Loading…
Loading…
5,544 results • Best match
Annual Maintenance (Desilting) of Major Nalas by Machinery under Mallepally division -147, Masabtank Circle-34, GZ, GHMC for the year 2026-27. (Item No.2) 2nd RECALL
Engaging of Vehicles and Machinery in view of CURE 99 Days Action Plan Programme period of 9 Days in Saroornagar Circle-12, LB Nagar Zone, MMC(Recall).
BTPS-CHP-Removal of spilled over coal, fine dust and wet coal of BCN-3A/B tunnel, FG-5 and 6 floor at TP-2, ground portal, gallery and head end areas and contigency-1 and 2 area of 3A/B including FG floors and reclaim belt conveyor and reclaim chain ... running conveyor feeders ...
Refrigerator, Frost Free, Double Door, 310 Litres Capacity, 230 V AC, 50 Hz, Stabilizer Free Operation (100-300 V)AC, Digital Inverter Compressor, Toughened Glass Shelves, 2 star rating or more, with dimensions width-60cm,depth-70cm,height-166cm (tolerances :minus-2cm), suitable for fitment in LHB Hot buffet cars conforming to RCF Specification No. EDTS-118 (latest revision/amendment), positive tolerances in dimensions not accepted and complete with all standard accessories.Makes: M/s.Samsung,LG as per RCF specificatin no.EDTS-118.
Supply Delivery and installation of Electronic Weigh Bridge Sorting Conveyor belt Bailing machine Garden shredder Medium duty twin shaft shredder Air Blower for Solid waste Management in Luxettipet Municipality under SBM U 2 Fund 15th FC Tied Grant
BTPS - CHP - Clearing of chute jams from BCN-1A/1B conveyor to bunker floor required in Operation and Electrical division of CHP/BTPS for a period of 03Months from 01.07.2026 or from actual date of commencement of work.
Goods Transport Service – Per Trip based Service - Forged rods, Empty Drums of 210 ltrs Capacity and other machinery; Open body truck; 7 MT capacity X 18 feet length
1000 ton capacity hydraulic press MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Annual Maintenance Charges Required Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Stage-wise Inspection Name of the Empanelled Inspection Agency/Authority DRDO Quality Assurance Plan document 1721885310.pdf Bid Number ( ) : GEM/2024/B/5203602 Dated : 01-08-2024 Bid Document 1/9 Evaluation Method Total value wise evaluation Financial Document Required Yes Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 540000 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Director Defence Metallurgical Research Laboratory, POST: KANCHANBAG HYDERABAD - 500058. (The Director, Dmrl) Splitting
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2024 BP Gandugulapalli package.no.VIII of Sathupally Division
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2023 Buggapadu A & 2023 Aswaraopeta CMA Sathupally Division Pk.no.I
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas, Medak Division 2023 Gollur (1998 EP), Package no.III.
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2023 EP Satyampeta at Paloncha Division
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 Nagaram Bit I (Old 1999 EP)
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2024 BP Vedanthapur Package no: XI in Sathupalli Division.
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 EP MC Pally
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2023 LGM Pet (Package - 3)
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas at 2023 Muduchintalapally in RR Division (package No.1)
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area in 2023 EP Subbanapally Paloncha Division Pk.no.I
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas, in 2023 EP Chowtkur, Package no.I, MEDAK DIVISION.
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas, in 2023 Chowtkur, Package no.II, MEDAK DIVISION
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2023 EP Wodduramaram at Paloncha Division
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2024 EP Mulakalapally Package.no.VI of Paloncha Division
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 Nagaram Bit II (Old 2000 EP)
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 EP Gajwel Bit II
Clear Felling Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 EP Gajwel Bit I
Assets Insurance Service - Contractors All Risk (CAR); Property Damage Cover, Standard Fire & Special Perils Cover, Storm, Typhoon, Hurricane, Tornado, Flood and Inundation (STFI) Cover, Earthquake Cover, Theft/Burglary Cover, MBD (Machinery ... ( Machinery breakdown) ...
Engaging of machinery and vehicles to streamline the nala and formation of road along the bund at Rajiv Gandhi Nagar in Allapur ward 116, Moosapet Circle-23, KPZ, GHMC
Annual Desilting of Minor SW Drains (Machinery and Manual) for the year 2026 at various locations in Ward Nos.29-Nagole and 46-GSI of Nagole Circle-11, GHMC.
Hiring of various Machinery and Heavy Vehicles for Unit Rate Contract for a period of one year for the O/o Commissioner, HYDRAA (Empanelment) (Recall for only JCB Loadall).
