Dismantling and fitting of Bearing (22222) secondary crusher back pulley (A) side of Raw Coal Section of Rajrappa Washery Project.
Construction of PCC road from Central Pool siding main gate to 1st crusher at Central Pool siding under Lakhimata Colliery.
Dismantling, Changing damaged parts and assembling of unit 505-3 inclined vibrating screen at Crusher House of Moonidih Coal Washery
Rehandling of spillage materials from crusher House building of 5.0 MTPA Madhuband NLW Coal Washery under Block-II Area, BCCL .
Providing and Fixing of bearing no. 22319 and 21314 of Input Shaft of Primary crusher 2101 under CHP-CPP, Piparwar
Dismantling fabrication, , erection and alignment of base plate, chute tray of lab crusher installed at loading point. of Rajrappa Washery
Repairing of roll cylinder of double roll primary crusher unit no. 201B under raw coal section of Rajrappa Washery Project.
Fabrication/Erection and Repairing of feeder discharge chute and single roll crusher discharge chute in PCH Section at Sawang Washery.
Shifting and erection of 20 mrs. high mast tower from 5 no. depo to crusher side at DBOCP, CV Area.
REPAIRING OF DAMAGED SECONDARY CRUSHER DRUM AND NEW FABRICATION OF KNIFE, SETTING and WELDING AT SIJUA CHP UNDER KATRAS AREA
New making of two nos. of plumber block through casting and machining for crusher roll of Feeder Breaker, AMP Colliery
Coal transportation from coal dumps of Basantimata Dahibari Colliery to Dahibari Washery via cont. mobile crusher under CV Area, BCCL
New making of two Nos. of plumber block through casting and machining for crusher roll of feeder breaker, AMP Colliery.
Fabrication of 02 Nos. of plumber block for crusher drum of F/B No 05 of AMPC of Barora Area.
Providing and fixing chain link fencing from crusher no.1 towards silo along belt line at interim side under ROCP.
Engagement of hydraulic excavator to pick up the band other works at interim and BTL Crusher at RCHP under ROCP.
Custom Bid for Services - Supply installation commissioning of lighting circuit at haul road from RCML crusher to water filling point
Overhauling and Repairing of Power Steering, king pin, front both side spring leaf, self starting, gear box, propeller shaft, water tanki crack repairing, Top and bottom revolving ,pressure pipe socket new making, front both side damage door repair
Repairing changing of LHS final drive planettary gear box, old servicable final drive bearing,spline gear shaft and internal ring gear assy ck300 sl no.754 after old servicable above items opening from grounded ck300 of Bhurkunda OCP
Repairing of loop take up gear box, type SUMB, gear ration-20 1 make Newallenberry works Calcutta of TC-02 and TC-06 of CCS circuit of Moonidih Underground Mine. Sl.No. B/55645(TC02) and B/55649(TC06)
Repairing and fitting of damaged/decayed bucket link assly. 52 set of 800mm width of 207bucket elevator along with lining plate, angle and gear box, duplex driving chain maint. and replacement of damaged/decayed platform, stair case arrangement
A) Repairing and overhauling of GS-45 gear box for 248 B/C and B) repairing of damaged head drum shaft and take up drum shaft of unit no. 190 B/C in HMS Section of Kathara Washery
Repairing of A Repairing/seal kit changing with bush changing of roll back cylinder, B Temp. switch twin entry, C Radiator assy. D Track Drive Gear Box LH side, E Hydraulic pump of SDL 881of 7, 8 incline
Repair cum eplacement of the components under gone wear and tear of the auxiliary system of the mechanism, Gear box and lifting etc of Overhead Crane 05 Tone of Electrical Shop under Regional Repair Shop Dakra (NK) Area.
(1) GEAR BOX REPAIRING JOB OF HYVA REG.NO. JH10AD- 4353 OF AAWS,KATRAS AREA.(2) REPAIRING JOB OF HYVA REG.NO. JH10AE- 1606 OF AAWS,KATRAS AREA.(3) REPAIRING JOB OF HYVA REG.NO. JH10AG - 7403 OF AAWS,KATRAS AREA.
