Loading…
Loading…
7,363 results • Best match
Selection of Laboratories for Testing of Products/Material - Ultrasonic Testing of Mill Roller shaft Under Feed Roller shaft; Ultrasonic Testing of Mill Roller shaft Under Feed Roller shaft; EACH; UTRASONIC TESTING, Selection of Laboratories for ... of boiler house ... of boiler house ... of boiler house ...
NOZZLE FOR BOOM SPAYER, BLADE SET WITH BOLT FOR JUNGLE JIM, BACK WHEEL BEARING FOR 15 FEET FLEXI WING ROTARY CUTTER, SHAFT SHARING BOLT FOR 15 FEET FLEXI WING ROTARY CUTTER, BACK WHEEL SPRING FOR 15 FEET FLEXI WING ROTARY CUTTER, GEAR BOX SEAL FOR 15 ... CUTTER, GEAR BOX BEARING ...
Square Shape Honing Stone, Triangular Carbide Boring Bit, V Belt, Washing Brush, FIP Drive Coupling, MPC Hose, Air Compressor Hose, Belt for Alternator Test Bench no Twelve Fifty, Six sq mm Heavy Duty Battery Link Cable Red, Six sq mm Heavy Duty Battery Link Cable Black, Three inch Screw with nut and Washer, Two inch Screw with nut and Washer, Silicon Gun fifteen inch Sausages silicone sealant Gun, PP Fifty eleven B Penetrant, PC Fifty twenty oen B Cleaner, PD Fifty Thirty oen B Developer, Crocodile Clip
Waying Machine (Q3), Flat Segrigation Conveyor Belt (Q3), Fatka Machine (Q3), Shreding Machine (Q3), Hydraulic Bell Press Machine (Q3)
Repair and Overhauling Service - LAVATORY CART; LAVATORY CART; No; Service Provider Premises, Repair and Overhauling Service - AIR START UNIT GAS/COMPRESSOR; AIR START UNIT GAS/COMPRESSOR; No; Service Provider Premises, Repair and Overhauling Service ... - COMPRESSOR UNIT ... ROTARY AIR ; ... AIR; COMPRESSOR UNIT ...
OVERHAULING OF CGL MAKE 145 KV SF-06 CIRCUIT BREAKER INSTALLED AT 20 MVAT T/F BAY AT 132 KV S/S KAYAMGANJ AND OVER HAULING OF COMPRESSOR INSTALLED AT 145 KV SF-6 C.B. OF 63 MVA T/F-II AT 132 KV S/S FATEHGARH UNDER ETD-FATEHGARH
Main Compressor (Oil Lubricated) for Electric locomotive (1745 LPM Capacity) with mounting accessories along with motor (wound with Corona resistance wire). Specn/ Drg No:- (1) RDSO/2018/EL/SPEC/0137 Rev 0 with Latest Alt. (2) Spec/E-10/3/09 (Motor) with amended No.01,02,03,04 & 05 with latest Alt.
Capacity 30 Kg charge of dry linen Steam Heated, Custom Bid for Services - 3rd Year CAMC of 01 nos Industrial Washer Cum Extractor Machine Capacity 30Kg charge of dry linen Steam Heated, Custom Bid for Services - 1st Year CAMC of 04 nos Tumbler Dryer ... nos Air Compressor capacity ... nos Air Compressor capacity ... nos Air Compressor capacity ... steam Boiler 600 ... steam Boiler 600 ... steam Boiler 600 ... steam Boiler 850 ... steam Boiler 850 ... steam Boiler 850 ...
Master, Pad, Kit, Oil, Fuel, Air, Fan, Armature, Drive, Field, Throwaway, Cable, Solenoid, Gasket, Compressor
REPAIR OF CHILLER ROOM (18c) { (GAS FILLING, REPLACEMENT OF COMPRESSOR, CHANGE OF PIPES, FLITTING C
OIL CHILLER, COOLING CAPACITY: 15000KCAL/HR, FLUID FLOW RATE: 50 LPM (MIN), REFRIGERATION COMPRESSOR (Q3)
CRANK SHAFT, ROD PISTON, WEDGE BELT, CROSS HEAD GUIDE, PISTON HALF, COVER FRONT, COMPRESSOR OIL
Gas Turbine Discs/ Wheels including L/X Ring and fully Bladed compressor disc Stage 16
100267464 - 10 - M3448306171 - TUBE BUNDLE, COMPRESSOR, 2HSE2NL2, 100267464 - 20 - M3448306170 - AFTR COOLER ASY(SML), 340120040M
Lathe Machine as per IS 6893:1988 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6566608 Dated : 13-08-2025 Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : General Manager Post Box-225, Chakeri, Kanpur-208008, Uttar Pradesh, India (Arvind M Tumane) Splitting
Servicing, Maintenance and Replacement of HP/LP Valves of boiler during overhauling of Unit 3, 2x210MW, BTPS, Parichha.
