Loading…
Loading…
13,534 results • Best match
SM499140070: L Rods with pin for 2400/2000 mm Conveyor as per Drg. No. DGM/CON/MII/04/23
Fabrication Painting Supply and Erection of Stringer Channel Assembly for 1400mm Belt width Conveyor 16 at Coal Jetty I
Fabrication Supply and Erection of various structural materials for 13 spans of conveyor 19 gallery strengthening works at JT5E
Supply of MOTORIZED SECTOR GATE ASSEMBLY WITH LINEAR ACTUATOR FOR CONVEYOR 5A AND 5B AT JT-8 OF ICHS
Removal of reels from RAUMASTER and TRANCEL conveyor and shifting to New Godown through shuttle Trolley at marketing godown
ICHP- Attending preventive and breakdown maintenance of 10 Nos. electrically operated hoists on various locations of Station AB Conveyor
ECHP-I- Attending preventive maintenance works like cleaning, terminal tightness checking, greasing and meggering of HTLT conveyor drive motors.
ECHP-II- Upkeepment and attending breakdown and preventive maintenance works in Conveyor-48A/B, RBFD-1A/1B, 61,64,72 73
ECHP-II- Reconditioning and overhauling of SC-9 model scoop type fluid coupling released from Conveyor-68A B drives.
ECHP-II- Reconditioning of bend pulley by providing necessary shaft, end disc, hub, stiffeners and keys for Conveyor-68
Conveyor belt changing work in bagasse yard, HWFL and chipper house in Pulp mill - Mechanical in TNPL-Unit-I
Fabrication Painting Supply and Erection of Stringer Channel Assembly for 1400mm Belt width Conveyor 15 at Coal Jetty I
ICHP- Attending routine maintenance of Track rails of Conveyor-49 and 54 track path by clearing the sticked coal.
ICHP Attending preventive and breakdown maintenance of 10 Nos. electrically operated hoists on various locations of Station AB Conveyor
ICHS Dn Replacement of existing severely damaged Corroded Bottom Bend pulley and Top Bend pulley frame in Conveyor 9
Supply of Bypass chute assembly for scrapper conveyor feeders 4A1 4A2 5A2 and 5B2 in Unit IV and V
ICHP- Attending routine maintenance of Track rails of Conveyor-49 and 54 track path by clearing the sticked coal.
Providing Annual Maintenance Works for Bailing Machine, Conveyor Belts, Seiver Machine and Pulverizer Machine in Hosur City Municipal Corporation
Removal of reels from RAUMASTER and TRANCEL conveyor and shifting to New Godown through shuttle Trolley at marketing godown
Supply and Erection of SS 304 Gr Seal plates size 2150 1000 3mm for conveyor 48A return belt side
MTPS I CHP I Conveyor 7A and 7B Carrying out cleaning of spillage coal cleaning of all equipments etc
Fabrication Painting Supply and Erection of Stringer Channel Assembly for 1400mm Belt width Conveyor 15 at Coal Jetty I
MTPS I CHP I Replacement of worn out coal flow hitting plate with its arm and bed in conveyor
ICHP- Attending routine maintenance of Track rails of Conveyor-49 and 54 track path by clearing the sticked coal.
Fabrication and Supply of Sheave Pulley for take up counter weight for conveyor 69 70 71 72 and 61
MTPS I CHP I Replacement of existing worn out damaged discharge chutes of Belt feeder 6B to conveyor 7B
Plate size - 820 mm x 2500 mm x 16 mm - Hardox 400 or Equivalent Lignite Transport Conveyor bottom (Q3)
Steel Cord Conveyor Belt 1800mm ST 2250 with top cover 14 mm and bottom cover 10mm and detailed spec
SM499140052: Roller Fixing Knob for 2000/2400 mm conveyor frame as per drawing GM/CON/M-II/10/14
Providing roof and vertical cladding sheets in SRP burnt lime conveyor BC20 area at TNPL Unit 1 Phase I
Painting of old and new stacker conveyor structural in Bagasse yard at Pulp Mill-Mechanical in TNPL Unit-1
Scrapper bar with cleaning rubber and its related components for cleaning chain belt conveyor in bottom ash conveying system
NCTPS I M.II Circle ECHS Renovation of existing corroded damaged gallery structures at slope area of conveyor BCN 57
Supply of 1400mm Belt Width 800KNM, 5 Ply top 5mm, Bottom 3mm, Fire resistance, Nylon to Nylon Conveyor Belt
TTPS CMD 2 Dismantling the RCC supporting structures of unused conveyor 29B in the coal yard at ICHP area
Repair works to conveyor 72 RCC pedestals P29 to P35 near East side of JT 20A at ECHS area
Custom Bid for Services - Third Party Inspection (TPI) of conveyor belts Similar Category Hiring of Third-Party Inspection Agency
OPERATION AND MAINTENANCE CONTRACT FOR THE ENTIRE BOILER AND HYDROFLOW UNIT AT TRICHY DAIRY FOR THE PERIOD OF TWO YEARS 2024-26
MTPS I BM Unit III Boiler COH 2019 Overhauling of secondary air Dampers Scanner Air Fans and its damper flap gate etc
Procurement of Various Sizes of Tubes and Bends suitable for Unit - I and II 600 MW Boiler
REPAIRS TO LAUNDRY PLANTS, BOILER AND ALLIED WORKS AT MILITARY HOSPITAL AND OTA CHENNAI UNDER GE STM
Full reconditioning of worn out coal nozzle tips released from Unit I Boiler during 2017-18 overhaul
NCTPS I SE MI circle AOH 24 25 BM Dn Unit III Supply and Installation of AirSealants in Penthouse of Boiler during annual overhaul 2024 25 to avoid ash leakage air ingression to the boiler
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores
Unit V - Cleaning of I and II Pass Boiler structures, from 0 m. to 56 m elevation, PRDS floor, HWMP and BFP room, collection and devolution of scrap materials and disposal of fly ash, debris etc. from the date on or after 8.10.18 and upto 31.03.18
Facility Management Services - LumpSum Based - Industrial; O&M of Mechanical Work, Carrying out Eddy Current Testing of Heat Exchangers; Consumables to be provided by service provider (inclusive in contract cost)
Plate Heat Exchangers Emptying, disassembly, separation of Plates, cleaning , inspection of plates and gaskets, assembling and tightening to the required pack length and checking for satisfactory performance during Annual Overhauling
ESCircleTGMCA Division Inspectioncleaning and hydraulic testing of Turbine lube oil coolerBTDBFP AB Lube oil Coolers MDBFP Lube oil Working oil cooler ABVacuum Pump Heat exchangers EH oil coolers and replacement
TTPS Mech II BM Unit III Overhauling of load hangers of critical pipe lines headers of Boiler during the annual overhaul in 2019-2020
Raising the existing floor with RCC work in Northern side of Secondary Crusher House SCH Building I located at ICHS area inside NCTPS I premises