Loading…
Loading…
1,790 results • Best match
Construction of Temporary Pandal and wooden platform for the period from 09.01.2024 to 17.01.2024 at Doctor Bundh Bus Turning Area on Kakdwip Patharpratima Road in connection with the Gangasagar Mela - 2024 under Kakdwip Highway Sub-Division
Construction of Bus Buffer Zone by providing brick soling, Jhama bats etc including subsequent restoration of land after completion of Gangasagar mela at Chak Fuldubi Netaji Football Ground at Sagar Island under Diamond Harbour Highway Division
Construction of Temporary Pandal and wooden platform for the period from 09.01.2023 to 17.01.2023 at Doctor Bundh Bus Turning Area on Kakdwip Patharpratima Road in connection with the Gangasagar Mela 2023 under Kakdwip Hwy. Sub-Division
Painting of oil filled Transformers i.e Generator Transformer R,Y,B Phase, Unit Transformer-1, Station Transformer-1, Unit Auxiliary Transformer 1A , 1B and Station Auxiliary Transformer-1 and Bus ducts of Unit 7, MTPS, DVC
Engagement of 01 number hired school bus of seating capacity of 32 seats including driver for carrying school children of DVC employees from MTPS colony and CISF colony to different local schools around MTPS and back
Construction of Interlocking Concrete Block Pavement ICBP Road at the side of Canal near Vivekanda Bus Terminus South Side to Amdan More at Bypass in ward no. 6 , 4 within Ramjibonpur Municipality under Pathashree Urban Scheme.
Supply of Rigid bus splices connector to 50 O/D aluminum tube on both ways (for 25 kV systems) including fasteners as per drawing ETI/ PSI/ P/11180 and confirming to Specification : TI/SPC/OHE/Fitting
Aluminium bus tee connector assembly Complete 36 mm as per RDSO drg. no. ETI/PSI/P/6500 Rev C AND RDSO'S SPEC. No. TI/SPC/OHE/Fittings/0130 (10/13) with A & C Slip No. 1
Instrument Cooling Fan for bus Converter and Central Electronics as per ABB document No. HETT 402336 P0003 or M/S.EBM Nadi Model 4318/2127 or ETRI Model no. 158DH4TP13232 or M/S. SOFASCO Model no. D12
Paint enamel synthetic exterior finishing bus green ISC No. 299 as per IS: 5/07 (Reviewed in 2018) to IS: 8662/2024 third revision with RDSO amndt. No. 1B (Rev. 2.0) as an additional requirement along
MODIFIED SLACK ADJUSTER BOTTOM FOR WAG7 LOCOS AS PER DRG NO.ELW/BSL/4/WAG7/002 SHEET -1 & 2 FOR DETAILS REFER DRG. NO.ELW/BSL/3/WAG7/ALT-1 Accepted Offer:MODIFIED SLACK ADJUSTER BOTTOM FITTED WITH BUS
Aluminium bus tee connector assembly Complete 36 mm as per RDSO drg. no. ETI/PSI/P/6500 Rev C OR LATEST AND RDSO'S SPEC. No. TI/SPC/OHE/Fittings/0130(10/13) Rev. 1 OR LATEST.
Instrument Cooling Fan for Bus Converter and Central Electronics for used in WAP7/WAG 9 type 3 phase class of locomotives, Qty: 30 nos/Loco. Specification /Drg as per M/s ABB Doc.No. HETT 402336 P000
Pressure Plate, Army Bus, Belt Tensioner, Tata, Combination Switch, RE, Field Coil Assy, Army Bus, Door Glass, ALS, Solenoid, ALS
Construction of Concrete road Kalirmore Bus stoppage
Construction of Bus Terminus at Kamarpukur, Hooghly.
