Loading…
Loading…
5,035 results • Best match
Supply of ID fan connecting coupling (Out put) of unit 3 boiler
Procurement of Flanged Electrodes for Electronic water level indicator of Boiler drum
13MM & 6MM STEEL WIRE ROPES FOR UNIT-5 KONE MAKE BOILER ELEVATOR
Provide New Boiler and Gas Pipe Line in Prasadam Counters at Uphill
Supply of Straight tubes for RH, Economizer and DNPSH of 500MW Boiler
Overhauling of Valves in Unit-I Boiler for the year 2021-22
Procurement of SS shafts for dampers of Unit-7 boiler,500 MW
Overhauling of Valves in Unit-II Boiler for the year 19-20
Overhauling of soot blower in Unit I Boiler during 2024-25 overhaul
Overhauling of Soot blowers in Unit-2 Boiler during 2022-23 overhaul
Overhauling of Soot blowers in Unit-2 Boiler during 2023-24 overhaul.
Procurement of Spares for Portable Pipe Beveling Machine for unit-7 Boiler
Procurement of Spring Seal Assemblies for Various gates in 500 MW Boiler.
Procurement of spares for soot blowers of boiler/unit-7/500MW/Dr.NTTPS
Procurement of SS shafts for dampers of Unit-7 boiler,500 MW
Procurement of spares for soot blowers of boiler/unit-7/500MW/Dr.NTTPS
Procurement of Erosion Protection Shields for Re heater of Boiler unit 7
Procurement of Boiler waste water pump assembly and spares for NTPC Unchahar
Supply of Aux Boiler Gun Assembly of Fives combustion systems Pvt Ltd
PROCUREMENT OF SPARES FOR BOILER DRAIN OIL TRANSFER PUMP FOR NTPC KUDGI
OVER RUNNING CLUTCH AND AIR MOTOR AND ITS SPARES OF BOILER(1X600MW)
Replacement of eroded tubes in Unit-2 Boiler during 2022-23 overhaul
Supply of ID fan connecting coupling (Out put) of unit 3 boiler
PROCUREMENT OF WELDING ELECTRODES E7018 1 FOR BOILER OF NTPC KUDGI STPS
Works on Air bottles, Boiler, STP and OWS on ORV SINDHU SADHANA
Custom Bid for Services - Study NG Firing in NCO Boiler by Fives
OVERHAULING OF ACCOMMODATION LADDER GEAR BOX
SUPPLY OF WALL BLOWER AND LRSB SPARES FOR BOILER PRESSURE PARTS
12 mm Additional safety sling for Compressor to loco body
Custom Bid for Services - Supply and installation of LPG Compressor
High Pressure Air Diesel Driven Compressor for charging Diving sets
Procurement of Silica Gel for Air Drying units/Compressor House.
SUPPLY OF ACTIVITED ALLUMINA FOR AIR DRIERS OF COMPRESSOR HOUSE
SUPPLY OF ACTIVITED ALLUMINA FOR AIR DRIERS OF COMPRESSOR HOUSE
procurement of water cooled condenser for AC compressor YCD-101A
Procurement of Silica Gel for Air Drying units/Compressor House.
PROCUREMENT OF SPARES FOR ELGI MAKE NH-210 MODEL COMPRESSOR
COMPRESSOR G as per Caterpillar part no 4401616; MAKE - CATERPILLAR.
COMPRESSOR G as per Caterpillar part no 4401616; MAKE - CATERPILLAR.
Procurement of impact rollers for conveyors of CHP at NTPC Simhadri and Procurement of SS Idler and Self Cleaning Roller for NTPC Kudgi
Supply of Idler frames for the conveyors of 1D,3C,BFC,4C,6C,RSFD and UC2 of MMSD-II/MMD/CHP/Dr.MVR RTPP.
PROCUREMENT OF GATE AND GLOBE VALVES FOR DRY FLY ASH HANDLING SYSTEM ,SCRAPER CONVEYORS AND ASH PUMP HOUSE OF UNIT 3 AND 4.
Procurement of "HAVELLS/ HALONIX/ C&S/ BAJAJ/ CROMPTON GREAVES/ SYSKA MAKE" LED FITTINGS OF DIFFERENT CAPCITIES FOR LIGHTING ALONG THE CONVEYORS OF CHP.
PROCUREMENT OF DIFFERENT TYPES OF PULLEYS (DRIVE & NON DRIVE) FOR CONVEYORS 13A/B, 14A/B, 20,21 & 25 IN MM-I/CHP-III/Dr.NTTPS
PROCUREMENT OF VARIOUS SIZES OF MS FLANGES FOR THE DRY FLY ASH SYSTEM, SCRAPER CONVEYORS AND ASH PUMPS OF UNIT-3 and 4.
Procurement of " HAVELLS/ HALONIX/ C&S/ BAJAJ/ CROMPTON GREAVES/ SYSKA Make LED Fittings of different capacities for lighting along the conveyors of CHP
PROCUREMENT OF VARIOUS SIZES OF MS FLANGES FOR THE DRY FLY ASH SYSTEM, SCRAPER CONVEYORS AND ASH PUMPS OF UNIT-3 and 4.
Supply of Idler frames for the conveyors of 1D,3C,BFC,4C,6C,RSFD and UC2 of MMSD-II/MMD/CHP/Dr.MVR RTPP.
Labour charges for Up keeping by clearing of Emergency jammed coal and slurry coal at various chutes and various jammed places of junction Towers, sump pump pits, conveyors-23, 16A/B, 17A/B, 18A/B, 19A/B, RFC-3,4 and conveyor-24 in M-IV Sub- division of MM/CHP/Stage-III/ Dr.NTTPS as and when required during the year 2019-20
Regular maintenance works of Boilers, Mills, APHs, ID Fans, PA Fans, Seal Air Fans, Scanner Air Fans, ESP's, Flue Gas Ducts, Primary, Secondary Air Ducts, Feeders and Feeder floor etc., of Unit-I&II boilers and their auxiliaries during the year 2017-18 from 01-04-2017 to 31-03-2018.