Loading…
Loading…
9,883 results • Best match
RESTORATION OF PAVER BLOCK AND IPS ON FOOTPATH NEAR 31/A, 3/1/2A, NAKULESHWAR BHATTACHARYA LANE AND 11/L, 121/5C, M. P. ROAD ETC IN WD NO.84 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
Lakshmikantapur Dhola Road, Strengthening Work by Paver Block in different Stretches of damaged Mastic Zones(1500 mtr) in the district of South 24 Parganas under Diamond Harbour highway Division, PW(Roads) Dte. (Materials supply by the agency) Projec
Construction of Paver block road from 4th mile bus stop to Pariyamohan Sangha via H/O Ananta Das under Mairadanga G.P within Falakata Block in the district of Alipurduar in the year of 2024-25 (length -1600 m).
Patch reparing at 1)Puillya, 2) Netaji Nagar, 3) Udayan, 4) Rabindra Nagar, 5) Shakti Nagar, etc. and others Lane/Road by cement concrete work and laying paver block with in adjacent area Ward no. 46 under H.MC.
Construction of Paver Block road from PMGSY road to Badher par Mantu Miya house via Malek Miya house and House of Paban Das under Ruidanga GP, Mathabhanga-II block in the district of Cooch Behar. (Length - 2400 m)
REPAIRS TO BUSTEE PASSAGE (IP AND PAVER BLOCK) AT 13,16,4 TO 9 PANDITIYA ROAD, 122/1D,128,129,,137 MLN RD, 1/3,1/4,1/5 MONOHAR PUKUR 2ND LANE, 16 TO 20 DOVER TERRACE ETC IN WARD NO 85
REPAIRING OF C.C PASSAGE AND PAVER BLOCK PASSAGE WITH ALLIED WORKS AT VILLAGE ROAD ,AKSHAY KANAN LANE ,SARDAR PARA NEAR PREMISES NO J2/9 J353/A/2, J152 ETC IN WARD NO-133, BR XV UNDER SLUM AREA.
Development of new A site KSK with facilities like Sales Building Paver block driveway and other allied civil and electrical works at location within 2 KM of Barchira More on Hatuganj, Dist 24 PARGANANS SOUTH under Kolkata DO
Repairing of Flank and Carriageway (Only Paver Block Portion) Damaged due to laying Electricity Network (Micro-Tunneling from 0.80 km to 3.80 km) of Garia Railway Station to Gangajoara Road by WBSEDCL under South 24-Parganas Highway Division.
Construction of Paver Block Road with protection work and cross drainage work from Vera Masan Path to Jatin Sarkar house Under Chilakhana-I Gram Panchayat at Tufanganj - I Block in the District of Cooch Behar. (Length-2300.00 m)
Construction of Guard wall and C.C.Road with paver block starting from I) Dilip Roy to Khudaru Roy II) Raju Paswan to Md. Alam III) Kartik Biswas to Bhagat Paswan and different places at Swami nagar at W.No 7
Construction of Paver Block road from Club Chowpathy to the house of Birsa Oraon, Khakri Line Part no-12/70 under Mathura GP within Alipurduar I block in the district of Alipurduar in the year of 2025-26
Construction of Paver Block Road with Drain from Kalimata Cycle Store to the h/o Manoj Singh Via Babai Paul Pally in ward No.- 14 under Dhupuri Municipality. out of fund 15th FC out of fund 15th FC
Patch repering at 1) Balitikuri Khal dhar para, 2) Balitikuri Dhara Para, 3) Balitikuri Baidyanath Dutta Sarani etc others lane/Road by cement concrete work and laying paver block with in adjacent area Ward no. 50 under H.M.C.