Construction of Bus Terminals at Lalgola Murshidabad
Supply Erection InstallationCommissioning of 7.0 Mtr. High Mast light with LED lighting arrangement along with civil work (construction and foundation) i) Manshatala More to Charan Bus More at Khakurdaha GP ii Manshatala More to Tentultala Mo
Maintenance n repairs for Electrical Work at different Depots, Sheds, Buildings and Sub Station Buildings at South Zone Thakurpukur , Taratala Depot, Garia , Lake Thakurpukur 3A Bus Terminus, Behala 14 no. Bus Terminus, Sarsuna Bus
Hiring of three (03) Nos. Buses for the use as Safari/Rides purpose at NBWAP (Bengal Safari), Siliguri for 210 days in a year
Urgent Repair and Maintenance of 24 Higher Officials Vehicles, Including 3 Buses and 6 EV Cars, for two Years under SWM-II Pool Garage.
Providing a suitable Hub with enough Parking Space for SBSTC buses, modern Refreshment and Toilet facilities for passengers, and various infrastructures. Kolkata to Durgapur.
SPECIAL REPAIR TO BLDG NO A/09/537 (SINGLE OFFR ACCN), ADDITIONAL ALTERATION TO BLDG NO P-717 HRDC BLDG AND PROVN OF RAIN SHELTER FOR CHILDREN NEAR THE KV SCHOOL BUS PARKING AREA UNDER GE PANAGARH
Construction for Temporary Pandal and wooden platform for the period from 09.01.2023 to 17.01.20203 at temporary bus turning area to parking zone at Kakdwip Stadium on the occasion of Gangasagar Mela - 2023 under Kakdwip Highway Sub-Division
Supply and Installation flex banner to be displayed at Jalpesh Mela Mukta Mancha entrance of the Mela ground , different places at Mela ground, road side display board and display at public / private Bus etc Jalpesh Mela 2025
Construction of Bathing Ghat and Bus Yatri Pratikhalay at Udaypur Village within Tiluri G.P at Mouza- Udaypur, JL No. 11, Plot No. 719, 790 Name of the Fund 15th FC Fund (Untied) during the F.Y 2022-23
5) MAINTENANCE OF DRINKING WATER SOURSE AT EAST SIDE OF ANTILA BUS ROAD. Installation of Water Supply scheme of 200mmx100mm dia X220.5 mtr. Deep PVC tubewell by rig boring method at Paikpari village under Antila Gram Panchayat.
Construction of Temporary Pandal and wooden platform for the period from 09.01.2025 to 17.01.2025 at Doctor Bundh Bus Turning Area on Kakdwip Patharpratima Road in connection with the Gangasagar Mela - 2025 under Kakdwip Highway Sub-Division, Diamond
Engagement of technical consultant for preparing of DPR against additional works, as proposed, of the installed facilities of the Training Centre-cum-Guest house of STUS under Transport Department in the SBSTC bus terminus premises at Digha
Construction for Temporary Pandal and wooden platform for the period from 09.01.2024 to 17.01.20204 at temporary bus turning area to parking zone at Kakdwip Stadium on the occasion of Gangasagar Mela - 2024 under Kakdwip Highway Sub-Division
36 mm Aluminium Bus Splice (6491 of 1 no & 6482 of 4 nos, M12 SS bolt and Nut with one spring washers and 2 washers of 8 set ) Spec: TI_SPC_OHE_Fittings_0130_with A_C_Slip_No_1, Drw: ETI PSI P 6490 R
Sliding glass shutter LH & RH as per Drg. No. C&W.LGD.SK No. 1070 COL 1 (LH) and Drg. No. C&W LGD SK No. 1070 COL 5 (RH) for Bus type window (LHB coach). Make/Brand - AGF
Aluminium bus tee connector assembly Complete 36 mm as per RDSO drg. no. ETI/PSI/P/6500 Rev C OR LATEST AND RDSO'S SPEC. No. TI/SPC/OHE/Fittings/0130(10/13) Rev. 1 Accepted make-SBI
