Loading…
Loading…
3,923 results • Best match
Proj No 332 2023 24 Div 25 Retarring of Ilavanthi Souhrida nagar vivekananda nagar road interlocking of palkulangara nagar kairali nagar MS nagar road and reconcreting of kairali nagar road
723/23-24,-Concreting and interlocking vadakkegramam lane vijay nagar lane zonal office oppside bylane vetirenary hospital side bylane chembakamoodu temple side bylane railway line moopanvilakam bylane in Kazhakuuttom ward
Pro No 756/2020-21TVPM Corporation Puthichyil road thodu side wall concrete road interlocking Ayanikadu reconcrete drain.thriveni gardens retarring,kuttichalkonam byeroad concrete Choozhampala drain slab.IndiraGandhi Library road concreting in Pathi
Pro No- 498/24, Construction of Karikkaramkuzhi AND Kochuputhuvalveedu drain, Construction of Sivapuri culvert, Durga lane- Parakode road, Sreebhadra Gardens, Shreyas Gardens, Kunnumpuram road concreting and Interlocking in Chellamangalam ward
PW3-53030/22Annual Plan-TCR Corp2022-2023 Ollur Zonal Div 29 INTERLOCKING TILE laying at Aryankulangara Water Tank road, Edakunny Village Vazhy-PRO NO 912/2022-23-General Civil Work
528/26- 27-Thrissur corporation vilvattom zonal Division 9 Panan lane First street Drain Cover slab Interlocking Maintenance work infront of Medical shop Panan lane road PLRA by lane Retaring-
GENERAL-Dist. Court complex, Vanchiyoor, Thiruvananthapuram-Construction of toilet inside the chamber of Additional subjudge, maintenance of tiled roof of Lawyers cooperative society building and interlocking works near the front and back side gates
Interlocking at road berm
RETARRING AND INTERLOCKING WORKS
INTERLOCKING RAINWATER PIT CONCRETING
Different Foot Path Interlocking
Chunkam Kallithodi Road iNTERLOCKING
INTERLOCKING AND DRAIN CONSTRUCTION
Road Retarring and Interlocking
ROAD CONCRETING INTERLOCKING WORKS
Interlocking ,concreting and landscapping
136 RATIONKADA MULLUVILA INTERLOCKING
Stair room construction, interlocking
INTERLOCKING AND CONCRETING WORKS
INTERLOCKING,BUILDING REPAIRNG WORK
Road interlocking and drainage
10mm Interlocking Tile work
Road reconcreting and interlocking
ROAD INTERLOCKING AND CULVERT
road concreting and interlocking
Road Retarring and Interlocking
arriageway worksScarification of existing bituminous layersWMM for road for a length of 1437m Prime coatTack coat 40mm MSS layer to be laid using pavers
Work Name PW2 12883 2020 Providing interlocking tile from NAD Road to KSEB post no KNP 49 along pipe line road in ward VIII and X of Kalamassery municipality Reach VI
State Plan-2022-23-Construction of a new open paddock with fence, boundary walls of trees , drinking water facilities and Providing interlocking type paving tiles near Goat shed at LRS, Thiruvizhamkunnu
PW1-53868/22Annual Plan-Thrissur Corporation 2022-23 Vilvattom zonal Division 4 Manalarkkavu street No3, Plavin koottam street No3, Padookkad western side bye lanes interlocking -Project No824/23-General Civil Work
Work Name P NO SO 100 21 22 Interlocking tile to Chalungal lane Kannammat Lane S N D P Lane and Protection Wall to Pradeeksha Nagar Bye lane in Ward 8
PROJ. NO.5/22 CONCRETING RECONCRETING INTERLOCKING RAINWATER PIT DRAIN CONSTRUCTION IN AISWARYA NAGAR KURUTHIKAMAN NAGAR PULARI NAGAR KARIMBAL ETC.AND MAINTENANCE OF SIDE PROTECTION WALL NEAR KUZHIYANI JN IN DIV 23
Project of Neyyattinkara Municipality 22 Proj No 69 Kand Krishi thoppu bye lane side drain and slab construction court road in interlocking and drain maintenance at vadakkekotta road in Fort ward
