Loading…
Loading…
7,172 results • Best match
Repairing/ REWINDING OF 1.1 KW swing blower motor 02 nos and 02 nos 5.5 KW compressor motor (one for fitment and one for float) of EKG 5 Shovel sl no 589 of DAKRA Project
Necessary civil repair works in Store room beside CCN and Store room under Compressor shed and drainage related works in the area behind E10-B TE building at E10-B TE Compound, Saraidhela ,Dhanbad.
Fabrication/Repair of Top Cover of Bearing Housing, Aluminium Cooling Fans, and CI End Covers for 5m3 Main Pump M and P make, 200 KW Compressor Motors KG-8 Motors and 110KW/150KW Motors
For partial repairing of Kirloskar Lathe machine accesseries as panel , switches, motor Sl.No. 20272 under Sijua Area
Prov and fixing of Surge Protector Devices (SPD) for protection of CCTV system at Sangam Vihar, Panchwati, Lions club, Regional store, CHP-silo, CHP-reject site for Digital weightometer installed at conveyor belt CV1012,CV-1017,CV-1021,CV-1
Repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same of unit no. 1301 belt conveyor tail end side at PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Replacement of worn-out and damaged tail and tail snub pulley along with tail frame (non-drive) arrangement of unit no. 303 belt conveyor and making of 02 nos. frame stand for belting system of main plant at Kedla Washery.
Replacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit no. 301 drive side belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area,
Complete repairing of 06(six) nos for bearing block of left and right bearing no. 22220 EK of snub drum, tail drum and head drum different conveyor unit no. 60, 73 and 136 respectively in Raw Coal Section of Kathara Washery
Replacement repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 902-2 drive side belt conveyor of PS-9 section at Madhuban Coal Washe
Carriage of spillaged / overflfowed coal from the gallery of 1301 belt conveyor head drum and tail drum areas by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less
Repairing/replacement of worn-out/damaged mother and liner plate of feed chute of 4B feeder,fabrication and fitting of feeder tray and supporting channels,angles etc above unit no 6 tunnel conveyor belt and platform supporting structure of feeder
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 902-2 centre portion side belt conveyor of PS-9 section at Madhuban Coal Washery
Installation of new CGI Sheets (On roof, side walls) along conveyor gantry of unit 702 covering the area between take-up to drive motor after dismantling existing worn-out sheets along with strengthening of its truss member at Moonidih Coal Washery.
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with roller, return rollers, fabrication and erection of same at 902-2 drive side belt conveyor of PS-9 section at Madhuban Coal Washery und
Replacement of worn out intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit no. 704-1 belt conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL .
Transportation from surface and different places in UG XVI seam and installation of VISHWA 1000 mm, 1X112 kW belt conveyor at 3rd rise of XVI B seam junction of jharkhand level and 3rd rise in underground at Moonidih colliery, WJ area.
Dismantling of damaged deck plates, idler frame with rollers, return rollers , installation erection of same and fabrication and erection of deck plates of unit no. 201 PS-2 belt conveyor tail end side of ROM section at Madhuban Coal Washery under
Dismantling of conveyor gallery/ steel build up section/ truss at Kargali Washery for providing hindrance free site for rail line laying work by IPRCL in vicinity of Kargali siding PF II and with dismantling of lights from the structure and erection
Replacement of wornout intermediate frame and deck plates installation of idler frame with rollers fabrication and erection of same of unit no 901 drive side conveyor gallery of PS 9 section at Madhuban Coal Washery under Block II Area BCCL
Transportation and Installation of VISHWA 1200mm, 2X110kw belt conveyor from junction of D-16 B/G and 7 dip to D17B/G, 600 meter inside from 7 dip via 7 dip and D17B/G in UG at Moonidih Colliery, W.J Area
Dismantling of damaged deck plate, idler frame with rollers, installation and erection of same, fabrication and erection of deck plate of unit no. 1402 belt conveyor of middle portion of loading section at Madhuban Coal Washery under Block-II SArea
Dismantling of damaged deck plates, idler frame with rollers, installation and erection of same fabrication and erection of deck plates of unit no. 1404 conveyor tale end side of loading section at Madhuban Coal Washery under Block-II Area, BCCL .
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 801-1 drive side belt conveyor of PS-9 section at Madhuban Coal Washe
Repairing, dismantling and fitting of bearing block with bearing no. 22528 HL in tail drum and head drum ( Left side and Right side) of unit No. 143 sec-I belt conveyor in (00) level of Raw Coal Section at Kathara Washery.