CONSTRUCTION OF PAVER BLOCK FOOTPATH AND UPGRADATION OF SURFACE DRAIN AT i) DAKKHINPARA TO ARJUNPUR KHALPAR,ii) SATGACHI MILAN SANGHA TO DAKKHIN PARA AND iii) ARJUNPUR BRIDGE TO SUBHANGI RESIDENCE WITHIN -26 UNDER SOUTH DUM DUM MUNICIPALITY (SDDM)
Construction of Paver Block Road from PWD road via Duthkhawagachh Bridge connecting PWD Road Duthkhawagachh Bridge at Khalpara Sansad, Chathat Bansgaon Kismat GP and Phansidewa Block in the District of Darjeeling (Length-2.20 Km and Width-3.00 M)
RESTORATION OF IPS AND PAVER BLOCK SURFACE AT 19 GOABAGAN STREET,GORACHAND BOSE RD, BEADON ST., KARBALA TANK LN,CHANDI BARI STREET AND OTHERS DISTURBED BY CESC,W.S DEPTT AND NATURAL WEAR AND TEAR IN WD NO.16
Construction of New Paver Block Road with C. C. Guard Wall from Tarani Kanata Roy to H/o Babul Rahaman at ward No.- 10 within Dhupuri Municipality. under CMRO Grievance, Govt. of West Bengal, OUT OF FUND DMAS ,
Development Support of Amta Auditorium Hall (Phase-VII) (Construction Boundary Wall, Toilet Block, Paver Block, Mural work,Outside Decoration work of Amta Auditorium Hall, under Amta-I Panchayat Samity,Amta,Howrah. under BEUP of177, Uluberia (N)23-24
Nandakumar Bazar Road from 0.200 Km to 0.375 Km repairing of damaged brick stitching portion by Concrete Paver Block under Tamluk Highway Division in the District of Purba Medinipur during the year 2021 2022. Ch. To Non Plan
Balance work for construction of road with 80 m.m thick colour decorative M-40 paver block in connection with renovation, beautification landscaping work of Joyrampur Temple Compound under South 24 Parganas Division, P.W.D during the year 2020-2021
Construction of Concrete Paver Block Road from Abdul Malik House to Danro Khari at Rampara Chenchra GP and Construction of Cement Concrete road from Brijihat to Kayepara via Dorghapara Chowmukh at 2 No. Ajmatpur G.P under Tapan Block
Sautanchak Tengrakhali Road from 5.030 Km to 5.315 Km repairing of damaged stone brick portion by Concrete Paver Block under Tamluk Highway Division in the District of Purba Medinipur during the year 2021 2022. Ch. To Non Plan
Construction of New Court Building at Tamluk Court Compound, Tamluk in the District of Purba Medinipur (Balance Work) - (SH - Construction of D.G. Shed, Cable Trench, Road side railing, Partition wall, Paver Block etc.) at Tamluk Court Complex, Tamlu
CONSTRUCTION OF PAVER BLOCK ROAD FROM THE HOUSE OF ADHIR DAS TO THE HOUSE OF THAKUR DAS SHIL AT LANGALGRAM PART NO 158 WITHIN BAROKODALI-I GRAM PANCHAYAT UNDER TUFANGANJ-II PANCHAYAT SAMITY ACTIVITY CODE- 127371164 (2025-26)
CONSTRUCTION OF ROAD AT BANARHAT NEAR BANARHAT STATION ROAD TO RAIL GATE WITH PAVER BLOCK. PART NO-15/11 UNDER BANARHAT -L GRAM PANCHAYAT WITHIN BANARHAT DEVELOPMENT BLOCK. SOURCE OF FUND -PBG ( IBRD )/2021-22 ACTIVITY CODE -48915962
CONSTRUCTION OF PATHWAY ALONG THE BANK OF TOLLYS NULLAH FROM GITANJALI METRO TO USHA BRIDGE BY CONCRETE PAVER BLOCK INCLUDING ALLIED BEAUTIFICATION WORK IN CONNECTION WITH POLLUTION ABATEMENT OF TOLLYS NULLAH IN WD NO100 BR X UNDER KMC
RESTORATION OF PAVER BLOCK, I.P, C.C SURFACES AT 66, 42B B.K PAUL AVN,78/8,78/3 NIMTALA GHAT ST,15P NIMTALA LANE, BABURAM GHOSH LN AND OTHERS IN WD NO-020 DISTURBED BY CESC AND OTHER P.U AGENCIES
Construction of Paver Block Road and Drain from House of Sukriti Barman to House of Niranjan Roy at Shyamaprasad Colony under Guriahati-II G.P. at Cooch behar I-B Block in the District of Coochbehar. (Length-830.00 mtr)
Construction of Paver Block Road from the House of Utpal Barman to Khagribari Chowpathi, Under RampurII Gram Panchayat at Tufanganj- II Block in the District of Coochbehar During the Year 2023-24 . (Length 1030.00 m , Width 3.75 m).
Construction of Paver Block Road from Ghorar Bazar Pachkolare Gor via River side via Pradip Barman House to Tripen Barman House, Under Haribhanga Gram Panchayat at Cooch Behar- I Block in the District of Coochbehar. (Length 2120.00 m).
RESTORATION OF PAVER BLOCK AND I.P.S. PASSAGE DISTURBED BY C.E.S.C. AT TIKIA PARA, KASAI PARA, PAHARPUR ROAD BYE LANE ETC. N/H/NO. P-109, H-63, H-95, I-81 ETC. IN WARD NO.-135, BR.-XV.
Construction of new A site Retail Outlet with facilities like Sales Building , Canopy ,Paver block driveway and other allied civil and electrical works at location From Gamira to Deucha on NH60 ,Dist Birbhum , State West Bengal under DurgapurDO
Construction of Paver Block Road from Praneshwar Chowpathi to Ambari bazar via Agragami Club, Barokodali- II Gram Panchayat at Tufanganj- II Block in the District of Coochbehar During the Year 2023-24 . (Length 2000.00 m , Width 3.75 m).
