Loading…
Loading…
3,923 results • Best match
Cross drainage work of 15 m cover slabs at Starting portion is essential Interlocking cement concrete bock paving tile for 300 meter 10cm thick GSB drainage layer for 250m and 15 cm thic
Earth work excavation Quarry muck filling PCC RCC Centering Shuttering Steel reinforcement Filling dept earth Laterite masonry Aluminium work for doors and windows Solid block masonry plastering painting Vitrified floor tiling Interlocking etc
The estimate includes provisions for providing interlocking Tile for 284m and edge concreting in PCC grade M20. ALso provisions are provided for laying GSB in eroded portions and provision for pipe culvert work
Road work including Excavation for road work in soil, ,Scarifying existing bituminous road surface, Construction of GSB ,WMM , BM and BC , Supplying and laying interlocking tile, Traffic safety works ,Culvert and Drain etc
Dismantling roof tiles Cleaning reinforcement Steel work for purlin trusses GI sheet roofing Taking out door shutter Vitrified tiling Earthwork excavation Quarry muck filling Solid block masonry Interlocking Plastering Renewing glass planes Painting
BENZENE UNLOADING HOSE METALLIC HOSE: 3" NB x 3 METER LENGTH, CAUSTIC UNLOADING HOSE METALLIC HOSE: 2" NB x 5 METER LENGTH, SS316 CORRUGATED JACKETTED TYPE FLEXIBLE METALLIC HOSE WITH DOUBLE BRAIDED INTERLOCKING.
ROAD MAINTENANCE
Construction of compound wall
Interllock
This estimate propose an interlock-tile road on WMM and quarry muck filling Construction of road consist of filling Quarry muck, WMM, supplying and laying interlocking tile, M20 side concreting, inaugration stone, man mazdoo
Supplying 36mm, 12mm, 6mm, Filling up pot holes, OGPC 20mm, Scrarifying, GSB, Interlocking tile 100mm, Earth work excavation, PCC 1 3 6, RCC Grade M20, HYSD bar, Engaging coolie, RCC Grade M20-(without formwork)
Excavation, Clearing and grubbing road land, Scarifying, Wet MixMacadam, interlocking tile, granular subbase, primer coat, tack coat, bituminous macadam,BC, bituminous concrete NRMB, traffic safety work, supplying and stacking 36 mm, FUP, Drainage Fa
CIVIL WORKS
RETARRING
Concrete kerb, Interlocking tile, Steel pipe railing, Retro-reflectorized sign boards, Synthetic enamel paint, Thermoplastic compound, Road studs, Epoxy painting, Excavation, Dismantling culvert, PCC1 3 6, PCC M20, PCC M15, RCC M20, HYSD bar etc.
Clearing, filling up pot holes, GSB, WMM , BM, BC, Interlocking Tile,drain and irish drain , Dry Rubble masonry, P.C.C, RCC Raft foundation, Abutment, wingwall, parapets slab are provided for culvert construction, traffic safety measures works
Earth work excavation RR laterate and solid block masonry Quarry muck filling RCC work TMT steel reinforcement Aluminium works Plastering Painting Tiling Interlocking Structural steel work providing fibre ceiling water supply and sanitary works etc
Length of 1800m surrounded by Shrimp farm Includes 350 m long gabion side protection wall Ring bund with coconut piles side filling using quarry muck filling and WMM Interlocking tile work for shoulder portions etc
The proposed project involves the reconstruction of a small stretch of the retaining wall, painting of building, interlocking tile paving, and other repair works for the staff quarters building at the Thommankuthu Eco Tourism Centre.
In this estimate provision for removing damaged soil from pit area and strengthening road base course using GSB,WMM are included. in open pit areas M40 grade interlocking tile is proposed along with side concrete
The scope of the work includes maintenance of 50 no of houses which includes plastering, floor finishing works with vitrified tiles, providing doors and window frame and shutters,laying of roofing sheet with truss work,Road works using paver tiles
road interlock paving and maintanance
Road work
Road work including Excavation for road work in soil and hard rock, Filling up pothole , bitumen levelling course ,GSB,WMM, 40 mm pre mix CC . Interlocking tile , Concrete road Drain and Protection works ,Road safety works
Road work including Excavation for road work in soil, Excavation for road way in hard rock , Scarifying existing bituminous road surface ,GSB ,WMM ,BM and BC, Traffic safety works, Interlocking tile ,Culvert and CC works etc
Scarification of existing road is proposed and filling with GSB, WMM, priming coat, tack coat, BM and BC is proposed for a length of 330 m. Interlocking foot path, side protection are included in this work
Earth work excavation CC 1 4 8 Centering shuttering RCC work Steel reinforcement Interlocking Plastering Demolishing brick work and stone rubble masonry RR masonry Solid block masonry Painting with deluxe multi surface paint Quarry muck filling
In this proposal items for providing M40 interlocking tile for 155m length and 3.6m width along with scarifying, earthwork and GSB for locations where there is no base course and side concrete of tile is proposed.