Repairing by new change of M.S Cell of drive and driving Conveyor drum for 102 belt(Drum Size OD630mm, Cell length-1600mm and Cell thickness-16mm,Qty.-02Nos.)of vertical section of Moonidih Project.Sl.No.CP102/MND/01 and CP102/MND/02
Dismantling of drum and equalization pinion with guard and refitting of drum after bearing changing of FB No1, repairing and reassembling of broken chain conveyor of FB No2,Replacement of defective motor and broken chain of drive unit,FB No5, AMPC.
Replacement of damaged intermediate frame and deck pates, installation of idler frame with rollers, fabrication and erection of same at 501 belt conveyor of tai end side at PS-5 ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Replacement of wornout intermediate frame and deck plates, installation and erection of idler frame with rollers, returns rollers, fabrication and erection of same at 801-1 Tailend side belt conveyor of PS-9 section at Madhuban Coal Washery under Blo
Carriage of spillaged / overflowed coal from the gallery of 1301 belt conveyor head drum and tail drum areas by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less th
Changing of Motor for 4 Nos. pumps at 1201 pump house, NS-1 and NS-2 Screen, unit 301-A and 301-B belt conveyor, Rotary Breaker 203-A along with modification of their motor bases at Moonidih Coal Washery.
Diversion of the LT O/H line by laying underground cable with the use of directional boring tools for the construction of the NTPC coal pipe conveyor near weighbridge 07 and Kundi 05 number junction, under Magadh OCP, M-S Area
Transportation and installation of VISHWA 1200 mm, 2X110 kW belt conveyor from 6th rise D17 BG junction to 10 rise D18 BG via junction via 7 dip of companion level gallery in XVI Top seam ,500MH at Moonidih colliery, WJ area
Dismantling of old and damaged vertical structure iron and steel materials and fitting of new iron and steel materials strengthening and painting of 949 and 950 belt conveyor column no. 1 and 2 from head side in RLB Section at KTW
Replacement and repairing of damaged intermediate frame and deck plates. installation and erection of idler frame with rollers, return rollers, Fabrication and erection of same at 801-1 tail end side belt conveyor of PS-9 section of Madhuban Coal W
Replacement of deck plate,channel,angle,adapter shaft sleeve of drive head pulley rectification of ovelled bore output gear coupling GC-12 Key,Keyway making after reinstallation and alignment of unit no.247 and 304 belt conveyor of main plant KW
Repairing/ Replacement of water spray system and their pipelines at different coal transfer points of belt conveyor unit C-1, C-2, 504, 501-B under Raw Coal section and unit 704, 901, 903 under loading section at Moonidih Coal Washery
Dismantling 8 inch dia pipe line from under the earth and repairing ,welding and fitting with all complete fitting (like valve, socket, bend, tee and sprinkler) above the earth for dust suppression/cleaning along the conveyor 1027 from 1106 transfer
Replacement of worn out intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at 902 belt conveyor of drive side at PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL.
Replacement of worn out intermediate frame and deck plates, idler frame with rollers, return rollers both side counter weight area and repairing of damaged counter weight platform Fabrication and erection of same at unit no. 801-1 belt conveyor of Ma
Replacement of wornout intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 507-2 belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area, B
Replacement / Repairing, strengthening of damaged structure of shed of unit 704 clean / middling loading conveyor between clean coal silo No. 2 and 3 and all the structure above the shed along with 15 mtr. Shed structure from middling silo towards he
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 902-2 Tail end side belt conveyor of PS-9 section at Madhuban Coal Washe
Cleaning of mangardaha nallah by desilting of settled bed silt etc starting from Bijain and via RITES under pass, Rajdhar tanker filling point, old pit office junction, 1104 conveyor belt, chiraiyatand upto garhi river for disposal of rain water from
Repairing of damaged tail end shaft assly and chain adjusting screw, repairing of wornout side liner and retaining plate of hopper,Replacement of conveyor chain,dism. and fitting of flight assly with side plate repairing,I.R F/B no 2,Phularitand.
Fabrication, erection and repairing of mother plate and liner plate of transfer B/C, receiving pyjama chute, transfer B/C discharge chute, screen discharge chute, changing of rail between by-pass and picking conveyor etc. work in PCH Section of Sawan
Replacement of worn out intermediate frame and deck plate, installation of idler frame with rollers and fabrication and erection of same at unit no. 401 middle portion belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area, BCCL
Carriage of spillaged / overflowed coal from the different equipments like chain, belt conveyor and bucket elevator from the floors of 45M, 35M and 31M of PS-5 building by manual labour including loading unloading and stacking and loading of stacked
Custom Bid for Services - Manual Picking Up Or Removal Of Boulder Stones Metal Pieces Shale Etc Coming With Raw Coal From Running Conveyor Belts On Round The Clock Basis Including Sundays And Holidays For 02 Two Years In CHP KTPS
Replacement of wornout intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at Unit no. 916 conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area,