Loading…
Loading…
1,795 results • Best match
Construction of CC Road with Drain from 91 Bus Road to ho Akbar Ali at Mouza-Raigachhi, J.L. No.- 12, Sansad No.- VIII, under Rajarhat Bishnupur-I Gram Panchayat, Activity Id 115303332 of Year 25-26,Source of Fund CFC Untied
Lifting and Transportation of Sludge from Septic Tank and Mobile Toilet Units by 2 no. Cess Pool Car at Gangasagar Mela Ground and Bus Buffer Zone at Sagar Mela Ground for Maghi Purnima - 2023 in connection with G.S. Mela 2023.
Improvement and strengthening of Bituminous Road from A-2/38 to A-2/186, A-2/126 to Pump House (including Widening of 2.0 mtrs.), A-1 Regal Star Hotel to Bus Terminous, in ward No-15, Under Kalyani Municipality.
Construction of Temporary pandel and wooden platform etc. at Ayodhanagar Bus Buffer zone on the occasion of Gangasagar Mela 2023 under Falta E.P.Z. Highway Sub Division, P.W. Roads Dte in the district of South 24 Parganas during the year 2022-23.
Construction of temporary bus turning area to parking zone of Gangasagar Mela at Bamankhali MPS High School Ground at Pakhirala in Sagar Island under KHSD of DHHD in the district of South 24 Parganas for ensuing Ganga Sagar Mela 2023
Arrangement of temporary decorative illumination work from The junction of 215A Bus terminus to Fire Brigade left side On Ring-Road upto Newtown Connector(right side) on Link-road for the festival of HAPPY CHRISTMAS AND NEW YEAR - 2020 under NDITA.
Development of Marshy Land into Bus parking Area at Pailan Education Park in the West Side of bituminous road behind Diamond Harbour Police District Office in Bishnapur -I Block for the period of 09.01.2026 to 17.01.2026 during Ganga Sagar Mela -2026
CONSTRUCTION OF COVERD BLACK WATER RUNNING DRAIN WITH SOKE PIT FROM KANJIAL PARA 91 BUS ROAD H/O SAMBHUNATH MONDAL TO NOIKHAL BRIDGE MANDIR AT KANIAL PARA, MOUZA-RECKZUANI,L.J-13,SANSAD NO-III UNDER RAJARHAT BISHNUPUR I GRAM PANCHAYAT
Temporary water supply arrangement including repairing and maintenance of W/S line and other allied works at G.S. Mela ground of Zone-I, Krishnanagar Gandhi Smriti Football Maidan for buffer zone and 6 no. Bus Buffer Zone i.c.w G.S Mela 2025.
Construction of temporary New Bus at mouza- Kashtala under Kacuberia Section of Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela, 2023. 2nd call of e-N.I.T No - WBIW/EE/KIDIVISION/e-NIT- 11e/2022-23
Construction of temporary special latrine including maintenance at Tulsir Chak Bus Buffer Zone under Kulpi Dev. Block in connection with G.S Mela-2025 under RWS Alipore Sub-Division in the Dist. of South 24 Parganas under Alipore Division, PHE Dte.
Water supply arrangement including maintenance of pipeline at Belpukur Bus Buffer Zone within Kulpi Block in connection with Ganga Sagar Mela-2026 under RWS Alipore Sub-Division PHE Dte. in the Dist.of South 24 Parganas of Alipore Division, PHE Dte.
Construction of temporary bus turning area at Doctor Bundh at the flank of Kakdwip-Patharpratima Road (Ch. 2.00 km) under Kakdwip Highway Subdivision of Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing GS MELA 2023
Strengthening of Ghos para Road from 25.00 km to 25.186 km along with Service road and Bus Bay by Concrete Paver Block and from 25.186 km to 25.256 km by bituminous concreting under Barrackpore Division, PWD during the year 2022-23
Construction of Temporary pandel and wooden platform etc. at Banganagar Bus Buffer zone on the occasion of Gangasagar Mela 2023 under Falta E.P.Z. Highway Sub Division, P.W. Roads Dte in the district of South 24 Parganas during the year 2022-23.
INSTALLATION OF HIGH MAST LIGHT AT BARASAT NEAR KALIPADA MONDAL SHOP OF 24 NOS BUS ROUT AT MOUJA- PURBA-THAKURANICHAK UNDER THAKURANICHAK GRAM PANCHAYAT ( DELEVARY ERECTION COMMISIONING OF 9 METER OCTAGONAL HIGH MAST 4 X 100 WATT LED LIGHT SYSTEM )
Water supply arrangement including maintenance of pipeline at Belpukur Bus Buffer Zone within Kulpi Block in connection with Ganga Sagar Mela 2023 under RWS Alipore Sub Division PHE Dte in the Dist of South 24 Parganas under Alipore Division PHE Dte
Water supply arrangement including maintenance of pipeline at Belpukur Bus Buffer Zone within Kulpi Block in connection with Ganga Sagar Mela-2024 under RWS,Alipore Sub-Division.PHE Dte. in the Dist. of South 24 Parganas under Alipore Division, PHE D
Maintenance of LED signages at Nabadiganta Bhavan, LED gate at 215A Bus terminus, illuminated Welcome signage at Nabadiganta Flyover at WIPRO crossing under NDITA for 1 year which may be renewed as per satisfactory performance of the agency for anoth
Tender for ECV Below Rs.50 Lakhs
Lifting and Transportation of Sludge from Septic Tank and Mobile Toilet Units by 3 no. Cess Pool Car at Ganga Sagar Mela Ground, Kachuberia Point and Bus Buffer Zone for Maghi Purnima 2024 in connection with G.S. Mela 2024 (From 22.02.24 to 26.02.24)
Supply and delivery installation and commissioning of 01 set of 33 kV 4 panel indoor switchgear with VCB comprising 2 Incomers 1 Bus PT and 1 Outgoing and 01 set of 33 kV indoor VCB panel comprising 1 Line PT and 1 Outgoing
Constrution of Protective Works along Landslide affected stretch from Chainage 0.970 km to 2.030 Km , (5.00m x 5.00m size) Single Cell Box Culvert at chainage 1.100 km, Storm Water Drainage System from 1.400 km to 2.100 Km along the Road from Mal Bus
Supply and installation of Printed Wooden Frame Flex Banner for Creating Public Awareness on Water and Sanitation and General Health and Hygiene for 10 days at 10 nos. different Bus-Buffer Zones from Pailan to Kakdwip in/C with G.S Mela-2025.