The work includes painting exterior and interior walls ceiling melamine polishing synthetic enamel painting repair of toilets and sanitary arrangements new septic tank with soak pit repairing of interlocking tile GI sheet roofing with truss work
Provision for dismantling roofing sheet in porch area, GI sheet roofing,cupboards using aluminium and hylem sheet, interlocking tile in front and side yard,Toilet repairing,Ceramic tile,WC European,Wash and necessary pipe fittings etc
Provisions has been included in this estimate are relaying interlocking tile in front portion,repair for plumbing works on each floors,disposal of waste and other debris material from the complex, engaging labour for cleaning etc
Concrete kerb, Interlocking tile, Steel pipe railing, Retro-reflectorized sign boards, Synthetic enamel paint, Thermoplastic compound, Road studs, Epoxy painting, Excavation, Dismantling culvert, PCC 1 3 6, PCC M20, PCC M15, RCC M20, HYSD bar etc.
Earth work in excavation of foundation Construction of dry rubble flooring at cross drainage Plain cement concrete PCC Grade M15 RCC Grade M20 PCC Grade M20 Supply fitting HYSD bar Supplying and laying interlocking tile 80mm
In this estimate includeclearing and grubbing, Earth work, pot hole filling using 36mm metal, leveling undulations with 12 mm brocken stone, GSB, Interlocking tile, Irish drain, Construction of culvert and chappaths, DR masonry retaining wall etc
supply of 36mm 12mm metal and FUP, 20 mm thick close graded chipping carpet laying interlocking concrete block, Provisions for clearing chocked up culvert, drain to avoid the water stagnation, filling potholes using ready made bituminous compound,
Reconstructing the collapsed compound wall and adjascent portions for a legth of 25m is proposed in this work along with strengthening of other portions.cutting trees,sanitary works such as cleaning septic tank,interlocking tile work etc included
Please refer Tender document
Electrification Work
filling up pot holes and levelling course using 36mm metal, 20 mm thick close graded chipping carpet, WMM raising in more damaged portions etc. Interlocking paving tile and M20 grade tile locking is provided in more damaged portions
provisions are earth work excavation, supplying 36 mm metal, filling pot holes, tack coat, close graded carpet, GSB for tile laying, scarification of road ,M40 interlocking tile ,side locking M20 concrete. Irish drain is proposed at water loggd
The estimate for widen the minimum carriage way width is maintain 5.00 mtr with close graded, reconstruction of two culvert, road safety measures, EW, Interlocking tile,cement concrete Cross drain and Drain with cover slabs are also proposed.
G E N E R A L J F C M M a t t a n n u r Y a r d Interlocking balance portion of JFMC Mattannur and Painting of JFMC Quarters General Civil Work
Dismantling of existing structures like culverts Providing and laying stone Pitching on slopes Plain cement concrete 1 3 6 Dry Rubble masonryWMM RCC Grade M20 HYSD bar Reinforcemen Supplying and laying interlocking tile 100 mm Solid block mas
BM and BC with 4.5 m avg. width, widening and strenthening with GSB and WMM, prime coat and tack coat, BM and BC,Drain works , irish drain , Retaining wall works,culvert reconstruction work , Interlocking Paveer block traffic safety works
cutting Ordinary and hard hill side rock for 240m length and Interlocking tile for parking bay .A U drain with cover slab is proposed as seperation from Parking bay with the existing carraige way. DR retaining wall for 660m
The culverts at ch 3750 had undergone severe damage and they need urgent reconstruction PCC bed M15 abutment and M20 slab with HYSD bars are provided for culvert construction and interlocking tile were provided in the approach road for