Loading…
Loading…
5,533 results • Best match
Connecting Rod Crank Shaft Assembly complete for ELGI Compressor to ELGI Part No. A0 70069
Spares for ELGI Make Bus Duct Screw Compressor 9th &10th unit and Air Dryer10th Unit
Supply of Compressor for IDM-30D, 150mm Diesel Drills at OCP3, RG2 on proprietary basis
M24 kit required for maintenance of APU compressor in ALCO loco as per annexure attached.
Supply of Spares for Kirloskar Pneumatics Company Ltd (KpCL) make LpG Compressor (Modet 1 EHA2GT)
Operation And Maintenance Of Gas Compressor Station - COCO Thimmapur; As per Buyer specific ATC Document
Engaging of Vehicles, Machinery for Collection and transportation of C and D waste, accumulated silt, garbage and sand on roads in view of Praja Palana - Pragathi Pranalika of 99 Days action program in Kapra Circle-7, Uppal Zone, MMC(Rs.20.00 Lakhs)
Non comprehensive Bi-ennial Maintenance contract for Vacuum Hot Hydraulic Press 50T capacity at BCCP of HWPM
Outsourcing of 900 Man Shifts for cleaning of approx. 1200T of Slush jammed along belt conveyors working at PVK No.5 Incline, Kothagudem Area for a period of 1 year.
Repairs to damaged cement concrete wall, flooring and drains around Drive Units of C-2 and C-4 conveyors of CHP, KHAOCP, Bellampalli Area, Rebbena Mdl., Kumrambheem - Asifabad Dist., T.S.,
Replacement of Discharge stations and Feed stations of C1C, C1B,C1A conveyors and C1 trolley at RG CHP at OCP-III at Rg-II area, Godavarikhani, Dist. Peddapalli, Telangana State.
To carry out cold rubber lagging of pulleys of conveyors as and when required on value rate contract basis for a period of two years at STPP, Jaipur, Mancherial, Telangana
Renovation and Up gradation of existing Nursery Shed into Boiler Shed at CSIR-CIMAP R.C. Hyderabad
BMC FOR CONVEYOR BELT VULCANIZING AND PULLEY LAGGING WORKS IN CHP FOR TWO YEARS 2021-23 AT NTPC RAMAGUNDAM
1432 mm Length Return Idler for 1200mm Width belt conveyor as per Drawing no. HWPM/MU/202. Rev-0
Procurement of Spares for Elecon make Conveyor Systems at RGOC2, RG-3 Area under Rate Contract for one year.
Procurement of 105 mm end housings for manufacture of conveyor rollers (900 mm & 1000mm belts) at main workshop, KGM.
Procurement of Gear boxes and Gear couplings for the Conveyor drive units working at various CHPs at various Areas
Supply of spares required for conveyor chain of BEC 500 TPH Feeder Breaker working at OC3 Phase2 CHP, RG2
Procurement of Ceramic Lagging for Conveyor Belt drums working at GDK-11 Incline RG1 Area on Specific make basis
Supply of 23140KEMBW33 Bearing for conveyor chain drive shafts of BEC 500TPH Feeder Breaker at OCP3 Phase2 CHP, RG2
Procurement of 105 mm end housings for manufacture of conveyor rollers (900 mm & 1000mm belts) at main workshop, KGM.
Procurement of various sizes of Steel Cord Conveyor Belts for use at CHPs, Pit Head CHPs and ALP Mine
Erection and Commissioning of 500 TPH Feeder Breaker along with 30KW, 1400MM belt conveyor at Kistaram OCP, KGM Area
Replacement of Rolling stock on 10KM length conveyor system at CHP OCM-1 for a period of TWO YEARS.
Procurement of Conveyor Drive Shafts and return shafts for 500 TPH Bhiloy feeder breakers working in RGOCM-1 CHP
Rubber Lagging for belt conveyor pulleys, hot & cold patches at VKP Mine, RG2 for a period of two years
Procurement of Fluid couplings for feeder breakers and Conveyor gear boxes on specific make basis under Critical revenue budget.