Construction of Temporary Pandel and wooden platform for the period of 09.01.2023 to 17.01.2023 at Bus Buffer zone at Pailan Education Park in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela-2023 under South 24 Pgs H.W. Division P.W.(R)Dte
Painting Block Letters on the Toilet, G.I. Tank / P.V.C. Tank at different Bus Buffer Zone from Pailan to Kakdwip in connection with Ganga Sagar Mela -2024 under RWS,Alipore Sub-Division.PHE Dte. in the Dist. of South 24 Parganas under Alipore Divisi
Conducting detail survey at 10 nos. Bus Buffer Zone using total station survey instrument to show all existing on ground features and incorporating data as desired by EIC finally submitting six set of final drawing report in/C with G.S Mela 2026.
Painting Block Letters on the Toilet, G.I. Tank / P.V.C. Tank at different Bus Buffer Zone from Pailan to Kakdwip in connection with Ganga Sagar Mela -2025 under RWS,Alipore Sub-Division.PHE Dte in the Dist. of South 24 Parganas under Alipore Div PHE
Estimate for the Construction of concrete road at Pratappur Tamluk Panskura Bus road near Asthana to River Embankment near Rupdaypur Pry. School via Anupam Raigupta house with an approx length of 820 mtr at ward no-12 and 16 within Panskura Municipa
Construction of Temporary Pandel and wooden platform for the period of 09.01.25 to 17.01.25 at Bus Buffer zone at Pailan Education Park in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela- 2025 under South 24 Pgs Highway Division P.W(R)Dte
Supply, fixing commissioning of outdoor type LED strip light wrapping with steel tubular pole of overall height 11.0Mtr. From Box Bridge to SDF (via 215A Bus terminous and Ring Road), Street No.13 (College More to Godrej water side), Street no. 17
Conducting detail survey of G.S. Mela ground (Zone - I and II) and adjoining areas, Chemaguri, Benuban, Kachuberia, Bus Buffer Zone, Lot No. 8 and Namkhana Point as desired by E.I.C. in connection with G.S Mela 2024 under Alipore Divn, PHE (2nd Call)
Providing necessary strong Barricading on different roads for ensuring Durga Puja during the year 20192020 R and B Works Area D H Road ajanta Cinema Behala P S Bus No14 Stand Behala Tram Depot manton More Blind School on D H Road etc
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations icw Ganga Sagar Mela 2023
Overhauling, cleaning, servicing and checking of main LT cubical Panel comprised of 2 (two) nos. 2000A ACB as incomer and 1 (one) no. 2000A ACB as bus coupler installed at West Bengal State University, Barasat in the district of North 24 Parganas.
Construction of Cable Trench and Roll Out , Providing operational slab over cable trench and roll out, Concreting around the bus structure area and other allied civil works in the premises of Raiganj 33 11 KV Sub Station under IPDS Scheme of work
Construction of Temporary Pandel and wooden platform for the period of 09.01.25 to 17.01.25 at Bus Buffer zone at Century Ply Ground in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela- 2025 under South 24 Pgs Highway Division P.W.(R)Dte.
Restoration of age old hard cable used for running ABS pump of a 1 No ACB, Motor Control Panels with changing damaged 120 sq.mm Copper Power Cable, Cable Lead Sockets, Bus bars with Allied Works at TTPS under PBPS(S and D).
Construction of Temporary Pandel and wooden platform for the period of 09.01.2024 to 17.01.2024 at Bus Buffer zone at Century Ply Ground in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela-2024 under South 24 Pgs. Highway Division P.W.(R)Dte.
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations icw Ganga Sagar Mela 2023
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations icw Ganga Sagar Mela 2023
Construction of Temporary Pandel and wooden platform for the period of 09.01.2024 to 17.01.2024 at Bus Buffer zone at Pailan Education Park in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela 2024 under South 24 Pgs Highway Division PW(R)Dte.
AS PER NIT AND BOQ.
Please refer Tender documents.
Construction of Temporary Pandal with other allied works at Bus Buffer zone at Century Ply Ground in Bishnupur-I Block beside NH-117 for the period of 09.01.26 to 17.01.26 during Ganga Sagar Mela- 2026 under South 24 Pgs Highway Division,P.W.(R)Dte
Augmentation of 33/11 KV Transformer Capacity from (2, 6.3 plus 1, 5) MVA to (2, 10 plus 1, 6.3) MVA along with Extension of Transfer Bus and Shifting of 33 KV Bay at New Position at Laxmikantapur 220 KV Sub-Station. - 2nd Call
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela
Sinking of 01 nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela, PHE
Sinking of 01 nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela PHEd
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela