Loading…
Loading…
5,536 results • Best match
Carrying out Cold Vulcanization joints, Rubber lagging and cold patches works on belt conveyor working at JK5OC CHP,Yellandu Area for a period of one (1) Year.
Manufacture and Supply of various sizes of FR Grade NYLON-NYLON, Heavy Duty Conveyor Belts required for coal handling plants of various thermal power stations of TSGENCO
VPI Rewinding of stator and Dynamic balance of rotor of failed CGL make 220kW, 6.6kV Conveyor motor with frame size TPC 400D and Sl.No.TPC295129/1 in CHP
VPI rewinding of stator and Dynamic balance of rotor of failed CGL make 233kW,6.6kV Conveyor motor with frame size TPC 355D and Sl.No.TPC195146/1 in CHP
Providing miscellaneous works like protection wall, kerb wall, flooring etc., for commissioning of No. 01 belt conveyor at OC-IV in Manuguru area, Bhadradri Kothagudem Dist, TS.
Civil works for foundation of 90 KW Belt Conveyor, Drive head, Tail end unit at pit head CHP of KTKOC-II, Bhupalpalli, Jayashankar Bhupalpalli-Dist Telangana State.
Conveyor belt with metal ZIP for baggage scanner Model No. Rapiscan-RAP 627XR for Chennai Central Railway station Firms Offer : Same as above. Make / Brand : RAP 627XR
" 1" PITCH # 80-H-1 ASA CHAIN OFF SET CONNECTING LINK FOR PC LINE CDLR CONVEYOR CHAIN IN MOULD ROOM. MAKE:T.I.DIAMOND/RENOLD-XD." ACCEPTED MAKE: RENOLD-XD
TGGENCO0-YTPS(5x800MW)-Stage-1-Unit 1-Boiler-Loading, unloading and cleaning of mill rejects coal, debris and coal on feeders floor area, mill pits, mill around area at zero meter and transportation in Boiler-I Stage-I YTPS as and when required for the financial year 2025-26 from the date of commencement of the work to 31.03.2026
Construction of cross drains, toe wall along longitudinal drain and pitching to sloped portion with fly ash bricks from in-pit crusher to transfer point at KHAOCP, Bellampalli Area, Kumrambheem-Asifabad Dist, Telangana State
Hiring of 2 (Two) Nos of not less than 500 TPH capacity Mobile/SEMI-Mobile Crusher for crushing 75 LT of coal to -100mm size at KCHP, Manuguru for a period of 3 years.
RUNNING MAINTENANCE OF LRSB WALL BLOWERS BURNERS AND OTHER MISC WORKS REPAIR RECLAMATION FABRICATION WORKS IN STAGE I II AND III BOILERS AndSERVICING OF HP VALVES IN BOILERS IN STAGE 1,2 AND 3 BOILERS FOR 202021 And 2021 22
VPI (Vacuum Pressure Impregnation) Rewinding of stator and Dynamic balance of rotor of failed CGL make 215KW, 6.6KV Conveyor motor with frame size TPC 355D and Sl.No TPC195144/2 in CHP and VPI( Vacuum Pressure Impregnation)Rewinding of stator and ... kV Conveyor motor ...
Hiring of 40HP, 150 CFM Air Compressors for Pneumatic Roof Bolters working at various UG mines of SRP Area for a period of TWO YEARS as per the Scope of work, Terms and Conditions of NIT
Custom Bid for Services - Hiring Cluster Based Comprehensive Annual Maintenance Contract (CAMC) Services for Sopan Make CNG Booster Compressors at Hyderabad for a Period of 03 Years Similar Category Customized AMC/CMC for Pre-owned Products
HMR FRG TOOTH, 330MM, 220MM, 140MM, HMR FRG TOOTH, GR4140, 265MM, 175MM, 96MM, HMR FRG TOOTH, GR-4140, 339.2, 230, 140, HMR FRG TOOTH, GR4140, 334MM, 230MM, 140MM, HMR FRG TOOTH, GR4140, 340MM, 230MM, 100MM, HAMMER FORGED TOOTH 320MM 206X68MM, FRG TOOTH HMR, 501MM, 325MM, 55MM, GR4140, HMR FRG TOOTH, GR4140, 350MM, 240MM, 102MM, HMR FORGED TOOTH, 350MM, 238-242MM, HMR FRG TOOTH, 268MM, 173MM, 98MM, HMR FRG TOOTH, GR4140, 277MM, 177MM, 100MM, HAMMER FORGED TOOTH 4140 280MM 175X100MM
PR 100254418 10 M5507486025, PR 100254418 20 M5507366205, PR 100254418 30 M5507366207, PR 100254418 40 M5507366225, PR 100254418 50 M5507366229
45120004101053, 45120004101062, 45120004101065, 45120004101098, 45120004101101, 45120004101102, 45120004501037, 45120004501038
TSGENCO-BTPS-Stage-II- BM -Attending of Water wall Soot Blowers (WWSB), Long Retractable Soot Blowers (LRSB) repair works/servicing in Unit-III and Unit-IV Boilers during the year 2024-25 (from 01-04-2024 to 31-03-2025
Comprehensive annual Maintenance contracts (including Compressor, Gas, Fan, Motors and all spares) repairs and maintenance for 41 nos Air Conditioners at CWC, Hyderabad
CERTAIN REPAIRS/IMPROVEMENT OF CENTRAL AC PLANTS INCLUDING REPLACEMENT OF CONTROL SWITCH GEAR COMPRESSOR AND MISCELLANEOUS WORKS UNDER GE I RND RCI HYDERABAD
Overhauling kit for Auxiliary Compressor type CRC150 to ELGI Part No. 072496469 consisting of 12 items, as per attached document. Make / Brand : ELGI
Overhauling kit for Auxiliary Compressor type CRC 150 to ELGI Part No. 072496469 consisting of 12 items as per attached document. Make : ELGI
Safety valve 3/8" BSP for Elgi main compressor, model TRC-1000 to M/s. Elgi part No. A 020002. ACCEPTED MAKE: ELGI