Fabrication of Platform and approach at different areas relating to Boiler Maintenance Division - II, 2x500 MW, DTPS, Anpara.
Removal of firm Ash mud from underground cable tunnels trenches of Boiler area of 3x210 MW ATPS Anpara
Supply of Pressure Gauges of different specification for Mills and Main Boiler etc. of 2x500 MW, BTPS, Anpara
REHEATER MODIFICATION AND ASSISTANCE IN SHOT PEENING WORKS OF UNIT NO. 2 BOILER AT 2X800 MW NTPC GADARWARA
TRIENNIAL MAINTENANCE (RUNNING MAINTENANCE, BREAKDOWN and OVERHAULWORKS) CONTRACT FOR BOILER and AUXILIARIES OF 2X660 MW TANDA STAGE-II.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; AMC OF BOILER INSTRUMENT; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Sugar Mill; Boiler of Sugar Mill; Service Provider
NEW CHAIN WITH CARBON STEEL BUCKET FOR DRY SEED ELEVETOR, C. I LEVER FOR BOILER FURNACE CONVERSION BASIS
Repairing of damaged Tie Beams of Primary Crusher Replacement with New or repaired Tie Beams installed in CHP 3x210MW ATPS Anpara as per scope of work
Filling & Capping Machine, Labelling Machine, Case Packer Machine, Case Sealer Machine, Carton Check Weigher, Filling Machine Change Parts, Case Packer Change Parts, Conveyors, Installation and commissioning Charges, Packaging & Forwarding charges, Freight charges
1.Heating Element 1500W, threaded type, 230V, 50Hz, BSP-38mm, pipe OD-10.8 Length 190mm for Vande Bharat water boiler as per SUNTRACK Model No. SE/VBT/25-26/190/05/07 or its equivalent. 2.Refrigeration Unit Spare Part - THERMOSTAT as per Specification EDTS-130(latest) suitable to VB Pantry used in Vande Bharat Trainset.
1.Heating Element 1500W, threaded type, 230V, 50Hz, BSP-38mm, pipe OD-10.8 Length 190mm for Vande Bharat water boiler as per SUNTRACK Model No. SE/VBT/25-26/190/05/07 or its equivalent. 2.Refrigeration Unit Spare Part - THERMOSTAT as per Specification EDTS-130(latest) suitable to VB Pantry used in Vande Bharat Trainset.
Work of Overhauling and Servicing of compressors of 132 KV SF 6 Circuit Breaker CGL make installed at 132 KV Sub Station Khurram Nagar under ETD II lucknow
MECHANICAL WORKS LIKE PREVENTIVE/ BREAKDOWN MAINTENANCE OF CHAIN CONVEYOR SYSTEM AND OTHER OFFLINE/ ONLINE EQUIPMENTS AT INDANE BOTTLING PLANT, PATTIKALAN
AUTO ONLINE WATERING DEGASSING UNIT 5, AUTO ONLINE DE WATERING DEGASSING UNIT, ROLLER CONVEYOR, MANUAL DIVERTER, DOUBLE STOPPER ASEEMBLY SET
Supply of WET GAS COMPRESSOR PACKAGE inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties, commissioning spares etc, Supply of Mandatory Spares inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties ... GAS COMPRESSOR -, ... GAS COMPRESSOR in ... GAS COMPRESSOR in
thread micrometer with interchangeable. Pitch anvils for, checking metric threads 60., Depth micrometer 0 to 25 mm, Digital vernier caliper., Digital Micrometer outside., Digital Vernier caliper, SS and SC centre lathe all geared with minimum ... suit Lathe tail ... stock, Lathe SS ... wheeler gear box for ... portable air compressor single ...
SET OF RINGS OF HP PISTON DIA 60 MM . FOR ELGI TRC -1000 COMPRESSOR ELGI PART NO. 022401039 CONSISTING OF (1) PLAIN COMPRESSION RING PART NO. 000416870 =1 NO. (2) STEPPED COMPRISSION RING PART NO. 000420330= 1 NO. (3) SLOTTED OIL CONTROL RING PART NO. 000416880 = 2 NOS.(PAC OF M/S-ELGI.)
Safety Sling for main compressor of WAG-9/WAP-7 locos as per SC Rly. Drg. No. C/ELS/LGD/AUX/4/39 Alt- 1 . Note:- 1) One sample should be got approved before effecting bulk supply. 2) Load test certificate Obtained from Govt. approved labs must be submitted along with the material.