Instrument Cooling Fan for Bus Converter and Central Electronics FOR used in WAP7/WAG9 type 3-phase class of locomotives Qty- 30nos./loco as per M/s ABB Doc.No. HETT 402336 P0003 or M/s.EBM NADI Mode
SET OF BUSHES FOR PANTROGRAPH TYPE AM-12, COMPRISING OF 04 ITEMS 18 NOS. AS PER SKETCH NO. BSL/ELW/SK.NO. 4001 ALT.3 OR SIMILAR OFFERED DESCRIPTION : PLEASE REFER OUR OFFERED DESCRIPTION OF SET OF BUS
36 mm Aluminium Bus Tee Connector (6501 & 6482 of 4 nos, M12 SS bolt & Nut with one spring and 2 flat washers of 8 set ) Spec: TI_SPC_OHE_Fittings_0130_with A_C_Slip_No_1, Drw: ETI PSI P 6500 R C or l
36 mm Alluminium Bus Tee Connector with fasteners complete as per RDSOs Drg.No- ETI/PSI/P/6500, Rev-C,RI-6501 & 6482 or latest Accepted Make-SBI, NMPL, KF, NIKE or any core approved make. Make SBI
Item Type : Supply Item Description: CORE Item ID: 4200061 , Post Insulator for 25 kV Isolator and Bus Bars (RI 6090) Spec: TI/SPC/OHE/INS/0071, STR: TI/STR/010 Rev-01, or latest Accepted Make Brand
Clutch Plate, ALS, Sliding Glass, Army Bus, Ram Assy Kit, ALS, Slave Cyl Rep Kit, Army Bus, Wiper Blade Assy, MG
Construction of Road from 40 -a bus road Jugolermore to 97 bus road Kamarermore at Andharmanik gp under Bishnupur -I PS
Allied Works for the existing Canning Bus Terminus at Canning, in the Dist. of South 24 Parganas --- E.I. Works for suficient Compound illumination inside the Campus and for Internal wirings at the existing Building and other allied works.
Construction for Temporary Pandal and wooden platform for the period from 09.01.2025 to 17.01.20205 at temporary bus turning area to parking zone at Kakdwip Stadium on the occasion of Gangasagar Mela - 2025 under Kakdwip Highway Sub-Division, Diamond
Construction of Temporary Pandal and wooden platform at temporary bus turning area to parking zone at ONGC Road, Kakdwip for the period from 09.01.2023 to 17.01.2023 on the occasion of Gangasagar Mela - 2023 under Kakdwip Highway Sub-Division
CONSTRUCTION OF C.C. ROAD FROM SARDARPARA TO BUS STOPAGE AT BANDHAR PARA, MOUZA - MOHANPUR, J.L. NO-838, UNDER KADRA UTTARBIL GRAM PANCHAYAT WITHIN GARHBETA- I DEV. BLOCK, BOOTH NO 241, SOURCE OF FUND- APAS, DURING F.Y 2025-26.
Manufacture Testing Supply and Delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220KV Main Bus from twin ACSR Zebra to Twin ACSR Moose conductor and allied works at Kasba 220KV SS
Repairing of road from 40a bus road to h/o basudeb mondal via asit sanpui house at booth no-237 under andharmanik GP under Bishnupur-I Panchayat Samity. Fund -APAS (2025-26). ID- APAS/01/146/237/0006
Fabrication, galvanizing, testing, supply and delivery of different 132 KV Substation structures including G.I nuts, bolts and washers matching with the second main bus at Behala 132 KV Sub-station under Behala Area Office, WBSETCL under A.C.E, KTZ
Fixed Glass shutter with 5 mm toughened glass along with aluminium frame. Size:- 441 x 616 x 12 mm thick to suit bus type window assembly, with black powder coated. lS : 13871 1993, Grade-B, as per Dr
EMERGENCY WINDOW ASSY WITH SLIDING SHUTTERS (BUS TYPE WINDOW) TO DRG No. LS/AY/BW-5-4-004, ALT-e, WITH 16 Nos OF RUBBER PACKING SIZE: 5x10x10 MM TO RCF SPECN. MDTS-030, REV.00 AND ADHESIVES.
36 mm ALUMINIUM BUS TEE TERMINAL COMPLETE WITH FASTENERS AS PER RDSO DRAWING NO. ETI/PSI/P/6510 REV.-D OR LATEST IDENTIFICATION NO. 6511 & 6482 AND RDSO SPEC. No. TI/SPC /OHE/Fittings/0130(10/13) REV.