Loading…
Loading…
5,515 results • Best match
SPARE PARTS FOR ELGI MAKE AIR COMPRESSORS
air compressors Experience Criteria 3 Year (s)
Reciprocating Air Compressors-Electric Motor Driven (Q2)
Custom Bid for Services - Annual overhauling of 02 nos oilfired boilers Reg No MP 4965 MP 4966 capacity 12 TPH each for open inspectiondry test and hydraulic test as per Indian Boiler Regulation Act
Biennial rate contract for the supply of spares of M/s L and T MHI Power Boilers Pvt Ltd make coal mill(MVM32F) installed at boiler area of 2x660MW,Stage-II SSTPP,MPPGCL,Dongalia
Repairing and Straightening of damaged Tower/ Mast Assembly, complete feed chain assembly, repairing of gear box housing and rotary guide plate for DMH-2 Drill and Repairing of motor mounting plate of Rotary gear box of REL750-3 and REL850E-6 Drill
Dismantling of Swing Gear box assembly (LHS and RHS), re-building and boring of Bearing housing of Swing shaft Assembly, rebuilding of oval shaped holes and making holes of Swing gear box and its foundation, re-threading of PH 1 and 2 shovel
Repairing and over hauling of PTO gear box of vehicle no Fire tender 1 and Fire tender 2 and engine and gear box of repairing of MP53GA0203 and diesel engine repairing of vehicle no MP66G 2341 at Light vehicle section Nigahi Project
Repairing / re-building of swing gear box oval shaped hole, foundation of swing gear box and housing of swing shaft mounting holes ( LHS and RHS) of PH-1900AL (10 CuM) Shovel having Sl. No. 3 and 7 at site at Nigahi Project.
SUPPLY OF EPICYCLICAL GEARBOX COMPLETE ASSEMBLY FOR PADDLE FEEDER.
Procurement of Gearbox for Alum Agitator at Bina Refinery
supply of Wall blower and LRSB gearbox internal spares
Supply of APH Gearbox Model- 8APB make Shanthi Gears
Procurement of Greaves Make Gear Box Model U600, Fluid coupling Model FCU 10.5 and its Spares For Bottom Ash Eccentric Crusher for AHP of Unit no. 3 and 4 and Pembril Engineering make Fluid Coupling Model 41SCR 24X for ID Fan of Unit no. 1 an 2 SGTPS
Custom Bid for Services - Repairing of Belt conveyor drive head (Make BTL), Gear Box (90KW, Make Allenmax) and main Ventilation Fan (Make MMMC, Model PV 200) Similar Category Repair and Overhauling Service
Vindhyachal BHEL make valves for 500 MW Unit Boilers
SPINDLE SHAFT FOR SIDE HEAD GEAR BOX OF HOMMA MAKE PLANNO MILLER M/C-3/A/2055, DRG NO. 1SP14013929
Supply ,installation and comissioning of Reciprocating air compressor of operating pressure 7.0Kg/cm2, 500 CFM consisting of water cooled intercooler,intercooler safety valve, oil and air pressure gauges, automatic unloading pilot valves, mechanical
Work for Annual Maintenance Contract of Primary Crusher, Secondary Crusher and Pulverizer at Coal Sampling Laboratory, STPS, Sarni.
Boiler Chemicals
Repairing of Allen-Renk make gearbox spares, Equalizing gears and Tirex transmission make EXT250 gearbox spares of drive head at Bhadra 7-8 mine
Conveyor roller (Q4)
Conveyor roller (Q4)
IDLERS FOR CONVEYOR
NYLON CONVEYOR BELT
Conveyor roller (Q4)
Conveyor roller (Q4)
CHAIN CONVEYOR ASSEMBLY
Conveyor roller (Q4)
Conveyor roller (Q4)
Biennial rate contract for supply of spares of coal mill (MVM32F) installed in the boiler of 2x660 MW, SSTPP, MPPGCL, Dongalia on proprietary basis from OEM M/s LnT MHI Power Boilers Pvt Ltd Faridabad
Procurement of L and T MHI Power Boilers Pvt. Ltd make Secondary Re-heater tube bend type R-014 and R-015 installed in different zone of Boiler area of 2x660 MW,SSTPP,MPPGCL Dongalia.
Custom Bid for Services - Annual overhauling of 02 nos oilfired boilers Reg No MP 4965 and MP 4966 capacity 12 TPH each for open inspectiondry test and hydraulic test as per Indian Boiler Regulation Act
Custom Bid for Services - Works Contract for Highly skilled Man power for operating CNC Machine Similar Category Manpower Outsourcing Services - Man-days based
Procurement Spare parts of Shanti make Gear Box installed at Air-Pre Heater of 2x600MW Units, SSTPP, MPPGCL, Dongalia
Procurement of spares for New Allenberry make 5APC Gear Box of unit no.10 and 11, STPS, MPPGCL, Sarni.
Work contract for complete repairing/refurbishment of CT make-up valve gear box installed at 2x600MW, SSTPP, MPPGCL, Dongalia
Repairing/overhauling of rotary gear box assy. of IDM70E model Drills Sl. No-201210185 and 200910146 of Amlohri Project
Procurement of spares for shanthi make gear box installed in stacker reclaimer of CHP 210 MW, ATPS, MPPGCL, Chachai
Steel Tubes For Idlers For Belt Conveyors-IS:9295 (Q3)
Hiring Inspection Vehicle for Parvati Project Light machinery E/M Sub Division No. 2 Bhopal (M.P.)
Annual Maintenance contract of coal sampling mechanical equipment (Primary crusher, secondary crusher, Tertiary crusher and Laboratory Pulverizer) installed at Nigahi Coal Testing Laboratory for a period of one year (365 days).
DRR 10527 PWD LIGHT AND MACHINERY SUB DN SATNA
5 TPH OIL FIRED BOILER (FOR NORTH BOILER HOUSE) (Q3)
Procurement of Boiler Tube Bends for Stage 1 Boiler 6X210
Work for Annual Maintenance Contract of Primary Crusher, Secondary Crusher and Pulverizer at Coal Sampling Laboratory, STPS, Sarni.
Forged Hammer for Crusher As per Technical Specification Sheet and BOQ
Repairing and over hauling of PTO gear box of vehicle no MP53GA 0641 and MP66G 2055 and engine and gear box of repairing of MP66G 2055 and water pump repairing of vehicle no MP66G 2155 and MP53GA 0641 at Light vehicle section Nigahi Project
BELT CONVEYOR SYSTEM 12 FT, CURVED ROLLER CONVEYOR SYSTEM