Loading…
Loading…
6,517 results • Best match
Repair of Pumping Machinery of existing 24 Nos Tubewells including submersible cable and stater and all other works contingent thereto ( For one Year ) (Under Public Health Engg. Sub Division Sadhoura) From 01-04-2024. ( 610 BHP )
Various Rural Annual Mtc of Water Supply Schemes Yamuna Nagar for the year 2025 26 Falling under PHESD III Yamuna Nagar Zone I Repair of Pumping Machinery of existing tubewells and all other works contingent thereto
CONSTRUCTION OF 2 NO. TOILETS, 2 NO. GENERATOR SHEDS and REPAIR OF MACHINERY AREA SHED AT CENTRAL OF EXCELLENCE FOR VEGETABLE and FRUIT IN GGN AT GHARAUNDA UNDER INDO ISREAL PROJECT (DEPOSIT WORK OF HORTICULTURE DEPARTMENT)
Operation and Mt. of W/S Scheme Mundsa gp. of 2 Nos. villages i.e. Mundsa and Amadalshahpur, Tehsil and District Jhajjar including Water Works at Mundsa Tubewells, Installation pumping machinery, electric installation, street light, chlorination syst
Various Rural Annual Maintenance Water Supply Schemes for the Year 2024 25 Falling Under PHESD No.III Yamuna Nagar. Zone II. Repair of Pumping Machinery of existing tubewell and all other works contingent thereto. For 9 Months
Chahlka Aas Mohammad ki Dhani Providing and Installation of 1 No TW By DTH Rig along with pumping machinery and laying of 100mm dia DI connecting pipeline and FHTC in Village Chahlka Aas Mohammad ki Dhani
Repair of Pumping Machinery of existing tubewells, Boosting Stations, water works i.e. CB WW Nasibpur Old, Dhani Nuniwal, Nasibpur, Sekhpura, Shahpur Mandi, Neerpur, Kojinda in Narnaul Town for 12 months and all other works contingent thereto
Drilling of Tubewell on 400 mtr depth and Pumping Machinery Construction of Pump Chamber Size 10 BY 12 Construction of Boundary wall 100 mtr Laying of 150 mm id D.I Rising main Construction of CC Path.
Repair of Pumping Machinery of existing 25 Nos Tubewells including submersible cable and stater and all other works contingent thereto ( For one Year ) (Under Public Health Engg. Sub Division Sadhoura) From 01-04-2024. ( 625 BHP )
Repair of Pumping Machinery of existing 26 Nos Tubewells including submersible cable and stater and all other works contingent thereto ( For one Year ) (Under Public Health Engg. Sub Division Sadhoura) From 01-04-2024. (650 BHP)
Operation and Maintenance of Rajiv Gandhi Drinking Water Supply Augmentation Project for Mewat (Haryana) Ranney Well Segment Leg-II. Repair of pumping machinery of existing Tubewell and Subsidiary Boosting station in various villages of IBS Chhapera
Recall Chandpur Providing of FHTC Construction of 1 No Boosting Station Installation of pumping machinery and laying of balance 4 and 6 inch Distribution pipe line Under the JJM programme in village ChandpurThesil and District Jhajjar
AMtc. of Various Rural W/S Scheme falling under IBS Sudaka Repairing of all Pumping Machinery of various SBS and Tubewell in various villages under IBS Sudaka and all other works contingent thereto For 18 Months
DNIT for Repair of structures, Laying of pipe of pipe line and Providing of Functional Household Tap Connection and Commisioning of Pumping Machinery including all required electrical and mechanical equipment and all other work contingent thereto.
Const. of MPS, Repair of structures, Laying of pipe of pipe line and Providing of FHTC and Commisioning of Pumping Machinery For MPS including all required electrical and mechanical equipment and all other work contingent thereto
Constn of 1 No RCC under ground CWT Pump Chamber Boundary wall Approach Road and path Laying of rising main distt system supplying installing and commissioning of pumping machinery for clear water including all required material
Laying of pipe line, FHTC, Construction of B/wall, Pumping Machinery, Repair of UGT, Providing and fixing of Iron Gate and pavement of I.P.B passage site at village Kheri Kankar and all other works contingent thereto.
Estimate for improvement water supply scheme Bhiwani Town Distt Bhiwani Laying of distribution System Providing New FHTC Laying down of Existing pipe line Supply and erection of New Pumping Machinery and Jungle clearance of Water works
Laying, Jointing, testing and commissioning of Rising main and distribution pipe line, and providing and fixing pumping machinery for connecting SBS to IBS F.P. Rajput in village Bhanguri Distt. Palwal and all other works contingent thereto
construction of sump well at water works Laloda pump chamber ,providing and laying of rising main, Pumping machinery for water supply scheme ( group of 2 no. villages NANGLA and NANGLI ) Tehsil Tohana Distt. Fatehabad ( under JJM)
Construction of 2 No Intermediate Boosting Station each in village Umra and Jalalpur laying of rising main from each intermediate boosting station to village SBS Providing and fixing pumping machinery Construction of approach path Staff Quarter
Annual maintenance of Sewerage scheme in Sector-13 Bhiwani. Disconnecting the unauthorized defaulter sewerage connection from mainline including material, machinery and labour required for the same in Sector-13, Bhiwani complete in all respect and a
Repair of Pumping Machinery of existing tubewells, Boosting Stations situated in various villages i.e. Dharsoon, CB WW Mandlana, Mehrampur, Kutbapur, CB WW Kutbapur, Saharpur, Bass Kirarod Afgan, Niwaj Nagar, Hazipur, Silarpur Mehta, Lehroda, CB WW F
Mtc of Pumping Machinery of water works and Twell at various location including motor pump submersible cable starters panal boards etc for maintenance 9 No. villages for 8 months from the date of commencement of work
Chahlka Aas Mohammad ki Dhani Providing and Installation of 1 No. TW By DTH Rig along with pumping machinery and laying of 100mm dia D.I. connecting pipeline and FHTC in Village Chahlka Aas Mohammad ki Dhani.
