Loading…
Loading…
5,045 results • Best match
Supply of machinery such as Hydraulic excavator, tractor on hire basis to HLC No.2 Section, Kudithini.
Providing Machinery such as Hydraulic Excavator and Tractor on hire basis in Power Canal Section, TB Dam.
Supply of machinery such as Hydraulic excavator, Tractor on hire basis to HLC No.3 Section, Ballari
Supply and Installation of Fluid Mechanics and Hydraulic Machinery (FMHM) Laboratory Equipment at RGUKT AP Srikakulam Campus
Hiring of machinery such as Hydraulic Excavator and tractor for miscellaneous works in Moka Section of RBLLC
Hiring of machinery such as Hydraulic Excavator and tractor for miscellaneous works in Moka Section of RBLLC
Hiring of machinery such as Hydraulic Excavator and tractor for miscellaneous works in Gududuru Section of RBLLC
Operation and Maintenance of newly procured Machinery / Vehicles by engaging drivers for a period of 4 Months.
Clearing of garbage dumps and Formation of windrows by engaging machinery at compost yard in Madanapalle Municipality
Providing Machinery to carry out miscellaneous works in Ingaladal Section of RBLLC for the year 2021-22
Supply and Installation of Fluid Mechanics and Hydraulic Machinery (FMHM) Laboratory Equipment at RGUKT AP Srikakulam Campus
Annual maintenance and supply of materials to machinery inside Sri T.T Tirumala for the year 2022-23
Providing Machinery to carry out miscellaneous works in Hanwal Section of RBLLC for the year 2021-22
Supply & delivery & Installation of 1000LPH RO Water plant machinery along with necessary fitting for Dr.B.R.Ambedkar Gurukulam Paramasamudram
Supply and Installation of Fluid Mechanics and Hydraulic Machinery(FMHM) Laboratory Equipment at RGUKT AP Srikakulam Campus
Construction of machinery shed for Coffee pulping unit at G.Madugula Village and Mandal of Alluri Seetharamaraju District
Construction and Installation of Hydraulic Water Wash Machinery in GTS beside TUDA Nursery in Tirupati Municipal Corporation.
Construction of Vehicle cum farm machinery parking shed (28m x 6m) at HRS, Ambajipeta, East Godavari District
Supply of machinery such as Hydraulic excavator, tractor on hire basis to HLC No.2 Section, Kudithini.
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Triple Excel
Servicing of SPTs, FLOOD ALARM SYSTEM, ACOS and Instrumentation Works on CPP Gear Box Controls
Filling and Leveling of Low laying areas with Crusher Dust from Kothapalem in ward No.25 to Somalingapalem in ward No.02 of Yelamanchili Municipality under General Fund 2025-26
Filling and Leveling of Low laying areas with Crusher Dust from Kothapalem in ward No.25 to Somalingapalem in ward No.02 of Yelamanchili Municipality under General Fund 2025-26
Filling and Leveling of Low laying areas with Crusher Dust from Kothapalem in ward No.25 to Somalingapalem in ward No.02 of Yelamanchili Municipality under General Fund 2025-26
Labour charges of Different types of mechanical maintenance works in crusher house at MM-III sub division of CHP-III/Dr.NTTPS as and when required for the year 2023-24.
Fabrication of Modified new adjustable coal nozzle tips 26" size with Divider plate Y and Z arrangement for all corners 2&4 and 1&3 of units-5 & 6 Boilers for the year 2025-26.
Regular maintenance of ammonia injection system installed in ESP's of units-3&4 boilers as and when required during the year 2019-20 i.e for the period from 01-04-2019 to 31-03-2020
Fabrication of Modified new adjustable coal nozzle tips 26" size with Divider plate Y and Z arrangement for all corners 2&4 and 1&3 of units-5 & 6 Boilers for the year 2025-26.
Overhauling of water wall soot blowers, half and long retractable soot blowers & Overhauling and assisting in floating safety valves of Boilers of Units-5&6 during the Annual overhaul period for the year 2024-25
Overhauling of water wall soot blowers, half and long retractable soot blowers & Overhauling and assisting in floating safety valves of Boilers of Units-5&6 during the Annual overhaul period for the year 2023-24
Single Nozzle 3D Printer, Vinyl Printing and Cutting Machine, 3D Scanner, CNC Router, PCB Prototyping Machine, 5 Axis CNC Machine
Repair and Overhauling Service - WORK ON BOILER WATER DRUM IN MMR1 AND MMR2 IN SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
Repair and Overhauling Service - REPAIR OF BOILER WATER DRUM AND ECONOMISER WELDMENTS OF IN SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
Certain maintenance of work Break down repair works and overhaul work Air preheater in Unit I Boiler during the year 2020 21
Attending Boiler Break down works of 500MW/Unit-7/Stage-IV/Dr. NTTPS as and when required during the year 2019-20.
SUPPLY OF SPARES FOR GRAVEMETRIC FEEDERS AND PYRITE SCRAPER ASSEMBLY AND ITS SPARES FOR HP-1203 BOWL MILLS OF UNIT-II BOILER
Procurement of Erosion Protection shields for RH front coil,RH rear coil,BP front wall and Economiser for 500MW stage-IV Boiler
Repairs to ESP Roof and EERM manual door of the ESP Passes of Unit- 1 Boiler during the running period 2021-22
Attending Boiler Break down works of 500MW/Unit-7/Stage-IV/Dr. NTTPS as and when required during the year 2022-23.
RTPP-Stage I-O&M-Civil- Removal and disposal of ash, debris in Stage-I Boiler areas for the year 2022-23
SUPPLY OF SPARES FOR GRAVEMETRIC FEEDERS AND PYRITE SCRAPER ASSEMBLY AND ITS SPARES FOR HP-1203 BOWL MILLS OF UNIT-II BOILER
SUPPLY OF WELDING RECTIFIER AND PORTABLE WELDING MACHINE (COPPER WINDING)FOR UNIT-I AND II OF MRS AND FOPH OF BOILER DIVISION
Attending Boiler Break down works of 500MW Unit-7 Stage-IV Dr. NTTPS as and when required during the year 2026 27
Break down works, repair works and overhaul works of Air preheater in Unit-3/Stage-II Boiler during the year 2026-27.
SUPPLY OF WELDING RECTIFIER AND PORTABLE WELDING MACHINE (COPPER WINDING)FOR UNIT-I AND II OF MRS AND FOPH OF BOILER DIVISION
Break down works, repair works and overhaul works of Air preheater in Unit-3/Stage-II Boiler during the year 2026-27.
Dr.MVR RTPP - O&M # Civil - Removal and disposal of ash, debris in Stage-II & III Boiler areas for the year 2024-25
Cost, Supply, Transportation and Fixing of New LPG Gas Pipe line to Boiler and Kitchen in Annadanam building belongs to Srisaila Devasthanam
Certain maintenance of work(Break down repair works) and overhaul work Air preheater in Unit- I Boiler during the year 2021-22
Attending Boiler Break down works of 500MW/Unit-7/Stage-IV/Dr. NTTPS as and when required during the year 2025-26