Loading…
Loading…
13,532 results • Best match
ECHP-I-Erection of 32 Nos. new cage bars 16RH 16 LH suitable for RM-54 Ring Granulator -C at Secondary Crusher House-I
Cleaning of I and II Pass Boiler structures, from 0 mtr to 56 mtr elevation, PRDS floor, HWMP, BFP room, collection and devolution of scrap materials to stores and disposal of fly ash, debris etc., from Unit V from 08.04.18 upto 30.09.18
MTPS I BM Unit III Boiler Pressure parts COH 2019 Maintenance of Burners and Replacement of worn out fasteners at cover plates
TROUGHING IDLER GARLAND FOR 1500MM CONVEYOR CONSISTING 3 NOS OF IDLERS OF SIZE 159 MM DIA X 552 MM L, RETURN IDLER GARLAND FOR 1500 MM CONVEYOR CONSISTING OF 2 NOS OF IDLERS OF SIZE 159 MM DIA X 835 MM
SUPPLY OF COMPRESSOR-CENTRIFUGAL (SPP) FOR CAUVERY BASIN REFINERY (CBR) PROJECT OF CHENNAI PETROLEUM CORPORATION LIMITED, NAGAPATTINAM (TAMILNADU)
COMPLETE CONVEYING DRAG CHAIN FOR BED ASH CONVEYOR F1, F2 & R1 CONSISTING OF 602 PITCHES OF 142 MM P, COMPLETE CONVEYING DRAG CHAIN FOR BED ASH ELEVATOR F3 & R2 CONSISTING OF 288 PITCHES OF 216 MM PITCH
PROVIDING WOODEN SHED FOR METAL DETECTOR (LINE -2 INFEED BELT CONVEYOR) IN CHIPPER HOUSE AT TNPL UNIT-II TRICHY
Furnace Area Repair Works in Boiler 4, 5, 6, 7 at Energy Mechanical in TNPL Unit I
MTPS I BM Unit I to IV Boiler Pressure Parts Safety Valve floating during AOH COH 2024
Service contract for calibration of Boiler PG Test instruments from NABL accredited institutions/laboratories for 2021-2023
Replacement of Water Coil Tube in Diesel fired Canteen Boiler at Energy - Mechanical in TNPL Unit - I
procurement of Various sizes of Variable Load Hanger Assembly and constant Load Hanger Assembly for 600MW Boiler
Replacement of eroded coal transport pipelines and discharge Y chute in Boiler # 4 at TNPL Unit 1
RADIAL SEALS AND BYPASS SEALS FOR AIRPREHEATER A and B SUITABLE FOR 600MW BOILER OF UNIT I
NCTPS II MI Circle BM Division Unit I Boiler 600 MW Air preheater 1B Annual overhaul works
Preparation of Refractory Internal Brick Lining Drawing for Chimney of CO Boiler in Manali Refinery of CPCL
Application of Castable Refractory and Plastic Refractory in Boiler 4,5,6 and 7 Furnace area at Energy - Process
Custom Bid for Services - REPLACEMENT OF DAMAGED INTERNAL ESP OF FBC BOILER 2 Similar Category Support Services
Intercarting of wet fly Ash Generated in Power Boiler 4,5,6.and 7 to LSFM at Energy Process
SUPPLY AND APPLICATION OF ANTI-CORROSIVE PAINT IN RECOVERY BOILER CHIMNEY STRUCTURAL STAIRCASE AT TNPL UNIT-II
Supply of Local Gauges and Elements for Boiler#8 and its related areas at TNPL Unit I
SUPPLY OF SPARES FOR REHEATER SAFETY VALVES and SOOT BLOWER IN UNIT I II and III BOILER
SUPPLY OF MS ERW PIPES, MS BENDS and MS FLANGE FOR UNIT- I, II and III BOILER
Reconditioning of Black Liquor Spray Gun at Recovery Boiler 3 in SRP - Mechanical at TNPL Unit-I
Fabrication and supply of Column, GF, Buckstay, Boiler Trim Piping Supports and SCR Components for various Projects
Supply of Flow Elements Orifice Plates for Boiler-8 of RSPS-2 project at TNPL Unit I
NCTPS II MI Circle M I Circle BM Division Unit II attending Boiler tube puncture and upkeeping
Various sizes of tubes and bends suitable for Re-heater front coil assembly suitable for 600MW Boiler
Supply of various sizes of door bends of HRA side wall door bend in boiler 4 Items
TTPS Mech II BM Full reconditioning of worn out coal nozzle tips required for Unit I Boiler
Hot end sector plate assembly for air pre heater 2A and 2B of unit-II 600MW Boiler
NCTPS II M I Circle BM Division Unit I Boiler Annual Overhauling of Water Wall Soot Blowers
Design, Manufacturing and Supply of Water wall tube, Screen tubes, drain lines Tubes and bends for boiler.
supply of 28 inch coal nozzle tip of tilting and tangential firing burner suitable for 600MW boiler
NCTPS II M I Circle BM Unit I Boiler 600 MW Attending leaks in Steam pipe lines
Design Manufacturing Supply of Tubes and Bends for LTSH Coils SCSW for Unit I II III boiler
Removing of Bed ash generated in power Boiler # 4, 5, 6 and 8 at Energy Dept Process
Preparation of Power Boiler 1 to 7 for Annual Inspection at Energy Process in TNPL Unit 1
NCTPS II M I Circle BM 600 MW Unit II Operation and upkeeping of Unit II Boiler
Technical Supervisory Service for Refractory Lining in Furnace Boiler 6 at Energy - Mechanical in TNPL Unit - I
NCTPS II MI Circle BM 600 MW Unit II Operation and upkeeping of Unit 2 Boiler Goods
MTPS I TM Unit II Inspection and overhauling of Boiler Feed Booster pump 2B and allied works
Procurement of Boiler Drum Electronic Water Level Indicator EWLI Probe with Metaflex Gasket, Mounting Flange and Studs
Replacement of Water Wall Panel Tubes in Power Boiler 4 at Energy Mechanical in TNPL Unit I
SUPPLY OF SOOT BLOWER POPPET VALVE OF MODEL WB IE FOR UNIT I II and III BOILER
Residual Life Assessment Study for Chemical Recovery Boiler No.3 at SRP - Mechanical in TNPL Unit - I
Labour Contract For KCP Boiler Main Bank Tubes Damaged Length 2 Mtr Renewal Work With IBR Approved
Providing Smoke detectors in Energy Electrical area in Power boiler, Intake well, BR3 at TNPL Unit I
Construction of boiler shed with Mezzanine floor and allied structures at 60 MTPD Powder Plant Padalur Dairy
Full reconditioning of worn out coal nozzle tips released from Unit III Boiler during 2018-19 Overhaul