Supply of 01 No. Control line filter (OEM part No. 02250112- 032) for 500 CFM SULL AIR make compressor. Accepted firms make : sullair
Safety Valve 3/8" BSP for Elgi Main Compressor, Model TRC-1000 to M/s Elgi Part No.A 020002. Accepted Make/Brand: ELGI
Auxiliary compressor, oil free as per M/s knorr Bremse part no.8.010.1.321.110.8 suitable for Train 18 Vande Bharat rake Make:M/s.knorr Bremse
PR 100252677 - 10 - M5505606351, PR 100252677 - 20 - M5505606334, PR 100252677 - 30 - M5505606347, PR 100252677 - 40 - M5505606348, PR 100252677 - 50 - M5505606345, PR 100252677 - 60 - M5505606346, PR 100252677 - 70 - M5505606349, PR 100252677 - 80 - M5505606350, PR 100252677 - 90 - M5505606353, PR 100252677 - 100 - M5505606312, PR 100252677 - 110 - M5505606341, PR 100252677 - 120 - M5505606354, PR 100252677 - 130 - M5505606342, PR 100252677 - 140 - M5505606343, PR 100252677 - 150 - M5505606344, PR 100252677 - 160 - M5505606355, PR 100252677 - 170 - M5505606357, PR 100252677 - 180 - M5505606352
BIENNIAL CONTRACT OF ONLINE LEAK SEALING FOR STEAM AND FEED WATER SYSTEM IN BOILER AND TURBINE SECTIONS OF STAGE I, II AND III AT NTPC RAMAGUNDAM.
Procurement of SS Rubber make spares for Boiler and Turbine auxiliaries at STPP, Jaipur, Mancherial, Telangana on value rate contract for a period of two years.
Procurement of SS Rubber make spares for Boiler & Turbine auxiliaries at STPP, Jaipur, Mancherial, Telangana on value rate contract basis for a period of two years
BMD- Removal of damaged insulation, Re fixing of Insulation including cladding at various ducts and steam valves of Boiler for 1X500MW KTPP Unit for 2025-26
Providing skilled labor, specifically IBR Welders and Grinders, to replace the boiler tubes in Unit-IX of the KTPS-V stage during the Annual Overhaul period.
Repair and Rehabilitation works including fabrication, roof sheet replacement and associated civil works at Boiler House area, Disaster Recovery Centre, Factory Gates and other Miscellaneous locations
Supply, erection, testing and commissioning of 500 Kgs./hr capacity coal/Multi(solid) fuel fired boiler along with accessories including water softening plant at Khammam Dairy
Supply of filters, filter changeover valve for main oil tank , turbine drive boiler feed pump and LP Bypass oil filtration unit at STPP, Jaipur, Mancherial, Telangana
Procurement of BHEL / Emperor Engineering / PD Enterprises / Ideal Industries Incorporation / Coimbatore Combustion Equipments & Consulting Engineers make spares for Boiler soot blowers at STPP, Jaipur, Mancherial, Telangana
Construction of the scaffolding for Overhaul works in the Boiler and Radiography test for Overhaul works of 62.5 MW RTS-B for the year 2019-20
Filling of pot holes with crusher stone dust and engaging of JCB and blade tractor for level the unlevel grounds at Godam gadda locality in Div No.35 during the bathukamma festival 2021 of MCK
Outsourcing for welding of picks and Pick holders to 500 TPH In-Pit Crusher-rolls at OCP-SRP for a period of 3 years as per the Scope of work, Terms and Conditions of NIT.
TGGENCO-KTPP-Civil-Stage-I-Fabrication, Erection and fixing of 100NB B Class MS and 150NB B Class GI Rain water down take pipes for all TPs and Crusher House-II of ACHP at KTPP.
Filling of pot holes with crusher stone and gravel at various places at newly merged villages Bommakal, Gopalpur and Durshed on ocassion of Vinayaka Nimarjanam of MCK Est. cost of Rs. 3.75 Lakhs under MGF
Procurement of 6 core pull wire cable for Belt lockout and AVA provision works(Safety feature) all along conventional belting around 7km length of Conveyor belt at ALP
Procurement of Rema Tip Top make Rubber Lagging for conveyor drums working in UG Mines on specific make basis on R/C for a period of 2 years
VPI Rewinding of stator and Dynamic balance of rotor of failed CGL make 233kW, 6.6.kV Conveyor motor with frame size TPC 355D and Sl.No.TPC195146/2 in CHP
Manufacture & Supply of various sizes of FR Grade NYLON/NYLON, Heavy Duty Conveyor Belts required for Coal Handling Plants of KTPS V&VI Stages, KTPP & KTPS VII Stage.
VPI Rewinding of stator and Dynamic balance of rotor of failed CGL make 220kW, 6.6.kV Conveyor motor with frame size TPC 400D and Sl.No.TPC295129/2 in CHP
Procurement services of cold vulcanizing joints patch works & conveyor drums lagging on EPFR belts working at Goleti-CHP and KHAOCP BPA Area for a period of two years
Outsourcing Contract for Rubber Lagging, cold patch repairs and EPFR belt jointing for 1200MM conveyor belts working at KTKOC-II, Bhupalpalli Area for a period of two years
VPI rewinding of stator and Dynamic balance of rotor of failed CGL make 215 KW, 6.6KV Conveyor motor with frame size TPC 355D and Sl.No.TPC195144/3 in CHP