Loading…
Loading…
877 results • Best match
Construction of Bus Waiting Shed
Capital work of 220kV Substation, Edappon- Extending existing 220kV double bus and construction of 2 Nos. of 220kV feeder bays at 220kV Substation, Edappon to the proposed 220kV Substation, Pathanamthitta- I Stage works.
Construction of Bus Waiting Shed (5.00 m x 1.80 m) at KNM Govt. High School Jn. Njaleekandam in Kaviyoor GP, Mallappally Block, Pathanamthitta District under MPLADS 2024- 25 of Sri. Anto Antony MP.
LAC-ADS-LAC ADS-2025-2026-Construction of bus shelters in Cape Engineering College Muttathara Valiyathura School Beemappalli Valiyathura road and Domestic Airport Trivandrum Valiyathura Airport road -in Thiruvananthapuram Constituency-General Civil W
Transgrid down stream works at 110kV substation TERLS Renewal of Control Cable Connections for CT PT Circuit Breaker Bus Isolators and Lightning Arresters of 20 MVA Transformer Unit 2 necessitated by Transformer Repositioning
Supply of 33kV 800A Bus and Line Isolators with structure and 11kV 800A Bus Isolator with structure
supply of 50 numbers of silicon composite220kV,8kNbus post insulator without structure
Capacity enhancement of 110kV Substation, Westhill by replacing 110/11kV, 12.5MVA Transformer No.3 with 110/11kV, 20MVA transformer including construction of an additional transformer bay for transformer bus arrangement - Civil work for foundations
Capital work of 220kV Substation, Edappon- Extending existing 220kV double bus and construction of 2 nos. of 220kV feeder bays at 220kV Substation, Edappon to tie the proposed 220kV Substation, Pathanamthitta- II Stage works.
LAC ADSConstruction of Bus Shelters-at various places in Main Central Road PWD Road Ezhukone Section under Kottarakkara LAC Pinattinmoodu Junction 2 Ambalappuram Junction 3 Nedumonkavu Junction 4 Nedumonkavu Kombanmukku Junction 5 Vakkanadu School
AEO WADAKKANCHERY
Work of 110kV double bus stringing including supply of single tension hardware for single Kundah bolted type suitable for departmental 90kN polymer insulator at the new 110kV yard at 110kV Substation Kanjikode for Capacity enhancement capital work
Kondiparambu Pallippadi bus waiting shed completion
LAC-ADS-MLA ADS - 2023 -2024 Nattika LAC Construction of bus waitting shed at Edakkunny in Cherpu GP, Pazhuvil in Chazhur GP, Mullakkara in Paralam GP and Herbert canal in Cherpu GP-General Civil Works
Design Engineering Supply Erection testing and commissioning of Fully redundant PLC system with controller various types of io modules bus interface modules communication interfaces and SCADA system for Kuttiady Extension Scheme KES 1x50MW at KHEP
REPAIR/MAINT OF OCBs, ISOLATORS, RMU, CERTAIN STABILIZERS, BUS DUCTS OF TRANSFORMERS AND MISC E/M WORKS INCLUDING CONNECTED ACCESSORIES AND PAINTING TO PANELS AT KB, NAY, GARUDA AND ALL OTHER AREAS AT NB(K)
Annual Plan-Manjeri Municipality 2025-26 Project No 289-Installation of gates, fencing, handrails and the area around yard Interlocking at Bus Bay Shopping complex kurikkal smaraka soudham commemorate the history of Manjeri-General Civil
GENERAL Providing footpath handrail and Road safety measures on S curve near JAVAN SHYJU SMARAKA BUS WAITING SHED on SH 38 PUKC bypass road between KM 20 400 TO 21 000 at Naduvannur WorkGeneral Civil work
concreting
