Loading…
Loading…
13,519 results • Best match
SM499130042: Return Idler Garland for 2000mm conveyors consisting of 2 nos. of Idlers as per s. no. 4
MTPS I BM Pressure parts Units III and IV Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works for the period of 120 days from the date of
PROCUREMENT OF CHAIN FOR COAL FEEDER - BOILER 7 ON F.O.R. KAGITHAPURAM BASIS
Custom Bid for Services - Area cleaning works in conveyors 14, 18, 20 & Drive head of 7, 14 in LHS of TPS II Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Round the clock operation and maintenance of ETV/CONVEYOR/ASRS
BELT CONVEYOR PREVENTIVE MAINTENANCE WORK AT TNPL UNIT- II, TRICHY.
MTPS I BM Unit IV Boiler Pressure Parts AOH 2020 21 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Maintenance of boiler drum and all safety valves and allied works
MTPS I BM Unit IV Boiler Pressure parts AOH 2020 21 Maintenance of boiler drum and all safety valves and allied works
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Cleaning of boiler structures from 0 to 52 m Level etc
NCTPS II 2X 600 MW BM Division Unit II Boiler Providing cup lock metallic scaffolding arrangements inside the Boiler furnace from 11
TTPS Mech II BM Unit II Replacement of eroded boiler pressure parts tubes bends in I II pass of Unit II Boiler
NCTPS II 2 X 600 MW MI Circle BM Division 600MW Unit II Boiler Rectification of defective tubes in boiler inter pass
TTPS Mech II BM Unit III Replacement of eroded boiler pressure parts tubes bends in I II pass of Unit III Boiler
MTPS I BM Unit I Boiler Pressure parts AOH 2026 27 Maintenance of boiler drum and all safety valves and allied works
Supply of Painting compressor
BELT CONVEYOR DISCHARGE CHUTE WORK AT TNPL UNIT - II
Procurement of Nylon Nylon Conveyor Belt Capacity 1600 KNMtr
SUPPLY AND ERECTION OF PRIMARY CRUSHER 1A RECEIVING CHUTE TOP PORTION AT PCH I
Supply and Erection of Primary Crusher 1A receiving chute Top portion at PCH I
SUPPLY AND ERECTION OF PRIMARY CRUSHER 1A RECEIVING CHUTE BOTTOM PORTION AT PCH I
Supply and Erection of Primary Crusher 1A receiving chute Bottom portion at PCH I
Supply and Erection of Primary Crusher 1B receiving chute bottom portion at PCH I
SUPPLY OF TOOTHED RING HAMMERS SUITABLE FOR SECONDARY CRUSHERS AT SECONDARY CRUSHER HOUSE II
Supply and Installation of Jaw Crusher for Strip Cast Nd-Fe-B Alloy Chips
Supply and Erection of Primary Crusher 1B Receiving Chute Top portion at PCH I
REPAIRING AND SERVICING OF BIO WASTE CRUSHER SHREDDING MACHINE AT GEORGE ROAD COMPOST YARD
MTPS I BM Unit II Boiler Pressure parts Statutory Inspection 2023 Water washing of boiler Ist and IInd pass area Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
MTPS I BM Pressure parts Unit I Boiler Statutory inspection 2022 Water washing of boiler Ist and IInd pass area Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
MTPS I BM Pressure parts Unit I Boiler Statutory inspection 2020 Water washing of boiler Ist and IInd pass area, Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
Approval granted for the waiver of MII purchase preference Competent Authority Approval for not opting Make In India Preference : View Document Intercooler Bundle For ZR90 Compressors, Aftercooler Bundle For ZR90 Compressors, Aftercooler Bundle For ... ZR275 Compressors
Reciprocating Air Compressors - Electric Motor Driven (Q2), High Pressure Washer (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Manpower Outsourcing Services - Man-days based - Machining assistance; Skilled; Lathe operator skilled, Manpower Outsourcing Services - Man-days based - Assistance for machining; Unskilled; Mechanic - Machines
Replacing the existing dirty oil HP Parthon 460 1360 lit and slag from Mill gearbox sump Inspection of gearbox internals and Renewal of new gear box oil for 2 Nos of coal mills during the AOH 2024 25
MTPS I BM Unit II Boiler pressure parts AOH 2019 Rectification Replacement of defective boiler tubes in water wall area steam cooled wall tubes and inter pass area fin welding etc
PROVIDING BOILER FIELD OPERATORS AT TNPL UNIT - II, TRICHY.
AHP Dn Unit I II III Outsourcing of Operation and Maintenance of PDFAC System consists of PLC Switch gear panels modules breakers Fly ash conveying Instrument compressors Intermediate conveying and Instrument compressors and Auxiliaries PDFACS equip
AHP Dn Unit I II III Outsourcing of Operation and Maintenance of PDFAC System consists of PLC Switch gear panels modules breakers Fly ash conveying Instrument compressors Intermediate conveying and Instrument compressors and Auxiliaries PDFACS equip
Attemperator-1 (Desuperheating) control valve for 110ATA Boiler Tag 18TV158, Attemperator-2 (Desuperheating) control valve for 110ATA Boiler, Tag: 18TV162
White Cotton Full Sleeve Boiler Suit, Size: XL, Size: L, Size: M
Overhauling of mill reject system top bottom gate complete assembly renewal of worn out parts overhauling of screw conveyor gear box with screw conveyor complete assembly reconditioning of damaged screw conveyor shaft renewal of plummer block bearin
Service of Machinery Items for Civil Department
REPLACEMENT OF BOILER AIR PRE HEATER CASING
Annual overhaul of Drycon conveyor its hydraulic operating system its moving parts and connected components during Annual overhauling 2025 26
TTPS ECHP II Clearing of spillage coal on the jetty floors hopper walkways bollard area rails around hoppers conveyor 65 bottom from tail end up to CBMS of Conveyor 65 by collecting and loading the coal on the conveyor belt
ECHP-II- Attending Breakdown and Preventive mechanical maintenance of Primary Crusher-2A 2B, BFD - 2A 2B, BFD -3A 3B, SFD-1A 1B RC - 2A, 2B, 2C and related equipments in Primary Crusher House-II
ECHP-II- Attending Breakdown and Preventive mechanical maintenance of Primary Crusher-2A 2B, BFD - 2A 2B, BFD -3A 3B, SFD-1A 1B RC - 2A, 2B, 2C and related equipments in Primary Crusher House-II
Oil Machinery/General Purpose Machinery Oil Vg - 32 and Vg - 100 as per IS 493 (Q2)
Oil Machinery/General Purpose Machinery Oil Vg - 32 and Vg - 100 as per IS 493 (Q2)
ECHP-II-Attending Electrical maintenance in CHS V and Preventive electrical maintenance of conveyor 48A,B, RBFD 1A, 1B, 61, 64, 73, and Conveyor 72