Annual maintenance of Water supply scheme in Sector-13 Bhiwani. Disconnecting the unauthorized defaulter water supply connection from mainline including material, machinery and labour required for the same in Sector-13 Bhiwani complete in all respec
Watch and ward day and night of HSVP structure and machinery etc. at Main Water Works Campus Sector-3 Hisar and all other works contingent thereto. For a period of 12 months i.e. 1.4.2021 to 31.03.2022
Repair of Structures, Const. of MPS and Providing of Functional Household Tap Connection, laying of pipe line and Commisioning of Pumping Machinery for M.P.S including all required electrical and mechanical equipment and all other works contingent
Repair maintenance of pumping machinery Pump Motor complete set , electric control panel board , starter and all other accessories at 2nd water works Rohtak Town for 6 Months from date of commencement for the year 2023-24
Drilling and installing of 1 No. T/Well upto depth of 450 mtrs. BGL with reverse rotary rig along with Prov. and fixing 1 no. pumping machinery and connecting pipeline complete pipeline complete in all respect.
Annual Maintenance of Various Water Supply Schemes i.e. Maina, Shimli, Karontha, Baland, Kabulpur and Ritauli, District Rohtak for the period of 12 Months from the Date of Commencement and all other works contingent thereto (Pumping Machinery).
A/Mtc. Estimate for Water Supply Scheme Samalkha Town for the Year 2025-26.Operation and Maintenance of all structures/components Pump Chamber, Boundary Wall, Distribution System, tubewells Pumping Machinery, OHSR,CWT, Civil Structures and Supply
Construction of clear water tank, pipe line at Head works, road and path, Distribution pipe line, FHT connection and Prov. Installation of pumping machinery and all other works contingent thereto at Boosting Station at Vill. Dabwali
Construction of RCC CWT of 6.10 Mtrs. dia, Pipeline at Head Works, Prov. and Installation of Pumping Machinery, laying of Distribution System, Prov. FHT Connection and Repair Renovation of FB and all other work contingents thereto.
Construction of One No. underground reservoir of size 24x17x8, Two No. Pump Chamber of size 12x10, Construction of Boundary Wall, Pumping Machinery, Head Works Pipe Line, Distribution Pipeline, FHT Connection and all other works contingent thereto
Annual Maintenance Estimate of Hort. works in sector-14P-II, Hisar for the year 2025-2026.
Various Villages - Repair of P.M. under PHESD No.2, Jagadhri (Zone-II)
Various Village- Repair of P.M. under PHESD No.2, Jagadhri (Zone-III)
Various Rural - PHESD No.2, Jagadhri (Zone-I)
Hiring of crane of 20 ton capacity for lifting and lowering of machinery installed at sewerage disposal of Sector 2 6 7HBC and WTP sector 7 Bahadurgarh complete in all respect and all other works contingent thereto
Operation and maintenance of Boosting station of Sector 9 and 13 including maintaining proper water supply network of Sector 9 9A 10 11 and 13 Bahadurgarh including maintenance of machinery, maintaining logbook etc in Urban Estate Bahadurgarh
Const. of Boosting Station, Repair of structures, Laying of pipe line and Providing of Functional Household Tap Connection and Commisioning of Pumping Machinery For B/S including all required electrical and mechanical equipment and all other work
A/Mtc. of variuos Rural W/S Scheme falling under IBS Mandkola. Repairing of all Pumping Machinery of various SBS and Tubewell in various villages under IBS Mandkola and all other works contingent thereto (For 8 Months)
Construction of twenty one No UGT having capacity two lacs Ltr one lakh fifty thousand Ltr and one lacs Ltr Construction of boundary wall Construction of Pump Chamber Installation of Pumping Machinery Laying of Distribution Pipe Line
Repair maintenance of pumping machinery Pump Motor complete set , electric control panel board , starter and all other accessories at 2nd water works , Pump house at JLN , B/Station ITI , Senior Secondary school , Old Bus Stand Indira Colony,
OandM of w.s sch. LUHARI, Tehsil and District Jhajjar, 6 Nos. Tube well 2 Nos. at Water Works Luhari, 2 Nos. Near mandir and 2 Nos. Faridpur Road, including all installation pumping machinery, electric installation, street light.
AMtc of various Rural w/s Scheme falling under IBS Ferojpur. Repairing of all pumping Machinery of Various SBS and Tubewell in various village under IBS Ferojpur Rajput and all other works contingent thereto for 24 months
Construction of Raw Water Pumping Station, canal based water works part-1st and 2nd, WTP, Boosting Stations, Pump chambers, Laying of Rising main, Distribution System, Providing and fixing of pumping Machinery, Rectification of old and damaged F
Repair of Pumping Machinery of existing tubewells, Boosting Stations situated in various villages i.e. Rampura, CB WW Rampura, Hudina, Seehma, CB WW Seehma, Barkoda, Shahpur Doyam, Dublana, Khatripur for 12 months and all other works contingent there
Various Rural Annual Mtc of Water Supply Schemes Falling under PHESD III Yamuna Nagar Zone I for the year 2023 2024. Repair of Pumping Machinery of existing tubewells and all other works contingent thereto For Nine Months.