Loading…
Loading…
5,044 results • Best match
Excavating conveyor Belt as per PLASSER Part No:RE20.725 Make:Plasser, Dunlop, Nirlon,MRF,MR,Virshubh,Biswas& Jagriti
Waste conveyor in/out cylinder for BCM& FRM as per Plasser part no.- 62.05.3000.63PL, Make-Plasser.
Replacement of gravimetric feeder belts replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of RC feeder doors replacement and overhauling of main reducer gearbox and ... of boiler of ...
Replacement of gravimetric feeder belts replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of R.C.feeder doors replacement and overhauling of main reducer gearbox and ... of boiler of ...
Replacement of gravimetric feeder belts replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of R.C.feeder doors replacement and overhauling of main reducer gearbox and ... of boiler of ...
Replacement of gravimetric feeder belts replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of R.C.feeder doors replacement and overhauling of main reducer gearbox and ... of boiler of ...
Replacement of boiler tubes found eroded in D-meter survey and Replacement of tubes/bends/IPW & DMW joints (in HTR & HTS coils) including necessary HP welding in the areas like a) economizer b)LTR c)LTS d)HTS e)ITS f)HTR and g)Hanger platen coils & ... units-5&6 Boilers for ...
supply of split AC spares of compressors,fan motors and smart controllers(timers) of ISI standard make like DAIKIN/MITSUBISHI ELECTRIC at SRBPH
supply of split AC spares of compressors,fan motors and smart controllers(timers) of ISI standard make like DAIKIN/MITSUBISHI ELECTRIC at SRBPH
SUPPLY, INSTALLATION, LOADING, UNLOADING, ERECTION, TESTING AND COMMISSIONING OF REVOMOX NON IBR BOILER OF MODEL NXT 650KG/HOUR LPG STEAM BOILER OF STEAM RICE COOKING AT VAKULAMATA ANNAPRASADA BHAVANAM OF S.V.S.DEVASTHANAM, DWARAKA TIRUMALA(2ND CALL)
SCREW COMPRESSOR (ES6400B-RF6001026001), SHELL AND TUBE CONDENSER-SEA WATER COOLED (ES6400B- 5209575), CONTROL PANEL (ES6400B-5743226), MBC CONTROLLER (ES6400B-6100872), 144 TR MAGNETIC BEARING CHILLER, MODEL NO: M0-M70462 (ES6400B- 5209866)
Nylon Fabric conveyor belt conforming to IS 1891-1994 (part 1) skim coated plies, open ends, cut edg (Q3)
Nylon Fabric conveyor belt conforming to IS 1891-1994 (part 1) skim coated plies, open ends, cut edg (Q3)
ELECTRICAL HYGIENE FOR ELECTRICAL MACHINERY, MOTORS, STARTERS AND APPLIANCES -IN SHIP
PROVISION OF WORKSHOP MACHINERY FOR GT TEST FACILITY AT ND(V)
Supply Videowall solution, RFID based Race timing system and Target Machinery
Engaging Labour Machinery and Providing Metrails in view of MSF 2020.
Engaging Labour Machinery and Providing Material in view of MSF 2020
Purchase of Machinery -Equipment for Regional Agricultural Research Station, Tirupati- 517502
Supply Videowall solution, RFID based Race timing system and Target Machinery
Purchase of Machinery -Equipment for Regional Agricultural Research Station, Tirupati- 517502
Hire charges for Machinery and vehicles for Rangulosthavam & Pedda Tirunallu 2024
Supply and installation of plant & machinery for CIC at RARS, Anakapalle
Engaging Labour Machinery and Providing Material in view of MSF 2020
Goods Transport Service – Per Trip based Service - Machinery & Equipment; trailers; 32MT
Basic Underpinning and amenities for machinery and equipment of SAARATHI PROJECT
Overhauling of water wall soot blower, long and half retractable soot blowers of units 3&4 boilers during annual overhaul period for the year 2021-22.
Supply of spare for existing steam boilers in TTD AD Building Employees canteen Sri PAT Tiruchanoor Srinivasam and SV dairy farm for the year 2018 19
Arrangement of steam vessels and boilers to the kitchen section for Annual Brahmotsavams at Sri Kodanda Rama Swamy Temple, Vontimitta for the year 2025 Short tender
Replacement of IPW joints, DMW joints and attachment welds in HTRH, HTSH and ITSH coils of units-3 & 4 boilers during annual overhaul period 2022-23.
Fabrication of 3.15mm & 1.6mm thickness anti erosion SS shields and its clamps for Units-3&4 boilers as and when required during the year 2018-19.
PROCUREMENT OF HSLM SPARE FOR LOESCHE COAL MILL MODEL 35.3D AT NTPC KUDGI 800MW BOILER
Repairs of secondary air duct and Flue gas duct at the boiler of Unit 1
Supply OF TD and MD Boiler feed pump oil filter elements in Turbine maintenance division
Renovation of mechanical boiler shed in to SEIMEN's Labs at college of engineering A.U, VSP
Overhauling of Water wall Soot Blowers in Unit-I Boiler for the year 2019-20
Overhaul works of Boiler Feed Pumps in Unit-2 during annual overhaul period 2025- 26
Overhauling of water walls soot blowers of Unit 2 Boiler for the year 2018 19
AIR PREHEATER RADIAL,AXIAL, AND BYPASS SEALS OF SD-1/UNIT-6 BOILER(1X600 MW)
Procurement of scanner guide pipe assemblies for coal and oil firing equipment for 500MW boiler.
Overhaul works of Boiler Feed Pumps in Unit-1 during annual overhaul period 2024-25
Overhaul works of Boiler Feed Pumps in Unit-1 during annual overhaul period 2024-25
Supply OF TD and MD Boiler feed pump oil filter elements in Turbine maintenance division
Overhaul works of Boiler Feed Pumps in Unit-2 during annual overhaul period 2025- 26
SUPPLY OF GLAND PACKING PRESSURE SEAL RINGS AND GRAHIPTE PACKING ROPES FOR UNIT-III BOILER
Procurement of Oxygen gas for the condensate /Boiler feed water of Unit-I&II Maintenance
SUPPLY OF GLAND PACKING PRESSURE SEAL RINGS AND GRAHIPTE PACKING ROPES FOR UNIT-III BOILER
PROCUREMENT OF STRAIGHT TUBES FOR WATER WALL,RH AND ECONOMISER OF 500MW BOILER/STAGE-IV
Overhauling of Water Wall Soot blowers in Unit-I Boiler for the year 2021-22
Repairing/Servicing/Overhauling of Valves in Unit-1 Boiler for the period 01.04.2026 to 31.03.2027