Repairing and making of (04 nos.) spray pipe line of unit no. 143, 144, 145 and 146 belt conveyor in Raw Coal Section of Kathara Washery
Upkeepment of spilled materials from unit 701 belt conveyor deck plates, gallery, return rollers etc. At MCW at Madhuban Coal Washery under Block-II Area, BCCL
Repairing of 400Amps. 440V, ABC Make ACB Sl. No. NFLP/ACB /109 for controlling of belt conveyor of F/Breaker no-3 of Muraidih, AMP Colliery.
Fabrication of 1200 mm carrying roller frame for Unit No. 1602 belt conveyor of PS-9 side at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing of 02nos. conveyor loop take up drum of feeder Breaker No-1 and 3 through dismantling, cutting, transporting, fabrication and fitting at Muraidih, AMP Colliery.
Repairing and changing of tail drums vertical structure and square structure of unit no. 978 and 954 bypass belt conveyor in RLB Section of Kathara Washery
Replacement of liner plates of Payjama chute of unit no. 701-1 belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing/change of M.S Cell and shaft of loop take up drum of 2x150 KW Vishwa Conveyor of CCS of Moonidih Underground Mine. Sl.No.532/03
Fabrication of outer link with extended pin for flight assembly of IR and Atlas Copco make Feeder Breakers conveyor chain installed at Tarmi siding under SDOCM
Replacement of liner plates of Pyjama chute of unit no. 701-1 belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Jointing n re- commissioning of roller chain conveyor assembly at feeder breaker No. 1 ,2 and 3 at jarangdih railway siding under AKK OCP, BnK Area.
Dismantling, Repairing and Overhauling of 06 pair of C.I. wheel and shaft of shuttle belt conveyor in Washed coal power in C.C.B Top of Sawang Washery.
Replacement of Worn-out or damaged supporting structure , stringer and repairing/overhauling of manual gates of conveyor U-125 of loading section at Mohuda Coal Washery
New fabrication and making of 50 Nos. conveyor belt top roller (size 100mm dia x 1400mm) for Feeder Breaker of Phularitand Feeder Breaker of AMP Colliery..
Fabrication and erection of old bottom roller dismantling and fitting of unit no. 202 belt conveyor in 0-0 level of RCB section at Kathara Washery
Repairing/ Strengthening and Changing damaged structural members including posts, Strenger channel, bracket etc. of unit 301-A belt conveyor at ROM Section of Moonidih Coal Washery.
Repairing, dismantling and changing of damaged walkway/non-walkway structure take-up guide post and stringer channel of unit 601 conveyor gallery of Moonidih coal Washery
Fabrication of EN 24 carbon steel new flight assembly pins for conveyor chain of IR and AC make Feeder Breaker installed at Tarmi siding of SDOCM
Complete replacement of worn-out and damaged liner plate in discharge chute of unit no. 303,304 and 307 belt conveyor of main plant at Kedla Washery
Manpower assistance water spray in crushed coal yard of CHP of BTPS. Manpower assistance in operation of Sump Pump of Conveyor 5A-5B of CHP, BTPS.
Assistance in operation work of old wagon tippler, their auxiliaries and conveyor belt system and other miscellaneous operation work of CTPS as and when required basis.
Assistance in operation work of old wagon tippler, their auxiliaries and conveyor belt system and other miscellaneous operation work of CTPS as and when required basis.
Upkeepment of 704-1 belt conveyor, deck plates, return rollers and Ground area of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL .
Repairing of Loop take up drum of conveyor belt for D 18 development panel of Moonidih Project. Sl.No. LT-5,LT-6,LT-7, LT-8
Upkeepment of materials from 1406 unit belt conveyor and its hopper tail end side at Loading section of Madhuban Coal Washery under Block-II Area, BCCL.
Cleaning of spillage muck debris of TC-6 Belt conveyor from Gwarek dip to Jharkhand Bunker XVI Top Seam 500MH at Moonidih Colliery W. J. Area.
Structural Repairing/ Re-strengthening and functional restoration of Discharge chute and supporting frame work of unit 502 and unit 504 belt conveyor at Moonidih Coal Washery.
Re-handling of spilled raw coal surrounding column No.1 and column No. 2 near RGB of 133A belt conveyor of Pre-Washery at Kedla Washery
Complete repairing of 02 pairs spure and pinion gear and 05 nos. wheel shaft of unit no. 118A belt conveyor of Pre-Washery at Kedla Washery.
Dismantling, repairing, assembly and installation of 1 No. galiger sump pump and 1 No. Sala pump inside the tunnel of 501A conveyor at Moonidih Coal Washery
Repairing and changing of take-up drums vertical structure of new bunker washed coal and washed coal power belt conveyor in RLB Section of Kathara Washery
Dismantling, repairing machining and fitting of trolley wheel tray, rail wheel and base structure of unit no. 931 belt conveyor in RLB Section of Kathara Washery
Installation of new drive-drum and gear coupling after dismantling of existing damaged drum and its coupling at C-2 belt conveyor at Moonidih Coal Washery.
Cutting, dismantling, fitting and welding of new mother and liner plates to discharge chute of intermediate conveyor of stacker-I (1701) under CHP/CPP, Piparwar Area.
Cleaning and removing of coal dust muck accumulating on regular basis near till end of different conveyor belt at RCHP under Rajmahal Area. (for 12 months)
Repairing of worn-out and damaged chain link sprocket 02 nos. tail and head of chain conveyor unit no. 213 of main plant of Kedla Washery
Repairing of damaged flight fabrication of new flight for conveyor chain assembly of BWF make Feeder Breaker installed at Tarmi siding of SDOCM (Machine No-05)
Repairing of worn-out and damaged chain link sprocket 02 nos. tail and head of chain conveyor unit no. 213 of main plant of Kedla Washery
Over Hauling of double drive gear boxes to stop oil leakage and abnormal sound 801 belt conveyor at Madhuban Coal Washery under Block II Area BCCL
Repairing of supporting structure and its bracket and new carrier roller/frame fitting of 268 belt conveyor at 00 level in Hydro Cyclone of Kathara Washery
Repairing and rectification work with spares for hydraulic line of conveyor chain tensioning and lifting cylinder arrangement for BWF make feeder breaker installed at Tarmi siding
Dismantling, Repairing and Fabrication of C.I. wheel and shaft of both B side shuttle belt conveyor in RCB top of Raw Coal Section of Sawang Washery.
Power and control cable laying and LCB Box installation for 522 chain conveyor 523, 506, and 525 V Screen at main building of Rajrappa Washery Project
Repairing/ Strengthening of approaching Stair case and its support for stairs going up to unit 702, C-1, C-2 Conveyor belt at Moonidih Coal Washery.
Cold Vulcanizing joint of unit no. 201, 401, 501, 701, and 601 conveyor belts of ROM section at Madhuban Coal washery under Block-II Area, BCCL.
Repairing, replacement of damaged gallery, deck channel of 1601 and 1602 conveyor belt of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing / Replacement and Overhauling of Clean Coal shuttle belt conveyor track rail 30lbs, box clamp, tie rod bolt etc. work in Main Plant of Sawang Washery.
Carrying out Mechanical work F/B-1 and jointing of conveyor belt and F/B- 3 of Nadkhurkee F/B ABOCP Mine under Block - II Area
Upkepemnt of 201 belt conveyor, deck plates, carrying rollers and tail end area of PS-5 section at Madhuban Coal Washery under Block-II Area, BCCL .
Heavy breakdown rectification of discharge drum structure gallery, roller structure and roller frame including jointing of 1200 mm conveyor belt at Nadkhurkee F/B No.-II