Floor Finishing Works at 35mtrs, 82mtrs, and Bal works of Scrap Chute and interconnection Floor,stairs of APH and Boiler above 30mtrs - LHS RHS, Torquing,Welding,Bolting of Str. Members,Bracings, Erection of Bal Members, Restoration,etc
Custom Bid for Services - 200140770 BIENNIAL MAINTENANCE RUNNING MAINTENANCE, BREAKDOWN WORKS CONTRACT OF BOILER, TURBINE AND HVAC OF STAGE-I 2 X 800 MW UNITS OF NTPC TELANGANA Similar Category Operation and Maintenance Power House/Power Plant
2Ton per hour Automatic 4 Head Linear Weigher / Dual Head Servo Based Weigher with accessories to pack 1000 grams free flowing Granules Upma / Khichdi Mix in retail laminated pouches with VIDEOJET TTO Printer (Packing Machine). With Stainless Steel ... Screw Conveyor
BTPS-CHP-Clearing of all chutes and flap gates from BCN-1A/1B conveyor to bunker floor required in Operation and Electrical division of CHP/BTPS for a period of 03Months from 01.04.2026 or from actual date of commencement of work
Spark Plug, Camshaft seal, Front Hub Oil seal, Front Disc Pad, Spider bearing, Radiator Assy, Engine mounting pad, Coolant hose pipe D1, Coolant hose pipe D2, Steering reservoir filter, Deration tank, Rear view mirror both side, Rear tail light assy, ... assy, Air compressor top ...
Safety Wire Locking Tool 10inch and 15 Inch, Locking Wire 0 point 6mm thick and 0 point 8mm thick, Tap Wrench 3 inches 6 inches 10 inches, Carbide Drills Bits, HSS Drill Bits, Tap Sets, 6 Inch Stainless Steel Depth Gauge Pack of 5, Air Compressor Machine with accessories, Pipe Wrench 15 Inches, CSK Bits, Customizable Screwdriver Bit Set, Impact Screwdriver Set, Webbing sling 1 ton 2 meter, Webbing sling 2 ton 3 meter, Webbing sling 5 ton 5 meter, Ratchet Lashing Endless with rachet 25 mm x 15mtr, D- Shackle Screw Pin C 1 by 2 inch 12 point 7 x 16 2 Ton Cap, Bench vise 150mm With Side groove, Socket Combination Kit 46 Pices, Adjustable Spanners 6, 8, 10, 12 inch, Cordless Drilling Machine Bits Assorted, Nut Drivers All Sizes, Engraving Machine, Digital Vernier Calliper 1000mm, Digital Vernier Calliper 150mm
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 1 - Rectification of tube leaks in Boiler-1, on an urgent on-call basis during emergency shutdown from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement to 31.03.2027.
TGGENCO-KTPP-Stage-II-TMD-Repair and reconditioning of removed/old Boiler Feed Pump Cartridge of TDBFP-A(Model No.FK4E36, Cartridge Sl.No.17/1176-P-1) pertaining to 1*600MW Unit of KTPP Stage-II during 2026-27
BTPS - CHP - Engaging of 02No Back Hoe loaders of engine capacity not less than 48HP for clearing of grid jams at wagon tippler-1,2 and on track hopper-1A,1B grid for facilitating further unloading of coal tipper and also for removal of spilled over ... chain conveyor jams ...
BTPS - CHP - Engaging of 02No Back Hoe loaders of engine capacity not less than 48HP for clearing of grid jams at wagon tippler-1,2 and on track hopper-1A,1B grid for facilitating further unloading of coal tipper and also for removal of spilled over ... chain conveyor jams ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1980 BP SRIRAMPUR in package III of Kothagudem Division
1) Widening & strengthening of Marpally to Kotepally Road from Km 0/0 to 10/0 in R.R District 2) Widening & Strengthening of Ibrahimpatnam to Rangapur Road from Km 10/200 to 21/900 in R.R District 3) Widening & Strengthening of Tandur to Dharur Road ... new machinery for ...
Clear felling & Chipping and heaping in the entire area , Uprootal of stumps, Tilling of Soil over entire area to a depth of 0.45 Mtrs using heavy Machinery i.e. excavators fitted with 0.90 Cubic Meters and above capacity bucket , collection and removal of all stacking , filling of resultant pits with soil and levelling of the site in the Plantation area in 2023 EP Narayanpur ' K ' (Old 1981 EP) and 2023 EP Narayanpur ' K '(Sec I 2004 BP) at Warangal division (Package No- II)
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2025 EP Mulakalapally (2003 EP) Package.no.IX of Paloncha Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2008 EP Katkur in package XII of Sathupalli Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1979 BP SRIRAMPUR in package I of Kothagudem Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted 200 LC with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1979 BP SRIRAMPUR in package V of Kothagudem Division
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2025 EP Lingaredypally (2005 EP) Package.no.X of Paloncha Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2007 EP SRIRAMPUR & 2007 EP NAGUPALLY in package III of Kothagudem Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1980 BP Lankalapalli in package XIII of Sathupalli Division
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2024 EP Narayanpur (K) (2002 BP) of Mulugu Division