Rep. of Travel gear box (LHS) and Travel Motor (LHS) along with repairing of Travel device flange and housing (Track Sprocket housing) railings and also repairing of Lighting, system of TH ZX650H model Excavator machine sl. no. 165
Repairing/New change of Warm Wheel, Warm shaft and etc. of loop take-up gear box. Type-SUMB gear make New Allenberry, Ratio 20 1 of skip pocket main belt Apron feeder for Vertical Section. sl.no. B/50649
Repairing of Look take-up gear box, type-SUMB, gear ratio 20 1 make Newallenberry works Calcutta of TC 07 and TC 05 of CCS circuit of Moonidih underground Mine. Sl. No. 1.B/55644 2. B/55647
Repairing and Recondi-tioning of Gear box, Clutch, Tail crown, Radia-tor, Fuel Pump, Diesel In-jector Nozzle, Head gasket assy., Belt Tensioner, Self-Starter, Alternator, Engine mounting, Parking brake system, drive line work of UTTAM CONSTRUCTION EQ
SUPPLY, FITMENT AND INSTALLATION OF SPARE PARTS OF GEAR BOX. SET OF SPARE PARTS:- (1) OIL SEAL SIZE OD-160MM ID 75MM, THICK- 7MM, QTY- 28 NOS. MATERIAL - NITRILE RUBBER (NBR) IS: IRS-R-48/88, GR 'C'
Repairing. Overhauling, Precision Machining, Repairing of M.S. Channel Gear Box Base Frame, Build-up Welding, Assembly, Alignment, Testing and Commissioning of Gear Boxes installed at Bucket Elevator, BC 03, BC05, BC 06 and BC 09 of Sawang Washery.
Complete Repairing, Overhauling, Rectification ,Maintenance works with spares of Bharat West Fallia make Feeder Breaker Primary crusher drum roll drive Gear Box assembly K800 type, installed at Tarmi Siding of SDOCM Project.
1- A.C. Air Compressor Complete Overhauling, Repairing Fitting. 2- Cleaning and Washing Entire Parts from Petrol and Other Liquid. 3- A.C System Blower Motor Removing, Fitting.
1- AC Air Compressor Complete Overhauling, Repairing, Fitting. 2- Cleaning and Washing Entire Parts from Petrol and Other Liquid. 3- AC System Blower Motor Removing, Fitting.
Custom Bid for Services - Annual Maintenance Rate Contract for Jointing of Nylon/Nylon Conveyor Belts and Lagging of Conveyor Pulleys with Diamond Groove Rubber Sheet and Cold Vulcanising Process Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Procurement of M/s Kirloskar Copeland Chiller compressor for SWAS systemfor NKSTPP
Replacement of belt strengthening of base support of tension drum of 1000 mm and 1400 mm belt conveyors under Main Washing Plant of Rajrappa Washery
Repairing/ Replacement of water pipeline of spray system at different coal transfer units under Loading Section and Washed Coal/ Middling conveyors at Moonidih Coal Washery.
Custom Bid for Services - Annual Rate Contract for Loading Transportation and Unloading of Stonesboulders and other extraneous materials removed from running conveyors of CHP BTPS
Fabrication and Erection of new discharge chutes after dismantling of existing worn-out chutes for unit 502 and 504 belt conveyors at Moonidih Coal Washery.
Manpower assistance in operation of Raw Coal Feeding system and housekeeping of conveyors 5A-5B, 6A-6B n 9A-9B and bunkers of CHP, BTPS.
dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of Rajrappa Washery Project.
Manpower assistance in operation of Raw Coal Feeding system and housekeeping of conveyors 5A-5B, 6A-6B and 9A-9B and bunkers of CHP, BTPS.
Dismantling , fabrication , erection and alignment of stairs , deck plates for 45 Mtr level and 504 belt conveyors of PS-5 building of Rajrappa Washery Project
Complete repairing of 04 nos. snub pulleys (dia 400X1150mm) of unit no. 247, 415, 302 and 307 belt conveyors of main plant at Kedla Washery.
Dismantling overhauling of Gear Boxes (Gear Boxes 1101 1204 1304 and 1106) of belt conveyors replacement of belts etc under Loading Section of Rajrappa Washery
Replacement of 1200mm conveyor belt of Feeder Breaker No 1 at Nadkhurkee of ABOCP Mine
RCC protection wall around conveyor structure pillar near zero point at ROCP under Rajmahal Area.
Repairing of wheel for wash coal shuttle conveyor in Main Washing Plant at Sawang Washery.
Replacement of 1400 mm vide conveyor belt in 501B and 105 at Moonidih Coal Washery.