Loading…
Loading…
13,536 results • Best match
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit IV Boiler Pressure parts area to debris yard from the date of commencement
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores and disposal of fly ash debris etc from Unit V Boiler Pressure parts are
TTPS ES EM II Unit III Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning minor maintenance work of boiler side fan motors mill motors lub oil
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores and disposal of fly ash debris etc from Unit V Boiler Pressure parts
TTPS MechII BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler from the date of handing over of site on or after 20.07 2024 to 31 03 2025 or till the date of completion of entire quantity which ever comes earlier
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Water Washing of boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Re heater coil Overhauling of water wall soot blowers and LRSB
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores and disposal of fly ash debris etc from Unit IV Boiler Pressure parts a
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash, debris etc from Unit IV Boiler Pressure parts area to debris yard for a period fro
TTPS ES EM II Unit II Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning minor maintenance work of boiler side fan motors mill motors lub oil
TTPS ES EM II Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lub oil motor
Overhauling of Coal / oil burner and its tilting mechanism of Corner 1 and 2 in Unit V Boiler during the year 2018-19
Overhauling of Coal / oil burner and its tilting mechanism of Corner 3 and 4 in Unit-V Boiler during the year 2018-19
Metallic telescopic covers for X-axis front side along with wiper set as per drawing number MW/04/1131 ( Suitable for GORATU make CNC Axle Turning Lathe machine) Firm offered make: AMAC
Supply of SINUMERIK machine control panel MCP 483C MPI, width 19", Mechanical keys, 22 mm EMERGENCY OFF button, PART NO. 6FC5203-0AF22-0AA2, for CNC Vertical turret Lathe. Make: SIEMENS FIRM'S OFFER
Supply, installation and Prove out of New Telescopic covers (Steel) of 3mm thickness (min) for LH side and RH side suitable for CNC Axle Turning Lathe. Compressed length - 495mm (max), Expanded lengt
TNPGCL NCTPS I SE M II Circle ICHS Dn Replacement of existing severely damaged corroded Technological Structure in conveyor 9 of ICHS
MTPS I CHP I Cleaning of spilled coal from Conveyor 1to4 Belt Feeder floor 1to4 and inspection rectification of coal transfer chutes
Supply and Erection of seal plates SS 304 gr 3 mm thick for conveyor 48 B1 return belt side at SCH II
MTPS I CHP II Carrying out fabrication and cold vulcanizing of joint and patch vulcanizing in 1400mm and 1800mm width conveyor belts
ICHP Removal of carbon dust deposition in electrical components such as light fittings MCBLDB Junction boxes in Station A B Conveyor System.
ECHP-I- Attending preventive mechanical maintenance and monitoring works in Conveyor-17 and related equipments for the period from 01.10.2026 to 31.03.2027
MTPS I CHP I Removal of worn out pulleys Replacement of bearings sleeves and plummer blocks Erection of new pulley in conveyor
ICHP- Racking in and out of H.T Breakers LT modules recording of various parameters of running conveyor equipments etc., in CHS-V
MTPS I CHP I Fabrication and erection of conveyor 8A1 and 8B1 skirt board top cover plate and its manual inspection door
ECHP-I- Operation of electromagnet CBMS in Conveyor-17 head end and removal metal pieces picked by the magnet under works contract
Supply, Installation, Testing and Commissioning of additional 425 kg filling unit, Valve unscrewing machine, Conveyor section and its accessories at Coimbatore BP
ECHS Dn Shot Blasting and Epoxy painting of conveyor structure of BCN 59 with three coats Epoxy paint including supply of paints
Supply of Fixed type Return idler frames suitable for 2000mm belt width steel cord conveyor for BCN 54, 55, 56 and 57
ECHP-II- Upkeepement, attending breakdown and preventive maintenance and monitoring works in Conveyor-69,70 and 71 and related equipments and monitoring works.
ICHS Dn Renewal of severely Corroded weaken ladder bracings and Strengthening of Trestle Tr No 7 Column of Conveyor 12 A B
ECHP-I- Attending preventive mechanical maintenance and monitoring works in Conveyor-17 and related equipments for the period from 01.04.2026 to 30.09.2026
Supply and Erection of seal plates SS 304 gr 3 mm thick for conveyor 48 A1 return belt side at SCH II
ECHP-II- Routine cleaning, checking and monitoring the mechanical equipments round the clock of Conveyor-48A, 48B, RBFD-1A 1B, 61 64
ECHPI Racking in and racking out of HT Breakers and LT modules recording of various parameters of running conveyor equipments at SSIII.
NCTPSI SEMII Circle ECHS Dn Strengthening of existing severely damaged or corroded boom conveyor structures MCC room and operator cabin in Reclaimer1B
TNPGCL NCTPS I SE M II Circle ICHS Dn Replacement of existing severely damaged corroded Technological Structure in conveyor 7 of ICHS
Supply of Supply of By pass chute assembly for Scrapper Conveyor Feeders 4B1 4B2 5A1 and 5B1 in Unit IV and V
SUPPLY OF VARIOUS SIZE BEARINGS FOR HT AND LT MOTORS OF ECHP-I CONVEYOR MOTORS AND SS III STORM WATER PUMP MOTORS
Dismantling, fabrication and erection of corroded structurals of Reclaim conveyor#23B, 26B, 23C and 23A in Bagasse yard at TNPL Unit 1
MTPS I CHPII Replacement of worn-out SS liner plates in conveyor 10A 10B 11A and 11B tail end BFD 9A 9B
ECHP-II- Routine cleaning, checking and monitoring the mechanical equipments round the clock of Conveyor-48A, 48B, RBFD-1A 1B, 61 64
MTPS I CHP I Attending cleaning works in conveyor 5 to 8B1 HT and LT motors cable cable trays transformers 2A 2B
ECHS Dn Shot Blasting and Epoxy painting of Conveyor Structure of BCN 55 with three coats Epoxy paint including supply of paints
Improvement works to Junction Tower - 20 A and Providing approach road to Conveyor 72 Drive Floor JT - 20 A at ECHS area
ECHP-I- Replacement of 580 mtrs. Length worn out belt by a second hand belt of 1400mm width belt in Conveyor-19
Supply and delivery of 5 HP shredder machines with conveyor (6m length) at pullakottai road,railway feeder road MCC in virudhunagar municipality
ICHP- Replacing the worn out chequered plate with new chequered plate in Conveyor-27A take up pulley floor size 12m x 8m
Custom Bid for Services - Providing precast slabs for cable trench and replacing conveyor roofing sheets at NTPL plant Similar Category Support Services
Custom Bid for Services - Assistance in Running of NTECL Pipe Conveyor 2026-2028 Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Refractory application works in Re suction ducts and PF Burners Oil Burners inside Furnace in Boilers of all the Seven Units of TPSII Similar Category Repair and Overhauling Service