL make 200KHI Boiler Feed Pump at Stage-I, WTPS.
LV7 MARUTI27131-56B00YOKE JOINT FLANGE, LV7 STLNF- 8068100ASSY REAR VIEW MIRROR LH RH, LV7 TATA2805- 002703CYLINDER SLEEVE, LV7 MARUTI37200M83260- 23HSWITCH ASSY CHANGE OVER, LV7 MARUTI72115M57C10NET FRONT GRILL, LV7 STLN VF F- 4207442PISTON FOR ... STLN4310-003754COVER AIR COMPRESSOR , ...
FILLING VALVE PN 200, RECOILER STARTER BLACK, ENGINE AIR FILTER, V-BELT, SPZ 1143 LONG (GATE XPZ 1143), KOHLER ENGINE OIL 15W40 CH4-1.5 LTR, PRESSURE VALVE, INTER-FILTER EXCH. F. 77180, GAUGE, BAUER COMPRESSOR OIL, SYNTHETIC 1 LTR, BAUER COMPRESSOR OIL SYNTHETIC 05 LTR
Engagement of Labour and Machinery for Track Maintenance in Stage 1A, Stage 1B and Poonamallee Depot