Loading…
Loading…
25,656 results • Best match
RESTORATION OF DAMAGED SUCTION HOOD CANOPY OF PA FD FANS OF UNIT1 n 2 OF BOILER n COAL MILL SECTION, DSTPS, ANDAL
SHORT TERM MAINTENANCE CONTRACT FOR BOILER AND ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-1 TO UNIT-3 OF BKTPP
FABRICATION OF PLATFORM, STAIRCASE AND SHEDS OF HOISTS AND GUARD RAIL FITTING, FOR UNIT-4 AND 5 OF BOILER AREA OF BKTPP
Cleaning and Repairing job for Pent House and Dead Chamber area during O H of Boiler 1 scheduled in Aug Sept 2023
SHORT TERM MAINTENANCE CONTRACT FOR BOILER AND ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-4 AND UNIT-5 OF BKTPP
Overhauling and Repair / Refurbishment of 02 nos. BFP Cartridge Model no. 4 inchx8 stage BFI Boiler feed pump. Make M/s. PACIFIC.
SHORT TERM MAINTENANCE CONTRACT FOR BOILER AND ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-1 TO UNIT-3 OF BKTPP
SHORT TERM MAINTENANCE CONTRACT FOR BOILER AND ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-1 TO UNIT-3 OF BKTPP
New installation and commissioning of water feed-line with Feed check valve, bend, and other related valves for boiler at MSAM Colliery.
Cleaning Repairing, Hydraulic test and fitting with commissioning of Lancashire Boiler No WBL/10145 of Khandra Colliery VK Unit under Khandra Colliery.
DEPLOYMENT OF MANPOWER FOR CLINKER RELATED JOB OF BOILER (U1 TO U5) AND REPAIRING / REFURBISHMENT JOB OF AHP, BKTPP FOR TWO YEARS
RLA study of Unit 4,5,1 Boiler of BkTPP as per ibr-1950, reg. 391A, Table-I during overhauling-U#4,#5,#1.
Proposal for Repairing Replacement of damaged Welding receptacles of Unit 7 and Unit8 at different locations of Main Plant Boiler and Turbine.
Service order for servicing of Boiler Non-Pressure Parts (02 no Rotary APHs) at Unit#5 during short shutdown on February-25
Service Contract for Refurbishment of 89 nos. used Economizer Modules taken out from Unit-6 Boiler for life enhancement under BMD, STPS
Servicing of Boiler front and wind box and coal carrying pipe coal feeder chute replacement of Unit No. 2 during its overhauling
Servicing of Boiler front and wind box and coal carrying pipe, coal feeder chute replacement of Unit No. 2 during its overhauling
Renovation of shed at AB bay of boiler at feeder roof level of U4 and feeder floor level of U6 at KTPS
Life enhancement of entire boiler structure and Mill Structure along and its associated structures of Unit 6 on TRUNKEY basis at STPS.
Procurement of LT power cable for power source at Boiler and Turbine area of UNIT 4 under EMIPH II Department SGTPP WBPDCL
Procurement of 07 Sets Grinding Element with Buy Back for 10E10 Coal Mill of Stg-I Boiler under BM dept. at BKTPS.
Cleaning, dry lnspection, Repari, Hydraulic test and fitting of Lancashire boiler no WBL/11106 of Kumardihi A Colliery,under Bankola Area ECL
Repair Hydraulic Test and Fitting with commissioning of Lancashire Boiler No. WBL 10858 of Kumardihi B Colliery AB Pit under Bankola Area
Biennial RC for Repairing of Coal Bunker (as and when required basis) under Boiler Maintenance department of Unit-3 to 6, KTPS
Design, Manufacture, Supply, Retrofitting, Testing, Commissioning of 01 Goods Lift 2000 kg at U7 Boiler in place of Chinese origin lift DPPS
Procurement of straight pipe for repairing of Coal Carrying Pipe of Unit#2 boiler overhauling, scheduled in August-2026 ,STG-1, SGTPP.
