Supply of Finned Economizer coil J bend of size 44.5 x 4.5mm Material SA 210 Gr A1 Radius 180 Pitch 228 mm for unit III Boiler
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends fittings between Mills D E F and Boiler during the forthcoming overhaul
TTPS Operation Circle MPM I Unit IIIReplacement of eroded Coal pipe lines, bends fittings between Mills A, B C and Boiler during 2021-2022 Annual overhaul
Design, Manufacturing, Testing, Supply, Supervision of Erection and Commissioning of Distributed Control System and its accessories for Boiler 8 of RSPS2 Project at TNPL UNIT I
TTPS Operation Circle MPM I Unit III Replacement of eroded Coal pipe lines, bends fittings between Mills D, E F and Boiler during the forthcoming overhaul
Removal of chocking in the catch pits in the Mill and Boiler areas and clearing the drains around the Power House of Units 4 and 5
MTPS I BM Unit II Boiler pressure parts COH 2024 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
TTPS Mech II BM Unit II Replacement of wornout corroded structural supports strengthening of weld joints and painting the steel structures of Unit II Boiler roof
TTPS Mech II BM Unit IV V Cleaning of Boiler IV V Zero meter area for the period from 01 04 2024 to 31 03 2025
MTPS I BM Unit IV Boiler AOH 2020 21 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes etc
Supply of Galvalume Sheets of thickness not less than 0.8mm conforming to IS14246 for coverage in 18Mtr elevation OHS and 32Mtr elevation of Unit-I Boiler
SUPPLY OF FINNED ECONOMIZER COIL J BEND OF SIZE 44.5 X 4.5MM MATERIAL SA 210 GR A1 RADIUS 180O PITCH 228 MM FOR UNIT I BOILER
CONSTRUCTION OF EB,IRS,BOILER,WOOD STORAGE YARD, WATER SOFTENER PLANT, WEIGH BRIDGE AND ADDITIONAL CIVIL WORKS FOR 1 LLPD CAPACITY DAIRY PLANT THANJAVUR, THANJAVUR DISTRICT.
TTPS Mech II BM Unit V Replacement of eroded Economizer upper and lower banks in Unit V boiler during the overhaul for the year 2024 2025
Supply and erection of Spool piece for Ceramic Pipe and Connecting piece for Spool Piece in Boiler burner assembly 2 Items as per the drawing enclosed
Replacement of coal transport pipelines 4 way junction piece, coal mixing nozzles and seal welding of cracks in Coal Chute of Boiler #5 at Energy Mechanical
TTPS Mech II BM Unit I II III Strengthening of stub joints in Hot reheater header in pent house area of Unit I II III Boiler
TTPS Mech II BM Unit V Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Boiler during the year 2021 2022
TTPS Mech II TM II Unit V Overhauling of Boiler Feed Pump and Deaerator system in Unit V during the overhaul for the year 2019 20
TTPS Mech II BM Unit V Overhauling of wind box SADC AC DC scanner fans of Unit V Boiler during overhaul for the year 2025 2026
TTPS MechII BM Unit I Cutting grinding and rewelding of Hot reheater coil dissimilar weld joints in Unit I Boiler during overhaul for the year 20242025
TTPS ES Circle Instn II Painting of UCB Control Panels BTH enclosures in Boiler Fan Mill Areas BFP area CWP area and Actuators in Units V
MTPS I BM Unit II Boiler pressure parts AOH 2022 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
TTPS Mech II TM II Unit IV Renewal of Boiler feed pump cartridge assembly Model FK 6D 30 in BFP 4B including alignment and allied works
TTPS Operation Circle MPM I Unit III Replacement of eroded Coal pipe lines, bends fittings between Mills A, B C and Boiler during the forthcoming overhaul
MTPS I BM Unit III Boiler pressure parts AOH 2024 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
TTPS Mech II BM Unit I III Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2021 2022
TTPS Mech II BM Unit IV V Reconditioning of PRDS pressure control valve and CBD control valve in Unit IV V Boiler during 2024 2025 overhaul
TTPS MechII BM Unit V Overhauling of Coaloil burner and its tilting mechanism of Corner 1 2 in Unit V Boiler during the year 2024 2025
TTPS MechII BM Unit I Overhauling of Coaloil burner and its tilting mechanism of corner 3 4 in Unit I Boiler during the year 2024 2025
TTPS Mech II BM Matching of new coal nozzles with coal nozzle tips available at store to use in Unit I Boiler during 2025 2026 overhaul
NCTPS I ES Circle EM II Division S Dn I Repair Rewinding of 4 Nos of various capacities of LT motors in Boiler auxiliaries sub division
MTPS I BM Unit IV Boiler pressure parts AOH 2024 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
TTPS Mech II BM Unit IV Overhauling of wind box SADC AC DC scanner fans of Unit IV Boiler during overhaul for the year 2024 2025
MTPS I BM Unit I Boiler pressure parts AOH 2021 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I BM Unit I Boiler pressure parts AOH 2024 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
TTPS Mech II BM Unit IV Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Boiler during the year 2021 2022
SUPPLY OF FINNED ECONOMIZER COIL J BEND OF SIZE 44.5 x 4.5mm MATERIAL SA 210 GR A1 RADIUS 180degree PITCH 228 MM FOR UNIT II BOILER
MTPS I BM Unit II Boiler pressure parts COH 2024 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
TTPS Mech II TM II Reconditioning of Booster pump casing parting plane and Overhauling of Boiler feed booster pump assembly BHEL make Model FA 1B 56
MTPS I BM Unit I Boiler AOH 2026 Reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
MTPS I BM DM Plant Unit I to IV AOH COH 2026 Overhauling of Hot well makeup pumps 8 Nos and Boiler fill pump 4 Nos
MTPS I BM Unit I Boiler pressure parts AOH 2025 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Removal of chocking in the catch pits in the Mill and Boiler areas and clearing the drains around the Power House of Units 4 and 5
MTPS I BM Unit II Boiler pressure parts AOH 2025 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and allied works
MTPS I BM Unit II Boiler pressure parts AOH 2025 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I BM Unit III Boiler pressure parts AOH 2025 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPSI TM Stage I Unit I and II Replacement of existing Boiler Feed Pump Cartridge by a spare cartridge in BFP 1A and 2A and commissioning
SUPPLY OF M S FLOOR GRILLS OF VARIOUS SIZES AS PER DRAWING FOR UNIT IV and V BOILER AREA WITH ONE COAT OF RED OXIDE PAINT
MTPS I BM Unit III Boiler pressure parts AOH 2025 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and allied works