LAC-ADS-2022-23- MATTANNUR LAC SMT K K SHYLAJA TEACHER MLA - CONSTRUCTION OF BUS WAITING SHELTER KANJIRODE IN THILLANKERY GP, NEAR AIRPORT MOONAMGATE IN KEEZHALLUR GP AND NEAR KPC HSS IN KOODALI GP- General Civil Work (Re-Tender)
Retender - Construction of 33 kV Substation at Elamkulam and allied works - Rearranging existing yard at 110kV SS Perinthalmanna by moving 20MVA Transformer to other side of Bus and adding Tie Isolator between two line bays - Foundation works
Construction of Dwarf wall (Random Rubble masonary Wall) Chain link fencing, Site levelling and Yard metaling for newly extended 110kV Vizhinjam-Veli feeder bay and bus coupler bay inconnection with Transgrid downstream works at 110kV Substation Veli
LAC-ADS-Construction of Bus Shelters at various places in NH 744 under Ezhukone Section, Kottarakkara LAC -1 Neduvathoor Junction 2) Plamoodu Junction 3) Killoor Junction (Neduvathoor GP) 4) Ambalathumkala East 5. Cheerankavu Junction 6.Kolannoor Ju
Enhancing capacity of old four spans of 220kV Bus # 1 by replacing existing ACSR double Moose conductor with ACSR Quad Moose conductor and replacing three Pantograph type isolator at middle of each Span at 220kV Substation Areekode
LAC ADS MLA ADS 2024 2025 Nattika LAC Construction of bus waitting shed at Anakkallu centre Poochunnippadam route in Avinisserry GP Vattamavu centre in Avinisserry GP Vayalkkara Thoppu in Cherpu GP Pallippuram centre in Paralam GP Venginissery
Construction of Bus shed cum open air auditorium
Waiting Shed
REPAIR/ MAINT SERVICING OF OCBs, VCBs, ISOLATORS, RMU CERATIN STABILIZERS, HT LT BUS DUCTS AND MISC E/M WORKS INCLUDING CONNECTED ACCESSORIES AND PAINTING TO HT PANELS AT KATARIBAGH, NAY, GARUDA AND ALL OTHER AREAS AT NAVAL BASE KOCHI
REPAIR MAINT SERVICING OF OCBs VCBs ISOLATORS RMU CERTAIN STABILIZERS HT LT BUS DUCTS AND MISCELLANEOUS E/M WORKS INCLUDING CONNECTED ACCESSORIES AND PAINTING TO HT PANELS AT KATARIBAGH NAY GARUDA AND ALL OTHER AREAS AT NAVAL BASE KOCHI
20 nos of33kV Bus isolator with ss and 25 nos 33kV Line isolator with SS and ES 70nos 110kV1200A bus isolator withss,120nos 110kV800A Bus isolator withss and 56 nos 110kV 800A Line Isolator with SS and ES
1/LSGD/AE/NMN/RETENDER/71/THALOOR BUS BAY
RENOVATION OF MATHAI MANJOORAN BUS ROOT IN DIV 68
PAVING BLOCK CONCRETE SIDEWALL BUS SHED WITH GI SHEET
Building roofing and MS fabrication
ST XAVIERS H S CHEVOOR
3.3V monolithic dual transceiver (Q3), data bus-isolation transformers (Q3)
49 SEATER TOURIST BUS AND ALLIED EXPENSES FOR VAYOJANA TOUR
Hiring of school but at Kulathupuzha Estate of the Company
NIRMALA CONVENT U P SCHOOL AYYANTHOLE
Waiting Shed Nirmanam
Bay modification of 110KV yard by providing 110KV bus selection for 200MVA transformers No 1 and 2 and shifting of 110KV bus coupler bay at 220KV substation Kundara
MPLADS2021 22 Construction of Bus waiting shelter at Kunnambetta Town Meppadi GP
Construction of commercial complex with bus waiting facility At Mavelikkara KSRTC Depot
The items included in the estimate are roofing with polycarbonate sheet, truss work for roofing using GI tubular sections, rain water gutter etc.
BUILDING
ELECTRICAL WORKS
Earthwork Demolishing rcc supplying filling quarry muck PCC 1 3 6 RCC 1 1.5 3 picking collecting metal, filling plastering fixing foun.bolt etc
Building Work
Civil and Plumbing works.