Loading…
Loading…
7,172 results • Best match
A)Replacement and reconditioning of 6.6K V V.C Panel, 400Amp, Make-A/Y and Co. Ltd for controlling of primary crusher motor (320K W) 01 no. and (B)Repairing/reconditioning of OCB Switch, 400Amp, 6.6KV, Make-Russian installed at 6.6K V control sub-sta
Erection of earth wires for providing earth continuity for 11kV incoming line from KDH SS, 3.3kV face pump fdr, 3.3kV 32 No. pump fdr, 3.3kV Shovel Fdr, 3.3kV Mohan Nagar, 11kV Township Fdr, 3.3kV Crusher Fdr and 11kV Rail WB Fdr under Dakra OCP
Installation of 01 motor-pump set at filtration plant 42 No Colony N laying 800 mtrs.DWCHDPE 63 mm pipe from 42 No filter plant to Coal crusher to provide water for sprinkling, repairing of LT OH , install of cradle Guard at TNOCP,HZB AREA
A.fabrication of hard metal picks including hard facing and fixing on secondary crusher drum roll of BWF make feeder breaker no. 03 at JRD RLY siding PF-1 in respect of konar exp. OCP, BnK Area, B.Repairing of flight assembly with replacement of flig
(A)Supply and Installation of Earth Pit with heat and shrinkable cable jointing of 120sqmm at 09 No. siding newly installed crusher (B) Supply and installation of earth pit at Tisra Hospital colony S/S North Tisra of Amal. NT-ST-JG colliery under Lod
1. Manpower assistance pocking of gratings of bunkers of Unit-3 for easy flow of coal for CHP,BTPS -B. 2. Manpower assistance material handling and misc. jobs in main store of CHP, BTPS -B. 3. Cleaning of surrounding area of coal crusher, CHP Control
Manpower asssit pocking of gratings of bunkers of Unit-3 for easy flow of coal for CHP,BTPS B. Manpower assistance material handling and misc. jobs in main store of CHP, BTPS B. Cleaning of surrounding area of coal crusher, CHP Control room of CHP,
Repairing and changing of damaged picks and holders and fixing , fitting with new with proper fitting angle after removal of old picks and holders by gas cutting and gauzing electrode of main crusher of 05 nos of crushers under AADOCM for a period of
Cleaning of spillage muck debris of Cleaning of spillage muck debris of TC-4 and TC-5 Belt conveyor from 580 belt gallery to Jharkhand gallery XVI Top Seam 500MH at Moonidih Colliery W. J. Area.
Replacement of tail drum assembly and snub drum assembly after dismantling of existing worn-out Drums for unit 501-A belt conveyor along with strengthening of base frame of its tail drum at Moonidih Coal Washery.
Complete repairing of 02 nos. (pairs) spure and pinion gear of unit no. 118B belt conveyor and 06 halves GC-10 gear coupling for unit no. 116A, 133A and 133B of Pre-Washery at Kedla Washery
Replacement of tail drum assembly and snub drum assembly after dismantling of existing worn-out Drums for unit 501-B belt conveyor along with strengthening of base frame of its tail drum at Moonidih Coal Washery.
Repairing/ Replacement, alignment and commissioning of Rail Track after dismantling of Reclaimer trolley situated above unit-105 belt conveyor along with strengthening of supporting members of unit 104-A and 103-B at Moonidih coal Washery.
Up-keepement of Gallery Area and deck plate area of conveyor belt unit no. 1402 and its Hopper Tail end side at Loading section at 5.0 MTPA Madhuband NLW Coal Washery under Block-II Area, BCCL.
Complete repairing/installation of 02 nos of safety system of pull cord Alarm Panel of Conveyor belt Volt-440V for controlling of F/B No. - I and II Kessurgarh of ABOCP Mine under Block-II Area
Repairing of badly damaged under carriage box,repairing chute and tail end both side screw juck structure fabricating providing fitting jointing of conveyor chain of IR make F Breaker No-05 in R O at AADOCM.
Fabrication / Erection of BC-2 tail drum, H/D protective shield for rotating equipment and railing along the floor nearby BC-2 conveyor to prevent any near miss or accident at Deshaling Plant of Sawang Washery.
Complete repairing of 02 nos. bend drum and snub drum dia (654X1400mm) unit no. 133AandB belt conveyor and repairing or fabrication of 02 nos. tail drum pulley dia 550X1800mm 112AandB of Pre Washery at Kedla Washery.
Fabrication / Erection and repairing different washed coal and washed coal power receiving chute replacement / repairing of shuttle conveyor middling and clean coal receiving chute mother plate and liner plate, repairing of different railing at CCB S
Complete repairing, dismantling and fitting of bearing block with bearing no. 22220 EK in head snub drum (left side and right side) of Unit No. 138 shuttle belt conveyor at Raw Coal Section of Kathara Washery.
Repairing and replacement of 02 nos. shell in tail drum of 1600 x 1100 x 10mm of unit no. 301 and 701 in PS-5 belt conveyor at Madhuban Coal Washery under Block-II Area, BCCL .
Repairing/ Changing of damaged of water spray system and their pipelines at coal transfer point/ discharge end of unit 502, 504, 501-B, 501-A, C-1 and C-2 belt conveyor at Moonidih Coal Washery.
Dismantling/repairing/ replacement of worn out/ damaged deck plates, channels, angles and supporting structure etc for a length of 50 mtr at different locations of unit no. 16 tunnel conveyor belt of CHP, Sudamdih Coal Washery.