Procurement of spares for Rampur make belt conveyor 132KW drive unit on proprietary basis working at KCHP,MNG-Reg.
Outsourcing of services for reconditioning of loop takeup unit and tail drums of 1200mm wide conveyor working at RGOC2
procurement and installation of bailing machine,Garden shredder,sorting conveyor belt,high pressure air blower etc to kyathanpally municipality
1.Parallel Flow/Counter Flow Heat Exchanger 2.Heat Transfer In Forced Convection 3.Heat Pipe Apparatus 4.Dropwise and Filmwise Condensation Apparatus 5.Pin Fin Apparatus
Engaging of vehicles and machinery for collection and transportation of C and D waste, legacy waste, green waste and towing vehicles for scrap and unauthorized parking vehicles in Madhapur circle-50,CMC
200137642 Air Seal Application in Boiler 1st and 2nd Pass Expansion Joints,Penthouse, Windbox, burner panel and APH Guide and Support Bearing Area at NTPC Telangana
De-silting work with Electrical wit air jet compressor, Water pressure, Water jet, Mud lifting air hoses jet, Diving compressor & Diving kit with Divers and Workers Under water at Intake well in Chinnaravigudem of Manuguru Municipality
Repairing of Crusher Roll Units of Atlas Copco/ Elecon/ BEC/ Utkal make 500 TPH Feeder Breakers on Rate Contract for a period of two years.
Collection and spreading of Crusher stone dust for filling of pot holes at various places for festivals in Vikarabad Municipality under General Funds 2023-24
M & R works to base workshop, CHP and in pit crusher for the year 2024-25 at KHAOCP in Bellampalli Area, Kumrambheem-Asifabad Dist., T.G.
BTPS - CHP - Removal of spilled over coal and fine dust at stacker cum reclaimer-1 and 2 and along and underneath of BCN-8 and 9 conveyor by head loads on to running conveyor from 01.08.2025 or actual date of commencement of work to 30.11.2025
BTPS - CHP - Removal of spilled over coal and fine dust at stacker cum reclaimer-1 and 2 and along and underneath of BCN-8 and 9 conveyor by head loads on to running conveyor from 01.08.2025 or actual date of commencement of work to 30.11.2025
DRY FLEX. CPLG(C2) BETWEEN GB&COMPRESSOR (Material code - TC9762728025) (Q3), DRY FLEX. CPLG (C1) BETWEEN MOTOR & GB (Material code - TC9762728017) (Q3)
Custom Bid for Services - Annual Maintenance contract of Under Floor Wheel Lathe Machine of HYT make model No NGUFWL 23 Similar Category Customized AMC/CMC for Pre-owned Products
HAML-Hyderabad Metro Rail Project Phase-II-Corridor-VI-Road Widening from Darulshifa to Chandrayangutta - Dismantling of affected properties bearing sketch No.124, 127, 128, 156, 163, 165, 167, 174,179, 182, 197, 212, 235, 241, 254 on LHS under road ... Combi crusher / ... Jaw crusher and ...
In Situ Repair of Boiler Main Steam Stop Valves of 500MW 200 MW units atNTPC RSTPS on LT Basis
Providing manpower with TandPs to to attend misc punch points of boiler and TG for all four units
Civil Works for Establishment of 20 TPH Boiler including other miscellaneous works, at HPEP, BHEL RC Puram, Hyderabad
Supply of Spares for Mill Hot Air Control Dampers of Unit-11 (500MW) Boiler of KTPS-VI Stage
Supply of Temperature elements (Thermo couples and RTDs) in various locations of turbine & boiler area of stage-II
BMD-Service charges for Testing and metallurgical analysis to find out root cause of failure in Boiler tubes
Annual Overhaul works on Pressure Parts in Second Pass of Unit-2 Boiler during overhaul period 2025-26