Loading…
Loading…
7,171 results • Best match
Complete repairing of popular shaft of 933 screen and repairing, dismantling and fitting of coupling of 934 belt conveyor in RLB Section of Kathara Washery
Upkeepemnt of jammed hopper no. 02 and 06 of 701 belt conveyor at PS-5 section at Madhuban Coal Washery under Block-II Area, BCCL .
Repairing/ new change of shell with bearing of dowty Mecko tail pulley of 1200mm Vishwa conveyor of CCS of Moonidih Underground mine. Sl.No.23222/01
Repairing/ Modification and Replacement of Carrying Idler frame along with replacement of idler sets for unit 701 and 702 belt conveyor at Moonidih Coal Washery.
Complete Repairing and overhauling of Yaskawa make star delta starter of conveyor belt of feeder breaker No-03 Nadkhurkee at ABOCP under Block-II Area
Repairing/ Changing of stringer channel, its support, deck and walkway of conveyor belt of unit 601 for 50 Mtr. Of length of Moonidih Coal Washery.
Cold Vulcanizing Joints of unit no. 210, 401, 501, and 701 belts conveyor of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Upkeepment of belt conveyor unit 1402 unit and its hopper tail end side at Loading section at Madhuban Coal Washery under Block- II Area BCCL
Repairing rectification and straightening works of damaged bent conveyor chain flight bar assemblies of Black Diamond make Feeder Breaker installed at Tarmi siding of SDOCM
Fabrication and erection of old bottom roller dismantling and new bottom roller fitting of unit no. 978 belt conveyor in RLB Section at Kathara Washery
Repairing the damaged portion of slurry water drain from and belt conveyor no. 1128 Head to tail end in CHP CPP premises under CHP CPP.
Repairing/ Replacement of Carrying idler frame along with replacement of idler sets for unit C-1 and C-2 belt conveyor at Moonidih Coal Washery.
Repairing/ Strengthening of supporting structure including tie-beams and Crisscross bracing for Conveyor Gantry and Walkway platform of unit 301-B at Moonidih Coal Washery.
Repairing of head drum pulley of 133A and 02 nos. bend snub drum of 116 A and B conveyor of Pre Washery at Kedla Washery.
Repairing rectification and straightening works of damaged bend conveyor chain flight bar assembling of Black Diamond make feeder Breaker installed at Tarmi siding of SDOCM
Assistance in operation of new wagon tippler, their auxiliaries and conveyor belt system and other miscellaneous operation work of CTPS as and when required basis.
Assistance in operation of new wagon tippler, their auxiliaries and conveyor belt system and other miscellaneous operation work of CTPS as and when required basis
Replacement of damaged deck plate,channel, angles and supporting parts etc. of unit no. 116A and 116B belt conveyor of PreWashery section of Kedla Washery
Repairing/ Strengthening of base, Guide frame, ladder and its supporting structure of Take-up frame for unit 501-B belt conveyor of Moonidih Coal Washery.
Providing and fixing CGI Sheet in place of missed/damaged CGI Sheet from intrim BTL Crucher to Conveyor C I and C II under RCHP.
Upkeepement of spillage materials from back side of unit 931 belt conveyor at PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL .
Transportaion and installation of VISHWA 1000 mm belt conveyor at E-9 B/G of XVI(B) seam at 500MH in Moonidih Colliery, W.J. Area
Dismantling, repairing and replacement of damaged/ worn-out discharge chute, including its pajama chute and changeover gate of unit 201 conveyor at Moonidih Coal Washery.
Day-to-day removal/rehandling of spillage coal of different Plant section near and around belt Conveyor no. 52,66,74,79,136,138,143, 144,180,181,201 and 202 at Kathara washery
Balance work of Deployment of HSCL PRW for removal cleaning of coal slurry from conveyor belts area of unloading section of CHP, CO and BPP
For repairing/straightening of mast platform and fitting of new conveyor muffles 04 Nos. of Drill Sl. No. DR-236 at AKWMOCP , KATRAS AREA, BCCL
Repairing/Replacement of A and B shuttle conveyor track rail, box clamp and repairing of different sizes of sprockets in PCH Section at Sawang Washery.
Repairing of 02nos. conveyor loop take up drum of feeder Breaker No-1 and 3 through dismantling, cutting, transporting, fabrication and fitting at AMP Colliery.
Repairing/strengthening of tail pully grame of unit No. 902 belt conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing / Replacement strengthening of take-up sliding frame, side stairs and column of unit 701, 201, 801A, 502, 901 belt conveyor of Moonidih Coal Washery
Repairing/strengthening of stringer channel along with replacement of carrying idler frame, carrying roller, return roller etc. of Unit-701 belt conveyor at Moonidih Washery
Repairing/replacement of damaged deck plates, stringer support, channels of unit 1406 belt conveyor of loading section at Madhuban coal Washery under Block II Area.
Welding of centre carrying rollers and return roller of 301 belt conveyor of PS-5 section at Madhuban Coal Washery under block-II Area, BCCL.
Repairing and overhauling of tension drum no.2 size 1600 x 400x 10mm of new bunker conveyor power coal in RLB section of Kathara Washery
Dismantling and Transportation of TB-04 1000mm, 600TPH Conveyor Belt with drive capacity 1 x 90kw, 550 Volts currently installed at Churi Colliery, NK Area
Upkeepment of Jammed hopper no. 1 and 5 of 701 belt conveyor at PS-5 section at Madhuban Coal Washery under Block-II Area, BCCL .
Repairing, Fabrication/Erection of steel structural work of BC-8 conveyor structure and feed chute, discharge chute in O/S restriction plant at Sawang Washery.
Repairing, changing and overhauling of head drum sprocket and drum side sprocket of Unit No. 143 belt conveyor at Raw Coal Section of Kathara Washery
Repairing and overhauling of head sub drum size 1600 x 800 x 10 mm of 79 belt conveyor in Raw Coal Section of Kathara Washery
Dismantling , fabrication, erection and alignment of roof structure over 1204 conveyor belt discharge chute in PS-4 under Raw Coal Section of Rajrappa Washery Project
Rubber Lagging of different conveyor drums with 12 mm thick rubber sheet of main washing Plant at Madhuban Coal Washery under Block II Area BCCL
Overhauling of C.I. wheel shaft of A side and B side shuttle conveyor and (B) Overhauling of vertical pump in PCH Section at Sawang Washery.
Dismantling, Fabrication and repairing of 06 pair of C.I. wheel and shaft of shuttle belt conveyor in washed coal in Main Plant of Sawang Washery.
Repairing of head drum size 1150 x 600 x 10 mm of 268 belt conveyor at 00 level in Hydro Cyclone section at Kathara Washery
Repairing rectification works of conveyor chain 04 nos Idler assembly of SDL machine in respect of 7,8 Incline of Dhori (K) Colliery. SDL M/Cs-
Repairing and strengthening of drive pulley frame of conveyor no. 704-2 of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing/ Strengthening of base, Slider frame and its supporting structure of bend pulley and take up of unit 702 belt conveyor at Moonidih Coal Washery.
Refabrication of cable tray and dressing of the power and control cable of U-38 conveyor gallery ,MCC 1 cable tray of Mohuda Coal Washery.
Replacement of 5 nos. of drum(snub/drive) of 118 plant feed belt RC-2, 131 and CC-3 conveyor belt of Dugda Coal Washery
Replacement of bracing angles, Channel, platforms, structure column lining railing of take-up tower of unit no. 304 belt conveyor main plant of Kedla Washery