Loading…
Loading…
13,554 results • Best match
MTPS I TM Unit I and Unit II Preventive Breakdown maintenance works and Repairing works of Air Compressors Make KG Khosla Model No 2HA2QT and Air Dryers Make Khosle on as ans when required basis for a period of 120 days in the year 2021 20
ECHP-I- Fabrication and machining of guide roller for rack and pinion gate in Vibrex Screen C bypass gate and removal of bend in cage bars released from Secondary Crushers and kept as common spare for Secondary Crusher A, B C at SCH-I
Fault attending in Boiler auxiliaries motors valve motors soot blower motors and preventive maintenance of Ash Silo Transformer A and B of Unit IV and V period from 08.10.18 to 31.03.19.
Annual service maintenance for 1 No Freight Cum Passenger Lift at boiler area in Unit V Make VOLTOS Capacity 1360 Kgs Sl No LM2681 for the period from 01.04.2019 to 31.03.2020
Conveyor Belt 1400 mm Width 800 Mtrs
Conveyor Belt 1800 mm Width 200 Mtrs
Removal of existing compressor in borewell and providing 7.5 HP submersible motor pumpset, Delta starter, UPVC pipes and cables at Sirupooluvapatti Aadhidravidar colony, Sirupooluvapatti and solipalayam in ward no 25
ICHS Dn Design Engineering Supply fabrication and erection of additional trestle with bracings of 6B1 with pile foundation for supporting the existing severely corroded weaken Trestle No 6A of conveyor 12 A B on emergency basis
Supply and Erection of 1400 mm belt width 5ply 5 by 3 mm 800KN per m Nylon Nylon Conveyor Belt for SFD 1A and 1B at PCH II and SFD 2A and 2B at SCH II
ICHS Dn Design Engineering Supply fabrication and erection of additional trestle with bracings of 6B2 with pile foundation for supporting the existing severely corroded weaken Trestle No 6A of conveyor 12 A B on emergency basis
ECHP-I-Attending breakdown and preventive maintenance works such as replacement of wornout conveyor belt, gear coupling in belt feeder shuttle feeder RBFD 20,21,BFD 22,23 SFD 4A,4B,5A,5B and 5C at SCH-I
Improvement works to the JT 2E building in the Coal Handling Conveyor System of TTPS by Strengthening the column beam and other allied Civil works in Red Gate North Break Water area VOC Port at ECHS
ECHP-II- Dismantling of Hoist travel I Beam and providing new I Beam 37.5 mtrs. and providing new extension side support structures 12 mtrs. length I Beam and providing column concrete pedestal at Conveyor-69 70
Green PVC Fabric bottom 5mm Thick, width 1500 mm, Length 11000 mm Flat endless conveyor Belt.. 1. To be suitable for handling cut to size steel sheets for cut to length line machine. 2. Hot vulcanized
MTPS II O AHS BAHS Complete Reconditioning of High profile Band Elements of Materials SA 387 Gr 12 30 Nos for DRYCON conveyor system in Bottom ash Handling System during Annual Overhaul period of 2019 2020
TTPS Operation Circle O and E II FPS Extension and Erection of 150NB M.S fire hydrant pipelines for a length of 450 mtrs with providing 15 Nos New fire hydrant landing valves along the conveyor 54.
Blowing cycle operation of Soot blowers and maintenance of Junction Boxes field equipments of FSSS and Boiler auxiliary systems in Unit IV and V period from 08.10.18 to 31.03.19.
Desilting, Removal of Water weeds and floating materials in Thirupporur Chekkadithangal and Amur Supply Channel by using poclain machinery, Tippers and Labourers in Thirupporur Taluk of Chengalpattu District.
Desilting, Removal of Water weeds and floating materials in Thaiyur Surplus Course and Manjalnner Odai by using poclain machinery, Tippers and Labourers in Thirupporur Taluk of Chengalpattu District.
Desilting, Removal of Water weeds and floating materials in Kondangi Surplus Course upto Kottamedu Maduvu by using poclain machinery, Tippers and Labourers in Thirupporur Taluk of Chengalpattu District.
Stationary Compressor Coupling, Service charges for installation, Sand Filter, Sand Filter frontal pipe line modification with new multi port valves, Filters multi port valve, carbon filter, carbon filter frontal pipe line modification with new multi port valves, RO Plant membranes inlet max 700ppm, Ro plant electrical panel, Ro plant Pipe Line Modification, Ro Plant new pressure gauge, Ro Plant Conductivity meter, New anti scalant dosing system pump and tank, Service and other charges for installation, aluminum pipe dia 24mm and 6m length, pipe to pipe connector dia 25, Equal Elbow dia 25, Equal tee dia 25, Quick Plug Valve dia 25, Quick Plug Valve dia 25 x 20mm, Equal Elbow dia 20, Aluminum Pipe dia 20mm and 6m length, Male nipple socket dia 20 x one by half, 2way QRC dia one by half, End Cap dia 25mm, Pipe Cap 25mm, Pipe clip 20mm, Brass Ball Valve one by half, Pipe Support and Other accessories Bid Number : GEM/2025/B/7001746 Dated : 02-01-2026 Bid Document 1/31
Goods Transport Service – Per Trip based Service - Machinery & Equipment; PUT RATES AS PER SOW MENTIONED IN NIT FOR 20FT TRAILERS; PUT RATES AS PER SOW MENTIONED IN NIT FOR 20FT TRAILERS, Goods Transport Service – Per Trip based Service - Machinery & ... - Machinery & ...
