Loading…
Loading…
5,045 results • Best match
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Open Body Taurus; 21 FT Truck
Manufacturing of scaled model of main circulating pump
Procurement of VCI oil for preservation of Process Gas Compressor packages installed at G1 Terminal, Odalarevu plant
Crown Nut Suction Side to GD Part No.50Q13 for GD Make Water Cooled Compressor Model WLNA9BB
Overhauling kit for TRC 1000 MN UG compressor, Part No. 072404009 Make ELGI as per attached document.
Supply of Air Heating Elements for Air Drying Units of Compressor House at Stage-I/Dr.MVR RTPP.
Overhauling kit for ELGI Compressor TRC 1000 MN consisting of 25 items as per as attached document.
PROCUREMENT OF REFRIGERANT GAS R-22 MAFRON GAS AND COMPRESSOR GAS R410A FOR THE YEAR 2023-24
PROCUREMENT OF REFRIGERANT GAS R-22 MAFRON GAS AND COMPRESSOR GAS R410A FOR THE YEAR 2024-25
PROCUREMENT OF WHITE NON INDICATING CRYSTAL TYPE SILICA GEL FOR AIR DRYING UNITS AT THE COMPRESSOR HOUSE
Hire charges for supply of Hitachi-140, Tractors, JCB and Compressor for one year period 2023-2024
PROCUREMENT OF HEATING ELEMENTS FOR ESP HOPPERS AND HEATER ELEMENTS FOR AIR DRYING UNITS IN COMPRESSOR HOUSE
procurement of spares for GA-110 Atlas copco compressor of dry fly ash system of stg-I
Set of end shields suitable for MCP of RR20100 M/s. Elgi compressor consisting of 02 items.
25HP Lubricated Screw Compressor with PMV, VFD 95CFM and 1000 Litre reservoir as per attached technical specification.
OVERHAULING OF MAIN ENGINE REDUCTION GEAR BOX UNDER OEM (M/S REINTJES) SUPERVISION
Repair and Overhauling Service - RESIDUAL LIFE ASSESSMENT RLA OF STEAM DRUMSWATER DRUMS AND SUPER HEATER HEADERS OF D TYPE FOSTER WHEELER MAIN BOILERS ONBOARD SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
Removal of ash and dust from pent house, Pent house Deck, F.G.Ducts,Hot PA ducts,APH and various locations during Annual Overhaul of Units-I&II Boilers for the year 2024-2025.
Removal of ash and dust from pent house, Pent house Deck, F.G.Ducts,Hot PA ducts,APH and various locations during Annual Overhaul of Units-I&II Boilers for the year 2024-2025.
Break down works of Units-I & II Boilers Pressure parts for a period of 6 months from the date of commencement of work as and when required during the year 2026-27.
Fabrication of 5.00mm, 3.15mm & 1.6mm thickness anti erosion SS shields and its clamps for Units-3&4 boilers from the date of commencement of work to 30.09.2026 during the year 2026-27.
Custom Bid for Services - PR NO 200130141 BIENNIAL SERVICE CONTRACT FOR INTERNAL OXIDE SCALE THICKNESS CREEP HARDNESS AND HEADER INSPECTION MEASUREMENTS IN BOILERS 500 MW OVERHAULS AT NTPC SIMHADRI 2024 TO 26
2041826, 2041830, 2041156, 2151893, 2004006, 2041773, 2041795, 2041789, 2041377
Labour charges towards the identifications of major section faults , replacing of defective parts in luminaries at Railway marshalling yard lighting towers, conveyor galleries, various locations connected to the conveyor gallery area and the staker reclaimers area in EMCHP Dr.NTTPS during the year 2022-23(as and when required)
Labour charges towards the identifications of major section faults , replacing of defective parts in luminaries at Railway marshalling yard lighting towers, conveyor galleries, various locations connected to the conveyor gallery area and the staker reclaimers area in EMCHP Dr.NTTPS during the year 2022-23(as and when required)
Shifting of screw conveyors inside the mill, checking and adjustment of back lash of girth gear with pinion of units-3&4 mills during the Annual overhaul period for the year 2020-21
Shifting of screw conveyors inside the mill, checking and adjustment of back lash of girth gear with pinion of unit-3&4 mills during the Annual overhaul period for the year 2019-20.
Replacement of defective gear boxes, geared couplings, input shaft, bearings, oil seals and alignment of gear boxes for the conveyors and Wagon Tipplers available in MMD/CHP/RTPP for the year 2023-24
Procurement of spares for IAC and PAC model 2HA2QT and 2HA4TER for NTPCUnchahar and Spares of Instrument Air Compressor for NTPC Korba and NTPCSipat and spares of Kirloskar Pneumatics Make for NTPC Sipat and Lara
Repair and Overhauling Service - REPAIR RESTORATION OF MAIN BOILER WATER DRUM IN SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
Supply of 85Nos., 415V LT Motors required for Main Plant, WTP, Boiler, Raw Water and CW Systems of 2x800MW-SDSTPS
Overhauling and repairs to Various sizes of H.P.Valves of Boiler II during the Annual Overhaul for the year 2020-21
Maintenance (Break down & repair works) and overhaul works of Air preheater in Unit- I Boiler during the year 2019-20
Application of Epoxy paint for Structure of Boiler and Critical piping structure of Unit-2 during the year 2025-26
Annual maintenance and repairs works to Insulation, Cladding sheets and Refractory in Unit-II Boiler for the year 2019-20
Application of epoxy paint for Structure of Boiler and Critical piping structure of Unit-1 during the year 2024-25
Supply of Hot end & Hot intermediate end baskets for APHs type 27 VITM (1800) 72 Deg of unit-4 boiler
Application of Epoxy paint for Structure of Boiler and Critical piping structure of Unit-2 during the year 2025-26
Overhauling of Burners in Unit I Boiler including T and P and Consumables during overhaul for the year 2018 19
Overhauling and repairs to various sizes of H.P.Valves of boiler-II during the annual overhaul for the year 2019-20
Certain Maintenance and Repair works to Insulation cladding sheet and Refractory in Unit I Boiler for the year 2020 21
Repairs of SA duct flue gas duct at the Boiler of Unit 1 SDSTPS including T and P and consumables
Supply of 85Nos., 415V LT Motors required for Main Plant, WTP, Boiler, Raw Water and CW Systems of 2x800MW-SDSTPS
Annual maintenance and Repairs works to Insulation, Cladding sheet and Refractory in Unit-II Boiler for the year 2021-22
Replacement of defective HTS & HTR coil tubes of Unit 2 boiler during annual overhaul period for the year 2025-26
Overhauling of coal and oil firing equipment of boiler of Unit 2 during annual overhaul for the year 2025-26.
Cost, Supply, Transportation, Delivery, Installation execution and Certification of 1 Tonne Capacity IBR Capacity IBR Boiler and Steam Pipe line
Overhauling of coal and oil firing equipment of boiler of Unit 2 during annual overhaul for the year 2025-26.
Construction of Boiler Room and Stores and required approach pathway for additional kitchen in Sri Padmavathi Rest House in Tirumala..
Application of Epoxy paint for Structure of Boiler and Critical piping structure of Unit-II during the year 2023-24