Safety Sling for main compressor of WAG-9/WAP-7 locos as per SC Rly. Drg. No. C/ELS/LGD/AUX/4/39 Alt- 1 . Note:- 1) One sample should be got approved before effecting bulk supply. 2) Load test certificate Obtained from Govt. approved labs must be submitted along with the material.
Custom Bid for Services - TOTAL LUMPSUM AMOUNT INCLUDING ALL CHARGES AND GST FOR CLEANING OF COKE DEPOSITION OF VERTICALLY MOUNTED USX EXCHANGER TUBE DIAMETRE OF TUBE IS 152MM OF GAS CRACKING FURNACE WITH 20000 PSI, HYDROJETTING MACHINE, POWER LANCE ... MOUNTED HEAT EXCHANGER TUBES ... MOUNTED HEAT EXCHANGER TUBES ... MOUNTED HEAT EXCHANGER TUBES ...
FIELD COIL ASSY, DRIVE ASSY, REGULATER BRUSH BOX ASSY, DRIVEN PLATE FOR CLUTCH, MAJOR REPAIR KIT AIR COMPRESSOR, SOLENOID VALVE ASSY, WIPER ARM, DELETED WIPER BLADE, BEARING TAPERED ROLLER, KICK START CRANK ASSY, HOUSING FRICTION CLUTCH, PRESSURE MAGNET, RECTIFIER ASSY, REGULATOR ENGINE GENERATOR, MINIATURE RELAY NO, ASSY VACUUM HOSE FOR TC, OIL SEAL, HOSE ASSYAIR FILTER OUTLET, RELAY A, BRAKE HOSE FRONT SIDE, FUSE A ALTERNATOR, HOSE, DOOR LOCK ASSY LH, OVER FLOW VALVE, WIPER MOTOR RHD CARGO, WIPER BLADE RR, WIPER BLADE, SOLENOID SWITCH, LINK ASSY WIPER
Installation of 12 into pneumatic points on 06 into poles of painting shed for painting from Air Compressor of 8 into 8 sec, Elbow 1 Inch MS C Class, Socket 1 inch, Union 1 inch, Nipple 1 into 4 inch, Nipple 1 into 2 inch, Nipple 1 into 6 inch, Tee 1 inch, Nipple 1 by 2 into 6 inch, Nipple 1 by 2 into 4 inch, Tee 1 by 2 inch, Ball Valve 1 inch, Ball Valve 1 by 2 inch, FRL, Pipe 1 inch MS Class C Class, Brass Nozzle
Custom Bid for Services - Mechanical maintenance jobs for carousal equipments and other machinery in plant on need basis on Production Line Equipments as per PMSBreakdownPredictive maintenance As advised by Officer InCharge for 1200 days skilled at .., Custom Bid for Services - Misc jobs in shed Test bath Tareweight punching VCM Manual evacuation of cylinder and etc per shift as directed by officer incharge for 2500 day unskilled at Jhansi LPG Plant
AC COMPRESSOR, CONDENSSOR ASSY, COOLING COIL, AC FILTER, FAN BELT AC, PRESSURE CONTROL VALVE, CONDENSOR ASSY
Supply of Miscellaneous C and I Items for CPP, WTP and Compressor of 2x500MW, BTPS, Anpara
VANE PUMP, TD PISTON, HYDRAULIC HEAD, SOLENOID VALVE, CROSS DISE ASSY, AC COMPRESSOR, AUTOMATIC VOLTAGE REGULATOR
Electrical Works for installation and commissioning of one no. 150 CFM LPG Compressor at Loni BP
BLOWER MOTOR part no. 898A617BC371, BLOWER MOTOR part no. 62027398, MOTOR 20HP COMPRESSOR part no. 9630942065
AC Gas HMV, AC Compressor Oil HMV, Feviquick, M Seal, Tape Thread, Wheel Bearing Gun 130MM
OVERHAULING OF DUCTS, DAMPERS AND APPLICATION OF NMEJ FABRIC IN ECO DUCT OF BOILER OF UNIT 6, DTPS, ANPARA
Inspection of Boiler Pressure Part tubes by RFET method during overhauling of unit No. 5, 2X500 MW, BTPS, Anpara
Supply of Miscellaneous Items for Boiler Non Pressure Parts and Furnace Bottom Ash Disposal system of 2X500 MW, BTPS
Breakdown maintenance servicing of HP LP Valves Safety Valves and Coal Compartment Hoist of boiler of 2x210MW BTPS Parichha