Loading…
Loading…
13,524 results • Best match
COMPRESSOR AUXILIARY TO CLW SPECN. CLW/ES/C-4/F or Latest. Accepted description:Auxiliary Compressor (Without Base Platform) as per CLW Specification: CLW/ES/C-4/F. Make: CEC
OIL SEAL TYPE-1 45*60*8 ELGI PART NO 1LAN005700 FOR 1600 HP DEMU SPARE PART COMPRESSOR FAN MOTOR MODEL NO EC 160X(COMPRESSOR MODEL NO RR 15070)
Oil Pumping and Heating (OPH) unit for 2 TPH capacity boiler as per specification
NCTPS.II 2X600 MW BM Unit II rectification of defective tubes in Boiler second pass
procurement of Spares for coal compartment assembly and oil gun assembly of 600MW Boiler
Boiler Peep hole door, Reach rod with pin LTSH coil terminal tube alignment band
Supply of Various sizes of High Pressure Valves for Unit IV and V Boiler
SUPPLY OF GUIDE PIPE and DIFFUSER ASSEMBLY FOR OIL GUN IN UNIT V BOILER
NCTPS II 2 X 600 MW BM Unit I Annual overhauling of Boiler Drum
DISMANTLING AND ERECTION OF ECONOMISER COIL ASSEMBLY I AND II FOR BOILER I - (T4133)
Miscellaneous civil maintenance work in Power Boiler and WTP area at TNPL Unit I
SPARES FOR BOILER FEED PUMP TYPE 6WC 137/C - SHAFT WITH KEYS & NUTS (Q3)
Insulation work for Boiler#5 to 7 in Energy Mechanical at TNPL Unit-1
Startup Vent silencer drain line providing work in Boiler 6 at TNPL Unit I
SUPPLY OF PHOSPHATE DOZING PUMP FOR UNIT IV BOILER AS PER THE TECHNICAL SPECIFICATION
BFP Shaft 70mm dia with keys suitable for Boiler feed pump of Model FK6D30
Conducting Tube Thickness survey at various Elevation in Power Boiler 7 at Energy department.
supply of skin casing sheet of thisckness 3.15mm for unit I and II boiler
SUPPLY OF GUIDE PIPE and DIFFUSER ASSEMBLY FOR OIL GUN IN UNIT IV BOILER
Contract for providing 2 nos of certified manpower for operation and maintenance of boiler
NCTPS II 2X 600 MW BM Division Unit II Boiler Providing cup lock metallic
NCTPS II MI Circle 600 MW Unit II Boiler Conducting corrosion mapping using EMAT
SUPPLY OF INTERMEDIATE OIL NOZZLE TIP SUITABLE FOR UNIT I II and III BOILER
Cleaning of accumulated Ash inside pent house and water washing inside boiler 2nd pass
Providing scaffolding inside recovery Boiler 2 for conducting tube thickness survey at SRP - Mechanical
Providing Scaffolding for Boiler No.4 furnace roof tube repair works in Energy Mechanical
Dismantling, Fabrication and Erection of Pith Feeding System chute inside furnace in Boiler 5
SUPPLY OF SHROUDS FOR WATER WALL SCREEN TUBES OF UNIT IV and V BOILER
SUPPLY OF VARIOUS SIZES OF EROSION PROTECTION SHIELDS CASSETTE BAFFLES FOR UNIT III BOILER
Removing of Bed Ash generated in Power Boiler#4,5, 6 at Energy Dept - Process
REPLACEMENT OF PRESSURE SAFETY VALVES AND GAUGE GLASSES IN 110 ATA AND PC BOILER
Sale of Used diesel fired boiler from TNPL Unit 1 on One time sale
supply of high pressure tubes for front reheater coil tubes suitable for 600MW boiler
supply of various sizes of boiler pipes,expansion loop bends and 90 deg bends
SUPPLY OF SKIN CASING SHEET OF THICKNESS 3.15MM FOR UNIT I and II BOILER
supply of burner coal compartment inner and outer side cover plates for 600MW Boiler
Application of Castable Refractory and Plastic Refractory in Boiler #4,5,6 and 7 Furnace area.
NCTPS II MI Circle M I Circle BM Division Unit I attending Boiler tube
28inch Coal Nozzle tip of tilting and tangential firing burner suitable for 600MW Boiler
Supply of Skin Casing sheet of thickness 3 15 mm for Unit I Boiler
Conducting tube thickness survey in Recovery Boiler 2 at various elevations at SRP Mechanical
Insulation of pipelines for Recovery Boiler#3 and New Evaporator use at SRP-Mechanical
SUPPLY OF LOUVER DAMPER ASSEMBLY AND ITS ACCESSORIES FOR SADC FOR 210 MW BOILER
Contract for providing 4 nos of certified manpower for operation and maintenance of Boiler
Repairing and Renovating RCC structures in Boiler and TG areas at TNPL Unit I
NCTPS II MI Circle BM Division Unit I Boiler 600 MW Providing platform in
Supply of Coupling membrane pack for High Pressure boiler feed Pump at KGTPS Maruthur.
Complete Mechanical Seal Assembly for Boiler Feed Booster Pump Model No FA1B56 Weir Design
NCTPS II MI Circle BM Division Unit I 600MW Overhauling of Boiler Main Steam
Patch-up work in coal transport pipeline in Boiler 7 at Energy Mechanical Dept