Supervision work by Ex BHEL expert and safety valve seat cutting during overhauling of Boiler and Auxiliaries of Unit8, MTPS DVC 500MW
SHORT TERM MAINTENANCE CONTRACT FOR BOILER AND ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-1 TO UNIT-3 OF BKTPP
On line sealing of high pressure steam and feed water leakage of U 7 and 8 for Turbine, Boiler and Auxiliaries, DPL
Custom Bid for Services - OVERHAULING OF ONE UNIT OF STAGE 2 500 MW BOILER VALVES SOOT BLOWERS LRSB AND BURNER AT FSTPS
Custom Bid for Services - OverhaulingServicing of different electric hoist at Boiler Coal Mill area of DSTPSDVCANDAL Similar Category Repair and Overhauling Service
Custom Bid for Services - OVERHAULING OF ONE UNIT OF STAGE2 500 MW BOILER VALVES SOO T BLOWERS LRSB AND BURNER AT FSTPS
Custom Bid for Services - Maintenance of C and I System field portion of Main Plant Boiler and Turbine along with their auxiliaries
Custom Bid for Services - Replacement of the parts of the CDCP boiler 04 Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - Overhauling of Boiler Non Pressure Parts of MTPS U 5 250 MW Similar Category Repair and Overhauling Service
Pilot Bearing, Clutch Master Cylinder Assy, Sleev Cylinder Assy, Gear Box Seal, Tfr Case Oil Seal, Spider Bearing NM, Spider Bearing OM, Front Hub Oil Seal, Rear Hub Oil Seal, Air Dryer Rep Kit, Air Pressure Pipe, Guage Air Pressure, Hand Brake Assy, ... Cable, Air Compressor Gasket, ...
Custom Bid for Services - Deployment of Service Engineers for Inspection of Boiler Pressure Parts, Duct & Dampers and NDT Services during Overhauling of Unit#8 at MTPS Similar Category Operation and Maintenance Power House/Power Plant
Customized AMC/CMC for Pre-owned Products - AMC of Compressor FS405 and FS447; --; Annual Maintenance Contract (AMC); Monthly; Yes, Customized AMC/CMC for Pre-owned Products - AMC of Compressor FAS 699 700 701 702; --; Annual Maintenance Contract ... screw compressor ; ...
Supply, delivery and installation of Submersible Pumping Machinery including Laying and Distribution System of UPVC pipe line work at Sarada Pally at ward No-04 under Dubrajpur Water Supply Scheme under Dubrajpur Municipality,Birbhum.
Door Handle Outer, Assy Propeller shaft frt gear box to aux gear box, Speed Sensors, Self Pinion, Regulator, Rectifire, Clutch Fork Operating, Water Separator assy, Rear brake shoe, Fuel Filter 2 Pin, Head Gasket Cylinder, Brake Pad
ALTERNATOR REGULATOR, BEARING CLUTCH RELEASE, STG GEAR BOX REPAIR KIT, ENGINE SPEED SENSOR, WIPER BLADE, FUEL FILTER 2 PIN, WATER SEPARATOR ASSY, STEERING GEAR BOX REPAIR KIT, BRAKE PAD, GLASS FRONT DOOR LH, GLASS FRONT DOOR RH
Custom Bid for Services - 9040C25C92 ARC FOR EXPERT SUPERVISORY SERVICES FOR MAINTENANCE AND TROUBLESHOOTING OF MS FRICK INDIA LIMITED MAKE COMPRESSORS INSTALLED IN N2 PLANT AT HALDIA REFINERY Similar Category Support Services
Procurement of Tail Drum from O.E.M. for M/s. BTL EPC Ltd. Make 2X300 KW Drive, 6.6 KV, 1400 mm wide Dual Drive Belt Conveyor
Installation and commissioning of 1 no 1000 mm width X 185 mtr length belt conveyor at 30L 49R of mill. incline under Bankola Area.
Installation of Conveyor Belt along -4D in depillaring district of 02 Pillars 21L- 23L in -4D/22L at Satgram Project under Satgram Area, ECL.
Installation, commissioning of conveyor Belts in RV seam for SHCM package of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area.(04 Nos.)
Renovation of conveyor structure at 12A/B, 13A/B, 14A/B, 15A/B and life enhancement of TP-13 at CHP area of SgTPP.
Dismantling of 02 nos. abandoned air duct of 2A by B and transporting and cleaning the dismantled material outside the conveyor area at KTPS
Preventive maintenance and repair of tail drum unit structure of Conveyor R-1, CC-4 and Gathering Belt No.2 at Bhojudih Coal Washery.
Preventive maintenance and repair of tail drum unit structure of conveyor R-1,CC-4 and Gathering Belt No 2 at Bhojudih Coal Washery.