Construction of Paver Block Road from Narendra Nath Roy house via Bhuchungmari Govt. Primary School to West Panisala Bath Tala under Natabari-I Gram Panchayat at Tufanganj-I Block in the district of Cooch Behar (Length-2060.00 m).
RESTORATION OF PAVER BLOCK AND IPS PASSAGE DISTURBED / TO BE DISTURBED BY DIFFERENT P.U.AGENCY AT RAMESWARPUR ROAD, DHANKHETI AREA ETC. N/H/NO. P-188,G-11,I-23,H-117 ETC IN WARD NO-135,BR-XV.
RESTORATION OF IPS AND PAVER BLOCK FOOTPATH AT 206/1,190/A R.B. AVE. P-380,P-387,P-353/C KEYATALA LN,61B/A ,54/3HAZRA RD,32C LAKE RD,66 PURNA DAS RD ETC.IN WARD NO-086.
RESTORATION OF PAVER BLOCK AND IPS ON FOOTPATH NEAR 28/1/5B, 21/B N B LANE, 77 S P MUKHERJEE RD, 14 D P WEST ETC. IN WD 84 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
Dr B C Roy PGIPS Hospital Supplying fitting and fixing industrial troughed Aluminium sheet with M.S Structure repair of Aluminium window pathway concrete work with paver block and allied works at Annex Building during the year 24 25
RESTORATION OF PAVER BLOCK,IPS AND CC PASSAGE DISTURBED BY DIFFERENT P.U. AGENCY AT G.R. ROAD, MUDIALY ROAD BYE LANE ETC. N/H/NO. I-3,P-89/2,H-126 ETC. IN WARD NO-135,BR-XV.
RENOVATION OF IP AND PAVER BLOCK SURFACE AT 5C, BALLAV STREET TO 1/1, BALLAV STREET AND 23, R.G KAR ROAD TO 22/2, MAHATMA SISIR KR SARANI, IN W-12, UNDER A.C-167, PART-1, BR-II.
RESTORATION OF I.P.S. and PAVER BLOCK PASSAGE AT BYE LANE OF PAHARPUR ROAD, BENGALI BAZAR ROAD, RAMESWARPUR ROAD ETC.N/H/NO. I-40,P-213,P-215/A,B-40/1 ETC. IN WARD NO-135,BR-XV.
Chilakhana Natbari road at 2.90m restoration work of road surface by providing paver block and repairing of Hume Pipe culvert and allied works due to damage by PHE during laying of pipe line under Cooch Behar Highway Division
RESTORATION OF PAVER BLOCK PASSAGE WITH ALLIED WORKS AT BATTIKOL 2ND LANE , FATHEPUR VILLAGE ROAD,MEHER MANZIL LANE NEAR PREMISES NO G231 J21/E,G223, G326 ETC IN WARD NO-134 BR-XV (DISTURBED BY WATER SUPPLY DEPTT).
DEVELOPMENT OF IPS AND PAVER BLOCK PASSAGE/FOOTPATH TO REDUCE DUST AND FREE MOVEMENT OF PEDESTRIANS AT 6/1 RAMDHAN KHAN LANE,17 NB ST. TO 115 BT. ST,B.K PAL AVENUE,SOVABAZAR ST IN WARD NO.19 .
RESTORATION OF PAVER BLOCK FOOTPATH ,I.P AND CONCRETE PASSAGE DISTURB BY P.U.AGENCY AT DIFFERENT PLACES SUCH AS 20/B ,30 G.C.BOSERD. 21,24 DR SURESH SARKAR RD 32B S.G.ST. 3,28S.S.A.RD GOPE LN.43,50 M.I LN. ETC IN WD-54
RESTORATION OF PAVER BLOCK AND IPS ON FOOTPATH NEAR 1 ANDUL RAJ RD, 109/32, 102/1/2B HAZRA RD, 53 S. P. M. RD ETC. IN WD NO. 84 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
CONSTRUCTION OF PAVER BLOCK ROAD FROM H/O ANIL KERKATTA TO H/O MANGAL MUNDA AT MUNSI LINE OF MEENGLASS T.G.WITHIN RUNGAMUTTEE T.G. UNDER RUNGAMUTTEE G.P. MAL BLOCK, JALPAIGURI, FUND- APAS. APAS ID - APAS/01/020/90/0005
Construction of Paver Block road from Gadopota Modhya Madrasa to Samsul Haque House via Gadapota State plan Primary School under Sitalkuchi G.P. at Sitalkuchi Block in the district of Coochbehar during the year 2024-25. (Length- 1800.00 m)
Construction of Paver Block Road from Dewanbosh Primary School to PWD road via Amladanga adjacent with Ghat, Under Barosoulmari G.P. at Mathabhanga-II Block in the District of Cooch Behar during the year 2024 -25 . (Length - 1950.00 m) .