Loading…
Loading…
6,699 results • Best match
Complete outsourcing of labour jobs for erection, pre-testing and commissioning of U/G 66kV Sub-Station to 220kV Sub-Station and 01No. 220kV Line bay for RTSS Khai Pheme Ki at Jhoke Harihar (Near Ferozpur) under Grid Const. Division PSTCL Moga
E Tender for Outsourcing of Labour Part for Erection Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles Distribution T Fs Augmentation Sagging of ACSR of HT LT Lines etc Cables laying, Guarding, Stay Setfor Various Works etc
OUTSOURCING FOR MAINT AND OPERATION OF HT SUB STATION AT DEPOT AREA AND PUMP HOUSE NO 1 DOMESTIC AREA PUMP HOUSE NO 2 DEPOT AREA INCL ATTENDING DAY TO DAY MAINT AT 18 FAD UNCHIBASSI UNDER GE S PATHANKOT
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KVLT HT Lines on Rail PCC Poles Distribution TFs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Set for Various Works under CITY Div Ferozepur
E Tender for Outsourcing of Labour Part for Erection Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles Distribution T Fs Augmentation Sagging of ACSR of HT LT Lines etc Cables laying, Guarding, Stay Setfor Various Works etc
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
E-Tender Enq. No. 06 /Deputy CE/DS Circle, Ropar/2026-27 for Outsourcing of Labour Part to rectify low-lying PVC cables at road/street crossings under Sub Division City Morinda Under Kurali Division, under DS Circle Ropar.
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works under DS Division Maur
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Outsourcing for maint and upkeep of Md/OTM Accn conservancy and House keeping services (LDC/DEO, Ferro Printer, Mali/Gardener and conservancy staff) for MES Offices and Installations of HQ CWE and GE (East) under GE (E) Fzr cantt
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Outsourcing of ETC of 01 no. Addl. 31.5 MVA Power TF Under Annx. D along with complete bay equipments including indoor and outdoor equipments related work DS Circle Mohali on partial turnkey mode under GCD PTA under GCC LDH
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL Goraya
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under KARTARPUR DIVISION.
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division Garhshankar.
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under Phagwara Division
AS PER TENDER DOCUS
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL BANGA
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under Division Phagwara
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division Nawanshahr.
Execution of DS Impr./Capital Works (Labour component only) such as Erection of New HT/LT lines, DTs, etc. for ISC/GSC/AP Connections, De-loading/ Bifurcation of overloaded T/Fs, Feeders, for Development/ Improvement/ Deposit works
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL Garhshankar
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL Nawanshahr
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL Banga
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL Goraya
Outsourcing for operation and maint of HT 11 KV MRS at Damtal and sub station no.07 (Kaunterpur) including attending HT fuses off calls / breakdowns of HT electric lines at Nangal Bhur Complex under GE (South) Pathankot.
Tender for empanelment/outsourcing of Housekeeping and Security Services
Tender for contract for providing Manpower on Contract Basis for packing of Maize silage through imported balers and stacking through tractors at Punjab Agro Industries Corp. Ltd. Silage Project, Ladhowal, Ludhiana and other sites in the region
Custom Bid for Services - HOUSEKEEPING AND GARDENING SERVICES FOR TOTAL QTY OF 1890 SHIFTS AS PER SCOPE OF JOB STC AND BOQ, Custom Bid for Services - MECHANICAL MAINTENANCE SERVICES FOR TOTAL QTY OF 630 SHIFTS AS PER SCOPE OF JOB STC AND BOQ, Custom ... for Unskilled Manpower FOR ... Semiskilled Manpower FOR ... for Skilled Manpower FOR ... Highly Skilled Manpower FOR ...
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation Sagging of ACSR of HT LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well C
Outsourcing of Labour Part for Erection, Testing AND Commissioning of New 11KVLTHTLines on Rail/PCC Poles, Distribution TFs, Augmentation/Sagging of ACSR of HT LT Lines Cables laying, Guarding Stay Set for Various Works such as Releasing of T. Well
Outsourcing of Labour Part for Replacement of lowlying PVC at road crossings with 4core cables and re locations of MCB, to maintain line symmetry and proper ground clearance, replacement existing 8 meter PCC poles with 9 meter PCC poles, replacem
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/Well C
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCCPoles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works such as Releasing of T/Well Co
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/Well C
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation Sagging of ACSR of HT LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well C
Outsourcing of Labour Part for the pilot project to rectify low- lying PVC cables at road/street crossings under 1 no. ULB area of 3 no. Sub division, 2 no. Divisions (City Moga and Sub urban Moga) under DS Circle, Faridkot.
Outsourcing of 01 no vehicle Mahindra Genio Twin Cabin or equivalent Model not older than 5 Years from the date of opening of Tender upto May 2026 and extendable on year to year basis for further 3 years 8 months
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/Well C
Outsourcing of Labour Part for Replacement of low lying PVC at road crossings with 4 core cables and re locations of MCBs to maintain line symmetry and proper ground clearance replacement existing 8meter PCC poles with 9meter PCC poles replacement 1b
Outsourcing of jobs for daily cleaning, sweeping of roads etc., to attend day to day complaints of wood work, electricity, water supply and sanitary and civil works etc., to provide helpers and attend sewer complaints etc. in Power Colony-1, Patiala
Outsourcing the services of Housekeeping Security Gardening etc. for TTI complex including Hostels at TTI PSPCL Patiala and providing Part time sweeper and part time Mali for ZKC PSPCL Amritsar and ZKC PSPCL Bathinda under HRD org for yr 25_26
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, of Fazilka Sub division
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/W
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/Well C