A n n u a l P l a n - 2 5 0 / 2 5 - P A V I N G INTERLOCKING TILE TO MOIDU ROAD IN WARD 12 KADAPPURAM GP
S-71/25 Interlocking Tile Paving and Repalce dameged Cover Slab at Elenjikkal bye Lane, Kottavalappu Lane, Vadathazha bye Lane, Back side of Police Quaters and Meccancy Garden in Division-1
Proj no. 484/24-25 CZ1 Din.46-PGR Compound bylanes Rits Hotel side to Kollam thodu side road balance work, opposit side of petrol pump to railway line lane interlocking
GENERAL-General education-contingency Assistance for sustenance of school infrastructure for GLPS athippatta-Construction of lean to roof auditutorium and interlocking in front of main block, GLPS athippatta-General Civil Work
PW1-51195/22Annual Plan-Thrissur Corporation 2022-23 Vilvattom zonal - Division 5 Completion of Evannur Peringavu Thenkulangara road inter locking and Sree rag lane interlocking -Project No605/23-General Civil Work
GENERAL-New Court Complex building - Yard Interlocking balance work --Providing balance interlock paving to back and side yard of new court complex Manjeri and plumbing works. ( Phase-II)-General Civil Work
Tender No 16 Annual Plan CHMD GP 22 23 Renovation of Balance Portion Interlocking Tile Kallumkkoottam Colony Road In Ward 4 Project No CHMD 156 22 23 General Civil Work 2
Work Name PW1 2145 2022 Construction of Drain Slab and Interlocking Tile at N H A K G Cross Road and Bye Lane of A K G Road in Ward 31
Scarifying the existing bituminous road surface, WMM for low lying portion, Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40, RCC Grade M20, Dismantling of existing structures, PCC Grade M15 for drain
SO248 23 Reconcreting of Sagarika Bylane V R Thankappan Road Junction and DrainMaintenance Relaying interlocking tile on Rainbow Garden RoadPalakkaparambil Road and drain maintenance in w29 of Kalamassery Municipality G
House maintenance (19 Nos), Samskarika nilayam-maintenance and electrical works, Compound wall Construction, Pond Renovation, Pipe line works, paving block in road, Rain water harvesting tank, Solar panel light on compound wall-26 Nos
LAC-ADS-MLA-ADS 2020-21-Providing interlocking tile in Chakkalappadam road and 2nd cross road and Nechikkattukkavu Temple road side protection and tile work in Thrikkakkara Muncipality-In-General Civil work.
Proj. No.72 Div.16 Renovation of Drain at backside of municipal colony and Interlocking and concreting in sreedurga nagar , sreebhadra nagar, janani nagar, sneha nagar and gurudeva nagar in uliyakovil east.
PW1-51197/22Annual Plan-THRISSUR CORPORATION 2022-23 VILVATTOM ZONAL DIV 05 PANDIKKAVU 2ND STREET DRAINAGE, COVER SLAB, TARRING AND PANDIKKAVU 2ND STREET FIRST BILANE INTERLOCKING-Project No1532/23-General Civil Work
Proj.No.191 Div 14 Retarring Reconcreting Interlocking Construction maintaince of Drain construction of rain water pit in sreekrishna nagar, asramam gardens nagar, sarayu nagar navodhya nagar lakshmana nagar gandhi nagar asramam nagar
PW2-67108/22Annual Plan-Thrissur Corporation 2022-23 Vilvattom zonal Division 5 Renovation works to Govt. Dispensary at Ramavarmapuram - bath room, compound wall, painting, interlocking etc Project No763/23-General Civil Work
Project No- 474/25-26-K K Road Puliyalil Plavarakonam Road Chembuvilakom Road Venchavode Gandhipuram Chilambil Road Valiyaveedu Devi Temple Road Menalloor Residents Pravasi bylane Concreting Interlocking and Tarring in Chempazhanthy Ward