Loading…
Loading…
7,159 results • Best match
Replacement of 1400mm width conveyor belt in unit 501A and 402 belt conveyor of Moonidih Coal Washery.
Procurement of General Boiler spares and tube shield for Boiler-BTPS 1X500 MW Unit-DVC
Deployment of Ex-BHEL Experts during Capital Repair of Boiler 2 For Boiler and Auxiliaries
Ash Slurry Submersible Pump with Motor and all Accessories for Boiler 9 and TPP boiler
Repairing of both end crusher roll along with cutting and welding of picks with holders before and after repairing of crusher roll at AMP Colliery
Dismantling, Repairing and Strengthening of bed frame, feed chute and motor base of hammer crusher unit 506-2 at crusher house of Moonidih Coal Washery.
Repairing changing of LHS side final drive planetary gear box by repaired one and old serviceable final drive splined gear shaft and internal ring gear assembly opening form grounded machine fitting of LnT CK 300 Sl. No 738.
One set consist of 3 items (1) carbide parting tool lathe 25x16 mm bar, 01no/set, (2) carbide parting tool lathe 16x10 mm bar, 01no/set, (3) carbide V tool lathe 20x20 mm bar, qty=01no/set, Make- miranda/sandvik/widia or similar, (a) Only 100% genuine tools accepted,
Removal repairing installation and commissioning of damaged double roll crusher assembly of Interim CHP
PRTBL COMPRESSOR, TROLLEY MOUNTED, 60CFM
RIBBON FOR SCREW CONVEYOR -RH HELIX, RIBBON FOR SCREW CONVEYOR OF BBD 4772 COAL MILL– LEFT HAND HELIX
Repairing, Cutting, Welding and straightening of Base with Base Plate of 160KW Motor and Gear Box installed at Elecon make Feeder Breaker no 3 under Urimari OCP.
Strengthening of CPP Boilers (6, 7 and 8) and auxiliaries for Supervisory control.
Replacement of Coal pipe bends and straight pipes of Boilers 6 to 9.
Fabrication of Protection Strips and U-Loops for Economizer Coils of TPP Boilers
Fabrication of Protection Strips and U-Loops for Economizer Coils of TPP Boilers
Overhauling of RC Feeders and replacement of Coal dust pipes for CPP Boilers.
Strengthening of CPP Boilers (6, 7 and 8) and auxiliaries for Supervisory control.
Annual Maintenance Contract for Boilers and Turbines (Mechanical) of TPP and Unit 9
Cleated Pocket Zigzag Sidewall portable Conveyor
Hot valcanizing of 301 Belt conveyor
CONSOLIDATED PROCUREMENT OF CONVEYOR BELTS FOR
Making conveyor chain flight assembly brackets
CONVEYOR BELT NON HR GRADE BSL
CONSOLIDATED PROCUREMENT OF CONVEYOR BELTS FOR
650 MM WIDE SIDEWALLED CONVEYOR BELT
Repairing of Rotary Crusher drive shaft at Moonidih Coal Washery.
Shifting of crusher substation at Karma OCP under Kuju Area.
Repairing of Primary Crusher 2101 under CHP-CPP, Piparwar Area
R/M of crusher no 4 in r/o AADOCM
Repairing/replacement secondary crusher discharge chutes of Dugda Coal Washery
R/M of Elecon make crusher at AADOCM Dhori Area
Sch1 100252633 10 M5501206500 Rotor Assembly for Ring Granulator (Crusher)
Spares for WIL make Boiler
Spring Loaded Boiler Safety Valves
Spare for THERMAX make Boiler
Spare parts of package Boiler
COMPRESSOR, AIR, STATIONERY; F/Q LOCO (Q3)
1. Dismantling the entire air compressor. 2. Cleaning the entire parts with petrol oil and other special type of liquids. 3. Changing of failed and seized parts with new ones.
Supply of Conveyor Belt Fastener
Repairing of boiler Capacity 5000 kg per hr
Complete repairing and overhauling of C.I. wheel and shaft of washed coal shuttle conveyor, washed coal power shuttle conveyor and stockpile shuttle conveyor in Main Plant at Sawang Washery.
TOGGLE PLATE FOR JAW CRUSHER LENGTH: 50 INCH, GROUP: C, AS PER DRG. NO. PE/326R., TOGGLE PLATE FOR JAW CRUSHER LENGTH: 62 INCH, GROUP: F, AS PER DRG. NO. PE/326R
Repairing of gear box, differential and mountings of engine, radiator, diesel and hyd. Tank of ACE Crane Sl. No. 6131223520 CIL No. MC 628.
Repairing overhauling of gear box type GB-160A-1 car haulage system in Loading section at Madhuban Coal Washery under Block-II Area, BCCL .
For Dismantling Re-fitting Gear box and APS and CPU air leak of Scania P380 Sl. No. JH10AM-7801 at AKWMOCP , KATRAS AREA, BCCL
Repairing of RHS final drive gear box, upper structure frame and damaged operator cabin of TATA Hitachi, Exc-2961 of Govindpur Ph-II OCP.
Repairing and overhauling Gear Box, Clutch assembly, main hydraulic pump and replacement of seal kit of boom cylinder of Crane at Moonidih Coal Washery.
Repairing Rotary Gear Box and fabrication of new shaft and bottom plate of Drill SI No. DR-241 at kuya OCP. Bastacolla Area IX