Facility Management Services - LumpSum Based - Industrial; Wall thickness Measurement of primary and Secondary system Pipe Pipe fittings Feeder Elbows and Non Nuclear pressure Vessels Boiler Hairpins by Ultrasonic technique at Madras Atomic Power Sta..
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator system in Units IV V for the period of work on or after 08 10 2020 and upto 31 03 2021
DESIGN SUPPLY DISMANTLING ERECTION TESTING AND COMMISSIONING OF CONSTANT LOAD HANGERS ASSEMBLY CLH 2257 193 MODEL INCLUSIVE OF TIE RODS AND TURN BUCKLES FOR CRITICAL STEAM PIPE LINES IN UNIT IV and V BOILER
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator systems in Units IV V for the period of work on or after 08 10 22 and upto 31 03 23
MTPS I BM Boiler Statutory Inspection 2022 23 Unit I APH A Checking of rotor level sector plate level and axial seal plate alignment Water washing of cold end baskets and other related works
NCTPS I ES Circle C I Division SDn IV FSSS Carrying out maintenance activities of FSSS SADC Equipments Boiler Mill Plant allied areas of Unit 1 2 3 for a period of 360 days
TTPS Mech II BM Unit I Dismantling the existing seal plates and re erection after rectification works in BAH and overhauling of boiler fill pumps and hot well makeup pumps during 2023 2024 overhaul
Procurement of Various sizes of Protection shield made of Corten steel for Round Corner Metallic Expansion Joint of Boiler Flue Gas Ducts between Air Pre heater outlet and ESP inlet Style I and II
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator system in Units IV V for the period of work on or after 08 04 2020 and upto 30 09 2020
Annual Maintenance of HT Motors of Boiler Feed Pump A B C Main Condensate Pump A B C and Starting Oil Pump in Unit III during the Annual overhauling for the year 2021 22
MTPS I BM Unit III Boiler pressure parts AOH 2023 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
MTPS I BM Boiler Statutory Inspection 2020 2021 Unit III APH A Checking of rotor level sector plate level and axial seal plate alignment Water washing of cold end baskets and other related works
MTPS I BM Unit IV Boiler pressure parts AOH 2023 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
MTPS I BM UNIT II Boiler pressure parts AOH 2025 Inspection Replacement of worn out pipe lines bends and Flanges of LRSB lines and Removal of insulation and refixing over LRSB line pipes etc
TTPS Mech II BM Unit IV Seat cutting of direct spring loaded safety valves of 210MW boiler Drum safety valves and super heater safety valve and PRDS safety valves during annual overhaul 2021 2022
TTPS Mech II BM Unit IV V Boiler Breakdown maintenance works in Burner and H O Guns for the period from the date on or after 08 10 2019 and upto 31 03 2020
TTPS ES Circle EM III Fabrication and erection of M S welding supply distribution box and providing of 55 numbers single phase plug point enclosure with socket etc in Boiler areas of Unit 4
TTPS ES Circle EM III Load Testing of 2 Nos Freight Cum Passenger Lift available in Unit 4 and 5 boiler area Make VOLTAS Capacity 1360 kgs Sl No LM 2681 and LM 2682
TTPS Mech II BM Unit V Seat cutting of direct spring loaded safety valves of 210MW boiler Drum safety valves and super heater safety valve and PRDS safety valves during annual overhaul 2023 2024
MTPS I BM Boiler Statutory Inspection 2020 2021 Unit I APH A Checking of rotor level sector plate level and axial seal plate alignment Water washing of cold end baskets and other related works
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
MTPS I BM Unit III Boiler pressure parts AOH 2024 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 and 2 during annual overhaul for the year 2021-2022
TTPS ES Circle EM III Load testing of 2 Nos 15 Tonne capacity wire rope Electric Hoists at ID Fan 4A and 4B and 5A and 5B of Unit IV and V Boiler area
MTPS I BM Unit I Boiler pressure parts AOH 2024 Overhauling of Secondary Air dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
MTPS I BM Unit II Boiler Pressure parts AOH 2022 Reconditioning and Hard facing of used and Worn out square coal nozzle tips including SS310 plates and checking of deformation and matching with nozzle
NCTPS I ES Circle C I Division SDn IV FSSS Carrying out maintenance work in FSSS SADC Equipments Boiler Mill Plant allied areas of Unit 1 2 3 for a period of 180 days
MTPS I BM Unit IV Boiler Pressure parts AOH 2024 Reconditioning and Hard facing of used and Worn out square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle