Loading…
Loading…
9,882 results • Best match
Construction of Paver Block road from 2.5 mile chowpathi to Kumtir ghat via Nirmal Ray house at 12/94 under Parerpar GP within Alipurduar I block in the district of Alipurduar in the year of 2025-26
Construction of Paver Block Road from Bhola More to H/O Kamini Barman via Bhandanidanga SSK, Part No. - 13/81 at Deogaon GP under Falakata Block in the District of Alipurduar in the Year of 2025-26.
Construction of Paver Block Road from House of Akabar Miah to Dharmer Bazar via Digalhati SSK, via House of Babar Ali Mia, Under Moyamari G.P. within Coochbehar- I Block in the District of Coochbehar (Length 2770.00 m,)
Annual Maintenance with sweeping and cleaning of 2 -Storied Toilet Block, Play Zone, Open Air Theatre with Gallary, Ghat, Paver Block Pathway, Granite Walkway, Grass Lawn, GHAT with Steps, Pavement infront of GHAT, gardening, etc all complete
Kamarpukur-Krishnaganj Road from ch.0.00 kmp to ch.12.894 km (except 200m rigid pavement) and Mathura-Bakultala (Vikdas) Road from ch.0.00 kmp to 8.00kmp (except 350m paver block portion), Surfacing work under HHD-I, Hooghly.
Construction of Paver block road from Churaman Natun Bazar to Ramnagar under Kapasia GP. under Itahar Block in the district of Uttar Dinajpur. (Total Length-3.1 Km, Width-3.75 M. Protection Work Drum Sheet piling-200.00 M)
The Construction for Laying of Paver Block and Drainage work and a small Shade work in front of newly constructed (Renovated) Meeting Hall and other related works at Regional Office premises under WBTDCC Ltd, Regional Office, Purulia.
Repairing of Road by Paver Block from H/O Mulchand Jain to H/O Babulal Baid at Ward No-8 under APAS for Booth No. 32/31 Scheme ID APAS/01/032/31/0001 of Dalkhola Municipality
Construction of C .C. Road with Paver Block Pavement from the H/o Raj Kumar Saha to the h/o Gour Singha at Lokenath Pally in ward No 04 under Dhupuri Municipality out of fund 14th F.C.
Construction of new A site Retail Outlet with facilities like Sales Building , Canopy ,Paver block driveway and other allied civil electrical works at location On left hand side From Sajur more to Chander More on NH34 ,DistMurshidabad ,
Construction of Paver Block Road from Ushaharan Bridge to Amsari FP School via Kachna more under Baruna GP, Kaliyaganj Block in the dist. of Uttar Dinajpur. Total Length- 1.790 Km, Protection work (Eucalyptus-Bullah Pilling) 150.0 Mtr
Dighirpar Muchisa Road from 0.00 Km to 0.080 Km for the work of strengthening by paver block of damaged Mastic Zone in the district of South 24 Parganas under Diamond Harbour Highway Division P. W. (Roads) Dte
Construction of Paver Block Road from house of Sanjoy Saha to Saitantala Tepothi via Maa Kali Brick Field of Rampur - II Gram Panchayat Under Tufanganj - II Block in the District of Coochbehar During the Year 2023-24 .
Construction of Paver Block Road with Protection Work and Cross Drainage Work from Dakshin Kishamat MP School to Amar Barman House under Kishamat Dasgram G.P. at Dinhata - II Block in the District of Coochbehar. (Length 1630.00 m )
LAYING OF PAVER BLOCK AT RAMMOY ROAD (PORTION) NORTH SIDE FROM 1 BY 2 TO 5 BY 3 RAMMOY ROAD AND SOUTH SIDE FROM 1 TOWNSHEND ROAD TO 2 BY 8 RAMMOY ROAD IN WARD NO 72.
Construction of a paver block approach road connecting the sub-station building and generator shed (under construction) at SKBU, Ranchi Road campus Purulia under Purulia Sub Division PWD of Purulia Division PWD during the year 2021-2022.
Raising main connection between Pump house No I II including internal network culvert crossing arrangement of fire hygranT laying of 250mm OD HDPE pipeline 150mm dia. DI pipeline alongwith construction of boundary wall paver block pathway at
Construction of Paver Block Road from Hisabyatari Primary School to Sainal Mia House under Putimari-I G.P. at Dinhata -I Block in the District of Coochbehar During the Year 2023-24 . (Length 1640.00 m , Width 3.75 m).
Construction of Paver Block road from Rupahar NH12 Ashram more to Belul under Birghoi GP, Raiganj Block in the district of Uttar Dinajpur.( Total Length- 2.830 Km, Width- 3.75 Mtr, Protection Work- Drum Sheet Pilling- 200.0 Mtr.).
Construction of Paver Block road from Raimatang Tea Factory to Jairam Lohar House via Diwakar Thapa-s House under Kalchini G.P., Kalchini Block in the district of Alipurduar in the year of 2024-25 (Length - 2200 m).
Pot holes repairing work with Cement Concrete and Paver Block in Chotilal Mishra Road, Hasna Bibi Lane, C Road, Gangadhar Bhattacharya Lane, Nabin Ghosh Lane, Krishna Taran Naskar Lane, Sambhu Halder Lane, Aurobindo Road, Bajal Para Lane
Upgradation of Existing C.C Road With Paver Block from Palir More main road to Bill Par ,Pradip Mjumdar house to Kali Mandir, Nimai Sill house to Babon Basu s house in Ward numer -15 under Sainthia Municipality.
RESTORATION OF PAVER BLOCK AND IPS FOOTPATH AT 18A/1A, 16D M. P. ROAD AND 1/34B PRINCE GOLAM MOHD ROAD AND OTHER DIFFERENT PLACES IN WARD NO- 84 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
RESTORATION OF PAVER BLOCK FOOTPATH DISTURBED BY AIRTEL, CESC AND WATER SUPPLY AT 11,3 C.R. AVENUE, P-16,4 BENTINCK STREET,20 G.C. AVENUE,34A TO 32B LENIN SARANI ETC AND ITS ADJACENT AREA IN WARD NO-46
Urgent repair of security room and replacement of damaged boundary wall and paver block at different location and other ancillary works at doctors and nurses quarter of Dabur Math campus, Kolkata-700033 during the year 2025-26 .
REPAIRING AND RENOVATION OF PAVER BLOCK PASSAGE WITH ALLIED WORKS TO PREVENT ROAD DUST AT VIKU LANE NEAR H/D NO- S-208,S-31/1,S-45,S-5 ETC IN WARD NO-137, BR XV.
Strengthening of road side flank by laying concrete paver block at Garia-Boral-Rajpur Road (ch. from 0.00 kmp-0.500kmp) with allied items of works under South 24 Parganas Division during the year 2018-2019 (RnB works)
Construction of Road Side Drainage System and Concrete Paver Block Laying Infront of Burdwan South Highway Division Office Compound, under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. during 2023-24
REPAIRING OF IPS AND PAVER BLOCK PAVEMENTS, ASPHALTUM ROAD, KERB CHANNEL (DISTURBED BY WATER SUPPLY DEPTT. AND OTHERS) AT 21 BAG BAZAR STREET,34 NABIN SARKAR LANE AND OTHER AREAS IN WARD NO-007 UNDER BOROUGH-I.
Construction of Paver Block Road from House of Dineshwar Debnath to House of Bikash Debnath Under Haribhanga G.P. of Cooch Behar-I Block in the District of Coochbehar During the Year 2023-24 . (Total Length 2000.00 m )
Construction of Paver Block Road from Dinesh Ghat bridge to Tilakhya Barman house Part no- 13/89 and 13/81 within Deogaon GP, under Falakata Block in the district of Alipurduar in the Year of 2024-25.
Construction of Paver Block road RSJ Bridge over river Baniadaha to Narayanganj B.O.P. at Narayan Mauja under Gitaldaha-I G.P. within Dinhata-I PS in the district of Coochbehar in the year 2022-23 Length-280 Mtr
Construction of Paver Block Road With Protection Work from Chander Bazar to Fhani Barman House, under Chowdhuri Hat Gram Panchayat and Sukarur Kuthi Gram Panchayat at Dinhata-II Block in the District of Coochbehar .(Length 1415.00 m)
Construction or Paver Block road from Kadamtala PWD road to Ray Road from the H/O Kanu Ray house under Khoardanga-II G.P within Kumargram Block in the district of Alipurduar in the year of 2024-25
Constuction of Paver Block Road from house of Dulal Barman to Torsa River Kali Mandir under Madhupur G.P., Coochbehar - II Block in the District of Coochbehar During the Year 2023-24. (Length 1740.00 m , Width 3.75 m).
Construction of Paver Block road from Akhil Roy house towards Tapash Mitra house at Uttar baro Haldibari G.P., Haldibari Block in the District of Cooch Behar During the year 2023-24. (Length 1100 m, Width 3.50 m)
Construction of Paver Block Road from battala towards Dolong river via Baburdanga 5th Plan Primary School under Unishbisha G.P. of Mathabhanga - II Block in the District of Cooch Behar During the Year 2023-24 . (Length- 1500 m).
Construction of paver block road from Oodlabari Sunil Dutta Smrity Girls High School more to near Manabari Primary School more within Oodlabari G.P. under Mal Block in the District of Jalpaiguri. (length- 2300.00 m, Width- 5.00 m).
RESTORATION OF CEMENT CONCRETE AND PAVER BLOCK PASSAGE WITH ALLIED WORKS TO BE DISTURBED BY CESC LTD. FOR CABLE LAYING WORK AT R-83 TO R-122 ETC, S.A. FAROOQUE ROAD IN WARD NO-137, BR XV.
RESTORATION OF PAVER BLOCK AND IPS FOOTPATH AT 209 GARCHA RD,GARIAHAT RD, P-380,P-411/14,29/B KEYATALA LN,5/A DOVER LN,198/2,172/5 R.B.AVENUE,P-562 LAKE RD ETC.IN WARD NO-086.
RESTORATION OF PAVER BLOCK AND I.P.S FOOTPATH AT 24A,28/3/4,22/2A,23A N.B LANE,4,7 ANDUL RAJ RD,23B PARK SIDE RD ETC IN WARD NO-84 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
Paver block pathway towards the newly construction PWD (Electrical), PWD (Social Sector) office building frm main entry gate in PWD Campus under Hooghly Construction Sub Division-I ,P.W.D. under Hooghly Construction Division,P.W.D during the year of
Construction of RCC Box Culvert near Marriage Hall and Hatat Coloney with 2 sides Approach Paver Block Pavement at ward No. 10 within Dhupguri Municipal area under Paray Samadhan Abhiyan of Government of West Bengal UID JPG012
RESTORATION OF PAVER BLOCK and IP SURFACE AT RAJA RAJ KRISHNA ST,BIDHAN SARANI,SIKDER BAGAN ST,KHUDIRAM BOSE ROAD,SIBDAS BHADURI ST.,GANENDRA MITRA LANE, APC RD ETC IN WD NO-11 DISTURBED BY C.E.S.C LTD.
CONSTRUCTION FO PAVER BLOCK ROAD FROM BUDDHA LAMA S HOUSE DILKUMAR LAMA S HOUSE OF PART NO 21/230 PRAYAGPUR UNDER BANARHAT-II GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/021/230/0006)
CONSTRUCTION OF PAVER BLOCK ROAD FROM DIL KUMAR PRODHAN S HOUSE TO DEVI MANDIR OF PART NO 21/230 PRAYAGPUR UNDER BANARHAT-II GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/021/230/0007)
Construction of Paver Block Road from Bipul Barman House to Balai Haldar House under Gosanimari-II G.P. at Dinhata-I Block in the District of Coochbehar During the Year 2023-24 . (Length 1970.00 m , Width 3.75 m)
Construction of Paver Block Road from Maira Bridge Samsan Ghat to Sonardham Junior High School within Mairadanga G.P under Falakata Block in the district of Alipurduar. In the Year of 2023-24 (Length -1800m and 3.75m width).
Construction of Paver Block Road With Protection Work and Cross Drainage Work from (Moktarer Bari) Hospital More to Mukul Barman House under Kishamat Dasgram G.P. at Dinhata - II Block in the District of Coochbehar. (Length 1890.00 m )
RESTORATION OF I.P PASSAGE, AND PAVER BLOCK FOOT PATH DISTURBED BY CESC LTD. AND OTHER DAMAGED PORTION NEAR P-27/B CIT RD SCH LII , 60/1/A NANI GOPAL ROY CHOWDHURY AVE ETC IN WD-55