Loading…
Loading…
7,160 results • Best match
Dismantling of 150 Mtr Belt Conveyor and Conveyor Belt Fitting, Cutting with Belt Fastner of Atlas Copco Make CHP BNR Siding, ROCP/SJ. Under
Replacement and repair of the troughing idler support of a 1400 mm belt conveyor for Unit No 401 A n 401 B and dismantling fabrication erection and alignment of discharge chute liner of secondary crusher both A n B side under Raw Coal section of Ra
Repairing of Gear and Trip Gearbox of EKG 5A Shovel Sl No 565 of Gidi C Colliery
Complete Assembly of CKC-355 Gearbox and Critical Spares of other gearboxes for Owner CHP for PBCMP
600 mm. WIDE NYLON CONVEYOR BELT OPEN ENDS, 4 PLY BELT RATING 630/4 AS PER IS-1891 (PART-1) MEDIUM D, Conveyor Belt 450 mm wide X 5 PLY X 10 mm Thick, Conveyor belt 1050 X 500 mm X5 PLY, " 900 mm wide Nylon conveyor belt open end, 7 ply belt rating 2500/7, Medium duty grade M/24, Top/bott
Custom Bid for Services - Fitting of top and bottom roller in reclaim conveyor belt fabrication of middle support of top bracket shell replacement in conveyor drum assembly fitting of heavyduty impact pad replacement of C16 conveyor belt fabrication..
Mill Reject Compressor, Model: SGA110-8.6-50 WP of atlas copco
Repairing and reconditioning of air compressor set model TC 500 Elgi make of EKG 5A HMB 591 shovel
Air Lube Plus (210 Liter Pack), Part no. 00099805C for ELGI make Air Compressor Model no. EE75-8
AIR INLET FILTER ELEMENTS CONICAL TYPE, Air Intake Filters Cylindrical type for Process Air Compressor on OEM basis
Air Lube Plus (210 Liter Pack), Part no. 00099805C for ELGI make Air Compressor Model no. EE75-8
Air Lube Plus (210 Liter Pack), HSN Code - 2710, Part no. 00099805C fo ELGI make Air Compressor Model
Repairing /rewinding one no. transformer of capacity 250 KVA, 3.3 KV/440V, Sl. No. 817/3 used for RKS crusher to feed the power departmentally to crusher at Tapin North OCP, Hazaribagh Area.
Annual Maintenance Contract of CPP Boiler House Electrics.
Annual Maintenance Contract of CPP Boiler House Electrics
Corrosion Mapping of pressure parts of CPP Boiler
Procurement of Boiler HP Valves and its spares
Changing of Top Economizer panels of Boiler #3.
Instrumentation jobs during Capital Repair of Boiler 4.
Instrumentation Jobs during Capital Repair of Boiler-9
Replacement of HFO tracing line of Boiler 9
Capital Repair of Ball Mills of Boiler #9
Annual Maintenance Contract of CPP Boiler House Electrics.
Common consumable for boiler and coal mill ctps
Procurement of miscellaneous spares for boiler and auxiliary
Capital Repair of TPP Boiler Two (02) Units
SIDE SKIRT PLATE FOR GRAVIMETRIC FEEDER OF BOILER
Procurement of Slides of Mills of CPP Boiler
Procurement of Boiler tube shield and other spares
Critical Spare Kone Make Boiler Lift at CTPS
Maintenance of Thermal Insulation and Aluminium Cladding of Boilers and Turbine in TPP, CPP and Unit 9
Annual Maintenance Contract of ESP and Ash Handling System including Dredge Pump House 2 of CPP Boilers
Replacement of Vertical Feed Gate Housing Assembly and Clinker Grinder Assembly for CPP Boilers (6,7 and 8).
Assistance in operational activity of CPP Boilers 6, 7 and 8 for equipments installed at zero meters.
Annual Maintenance Contract of ESP and Ash Handling System including Dredge pump house 2 of CPP Boilers.
Replacement of different Compensators in airline and flue gas duct of CPP Boilers 6, 7 and 8.
REPAIRING OF ROTARY HEAD GEAR BOX ASSLY.(PT.NO.- D06D070000012) WEAR PLATE CHANGING AND REPAIRING OF MAST STAND, MAST MOUNTING OF SANDVIK 140004 DRILL (DR232) OF AMP COLLIERY BARORA AREA.
Complete repairing of 2nd Intermediate gear with shaft and output gear with shaft of gear box SDH Santhi gear R-125 isto 1 of main plant at Kedla Washery
Repairing of gear box, differential and mountings of engine, radiator and Diesel and Hydraulic tanks of ACE 12W Crane Sl. No. MC 558 and MC 644 of Giridih Project
Dismantling the exiting work out base structure of 7 no. Feeder gear box and fabricating and erecting the same with new base in Raw Coal Section at Kathara Washery
Dismantling of one poney belt Drive head from E-7 BG/4th dip jn.and transportation of one pony belt accessories such as gear box, gib drum, motor, starter etc.
Repairing, overhauling of vibrating screen gear box assembly of unit no. 910-1 and 913-3 in PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL .
repairing of rotary gear box foundation plate frame welding work of mast body and V groove making and welding of Idm-30 drill sl. No. 826 of Konar Expansion
Repairing and replacement of the EOT crane mechanism gear box and lifting etc of Overhead crane 10 Tone of heavy repair shop under Regional Repair Shop, NK Area Dakra
Repairing of Propeller shaft, Clutch system, steering box, Tie rod Assly, Gear Box and differential of Diesel Bouzer Sl.No. JH-10AZ/3394, (Eicher) make of Dahibari OCP CV Area.
Complete repairing and making of redicon gear box make elecon engineering co ltd type SBN315 WHG16580 RH Ratio17 1 for controlling of feeder breaker No3 of Muraidih AMP Colliery
Rep. and strengthening of gear box and motor base structure and middling bucket elevator unit no. 917 at PS-9 at Madhuban Coal Washery under Block-II Area, BCCL .
For Repairing of Cabin Denting, Welding, Win Shield Glass, Cabin Mounting Opration Seat Full Body Painting and Clutch Plate Gear Box Sl. No.- JH05G 6605 at Katras Area BCCL.
Repairing of brake system, hub, spring leaf, gear box, kin pin, tail crown and wheel greasing of TATA truck bearing registration no JH02AN3499 of Karma Project under Kuju area
Repairing of Crowd gear box cover, hoist coupling guard and all the coupling guard of motor and generator (04 Nos.) of MG Set of EKG 589 of Dakra Project