1) Repairing, replacement, cutting and welding of transfer point 1105 pajama chute including strengthening of conveyor 1018 from tail to head. (2) Dismantling, repairing, reconditioning, spare changing, re-assembling, fitment of DSM 4RM pump under CH
Replacement of worn out intermediate frame deck plates installation of idler frame with rollers fabrication and erection of same at 902 belt conveyor at PS 9 Building at Madhuban Coal Washery under Block II Area BCCL
Recovery of unused spare control and power cable from cable tray to old jig panel of Module 1 and Module 2 to use in 1016 and 1017 conveyor and other misc. work under CHP CPP PPR
Repairing, strenthening of tail - drum base structure and dismantling and changing of 370 Mtr. Old damaged belt of unit no. 902 belt conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL .
Replacement of 1 No. of Tipper drum and 1 no. of snub drum Assembly after dismantling of existing worn-out drums for Unit 702 belt conveyor and refitting of all its accessories of Moonidih Coal Washery
Strengthening/ repairing, dismantling of tail pulley base and its supporting structure and fitting/ alignment of tail pulley along with its bearing, pillow blocks etc of unit no. 16 tunnel conveyor belt at CHP, Sudamdih Coal Washery.
Repairing/ Strengthening after dismantling of existing damaged portion of posts, stringer channel and crisscross bracing for conveyor structure of unit 403-A up to 75 meters from Head drum at ROM Section of Moonidih Coal Washery.
Fabrication and Erection of stair going to C-1 head side and NS-1 and NS-2 Screen modification of receiving chute, side skirt, gallery support structure of C-2 belt conveyor at Moonidih Coal Washery.
Repairing/ Strengthening of approaching Stair case and its support for stairs going up to head end of unit 301-A and 301-B and 402 conveyor belt for Safety point of view at Moonidih Coal Washery
Dismantling of old damaged and Fabrication / Erection, alignment of new skirt rubber, skirt guard frame of ROM B/C, Picking B/C, Reversible B/C and A side shuttle conveyor in PCH Section at Sawang Washery.
Procurement of Hex HD Nut and Bolt (Mat-MS, Gr-4.6, Full Threaded) fitted with two nos. plane washer for different equipment of Boiler and Coal Mills of U 1 and 2, DVC, KTPS.
Assistance to Cleaning, Up-keeping, transportation of Instruments from different locations of 1) TG and Aux. area of CandI Section,BTPS, DVC 2) Boiler and Aux. and OPH area of CandI Section, BTPS, DVC.
Custom Bid for Services - Onetime Overhauling of Electric Hoists at TG AHP ESP and Boiler Auxiliary Areas of Unit 1 of DVC KTPS Koderma Jharkhand Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - BIENNIAL MAINTENANCE CONTRACT FOR BOILER AUXILIARIES INCLUDING ROTARY EQUIPMENT ASSOCIATED DUCTS DAMPERS FUEL OIL SYSTEMS OF CTPS UNIT 7 and 8 Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Supervision work by ExBHEL expert Safety valve seat cutting during Overhauling of Boiler and Auxiliaries of U1 KTPS DVC 500 MW Similar Category Operation and Maintenance Power House/Power Plant
Schedule-1 - 10 - M4837900251, Schedule-2 - 20 - M4837900252, Schedule-3 - 30 - M4837900253, Schedule- 4 - 40 - M4837900254, Schedule-5 - 50 - M4837900255, Schedule-6 - 60 - M4837900256, Schedule-7 - 70 - M4840903062, Schedule-8 - 80 - M4840903063, Schedule- 9 - 90 - M4840903064, Schedule-10 - 100 - M4840903066, Schedule-11 - 110 - M4837900218, Schedule-12 - 120 - M4837900249, Schedule-13 - 130 - M4837900215, Schedule-14 - 140 - M4840903065
A) Repairing of hoist brake assembly and (B) repairing of air end compressor - II capacity 900CFM to be kept as float BE 195 Shovel Sl. No. Exc-1075 of Kathara Colliery.
Repairing and replacing of AC unit or sub assembly like compressor, blower motor, refrigerant filling and other parts changing of Scania P380 Reg. No. JH10AN 9418 SD25 at ADIC Kusunda Area
Supply and Fitting of Safety Equipment in Six (06) Nos. of ECE make OCB for compliance of DGMS-Violation in compressor Section of Moonidih Project, WJ Area. Sl.No. Comp No. 2,4,18,11,12,15
Repairing of Air conditioner system, compressor repair and blower motor repair for L and T CK-300 Shovel, Sl. No.0757/2946 and BD355 Dozer, Sl. No.T-11890 of Jarangdih Colliery.
Complete Repairing of 02 nos. of 2 HP Compressor Motor with Piston at old Magazine NT-ST and Devi Sthan Golden Pahari of Amal. NT-ST-JG Colliery under Lodna Area.
COMPLETE BELT REPAIRING BY RIP JOINTING PROCESS
PULY CNV NDB PULLEY 2000MM 2200MM, PULY CNV 2200MM 2400MM 630 MM 180MM, PULY CNV BEND PULY 2000MM 2200MM 630MM, PULY CNV SR DIS SNUB PULLEY 2200MM, PULY CNV SR DRIVE PULLEY 2200MM 2400MM, PULY CNV SR DISCHARGE PULLEY 2000MM, PULY CNV SR HOLD DOWN PULLEY 2000MM, PULY CNV SR DEFLECTION PULLEY 2200MM
Repairing of coal crushing machine repairing at loyabad coke plant under Sijua Area.A) secondary coal crusher 12.5mm o/p 33mm 2kg B) jaw coal crusher feed size 200-100mm 5kg
COMPRESSED AIR DRYER, COMPRESSOR
LOADING UNLOADING AND TRANSPORTATION OF ORE FROM BACKYARD TO CRUSHER STOCK FILE
Repair and Replacement job of Crusher Head Gearbin and Floatation Cell Lounder