Loading…
Loading…
9,699 results • Best match
Laying of Distribution line with HDPE pipes conforming to IS 4984-1995 with latest revision and amendments if any with necessary HDPE special, Cost of CIDF valves etc including labour charges in Dom Para,Ward No. - 14.
ADDITIONAL EMERGENCY WORK FOR CONCRETE CUTTING, RESTORATION OF ROADS, LAYING OF DIFFERENT DIA D.I. PIPES, HDPE PIPES, ROAD CROSSING AT GOURANDI AND RUPNARAYANPUR UNDER SALANPUR AND BARABANI BLOCK FOR IMPROVEMENT OF RCFA PART - I WATER SUPPLY SCHEME
Construction of Grey Water Management system at SHALBARI Mouja of 50 nos point LWM modified leach pit, silt chamber and UPVC pipe connection under Salbari-I Gram Panchayat within Tufanganj-II Panchayat Samity Scheme Activity code 111227835 Fund 15
CONVERSION OF AC PIPE LINE TO DI PIPE LINE AND LAYING OF 100 150MM DIA D.I PIPE LINE INCLUDING FITTING FIXING OF INTERCONNECTION AT WARD NO 03 and 05 and 08.
REPAIR REPLACEMENT OF OLD RUSTED CI GI DI PIPE LINE FOR MAIN WATER SUPPLY LINE OF FILTER HOUSE AREA FOD TA BN AND NEARBY LOCATIONS UNDER AGE EM OF GE BENGDUBI
SPL REPAIR TO CI/DI PIPE LINE FROM PUMP HOUSE NO 05 TO PUMP HOUSE NO 04 AND AP TELEPARA FIRE PUMP HOUSE AT BINNAGURI MIL STN UNDER GE SOUTH BINNAGURI
Gap filling and culvert crossing along the main road at Zone-II and Zone-I by MS, DI Pipe and other allied works at JDA WSS under Alipurduar Division, PHE Dte.
Emergency repairing and bursting of DI pipe line and allied works at Samdi near Kata, Lohat more and at Dabor Colliery under Chotkara Kanskuli PWSS under RCFA Division-I PHE Dte.
REPAIR MAINTENANCE OF EXTERNAL WATER SUPPLY PUMPS MOTORS GI DI PIPE LINES AND OTHER CONNECTED WORKS AT 2 CBPO DAKSHINESHWAR BAGJOLA B T ROAD AND SALT LAKE UNDER GE NORTH KOLKATA
REPAIR/REPLACEMENT OF CI/GI/DI PIPE LINES, VALVES, VALVE PITS, BOREWELL, REPAIR OF SUBMERSIBLE PUMPS AND ALLIED WORKS AT TECH AREA AT AF STN KALAIKUNDA UNDER GE (P) (AF) KALAIKUNDA
Installation of 1 No Clustered (06) LDTW (Solar) (Depth 120m) with PVC Pipe at Adra-II (J.L. No.- 43) within Burdwan (A-I) Sub- Division in Adra G.P.,Galsi-II Block, Plot No-1374, 1307, 1255, 1550, 1565 and 1483( LAT-23.302851N, LONG- 87.636629E)
Installation of Submersible and construction of over head reservoir with PVC pipe line water supply at Biscopa under 15th. FC TIDE for the year 2020 21
Laying of 200mm dia PVC pipe and repair of manhole in damage portion of sewer line at Street No. 822 in AA-IIIC under NTK project.
Installation of 80X40 mm Tube well a Depth of 88 Meter Fitted with 1.0 HP Submerssible pump and Laying PVC pipe line with soakpit at aymapara
SINKING OF TUBEWELL OF SIZE F 100x40 PVC PIPE AND STRAINER OF DEPTH 216.00 Mtr. AT SONAKHARKI UNDER ICHHAPUR NILGANJ GP WITHIN BARASAT-I PANCHAYAT SAMITY
sinking PVC Pipe(100 mm X 50mm dia.) Tubewell with (1.00 HP) submersible pump and pipe line water supply work at Srinagar MSK at Srinagar Sansad
Installation of 80X40 mm Tube well a Depth of 88 Meter Fitted with 1.0 HP Submerssible pump and Laying PVC pipe line with soakpit at Machlandapur
New Sinking of 100 mm X 50 mm dia Tube Well with PVC Pipe and deep well Pump near REKHA HALDER VIII under Srichanda Gram Panchayat
Installation of Submersible and construction of over head reservoir with PVC pipe line water supply at Biscopa under 15th. FC(TIDE) for the year 2020-21
Laying of 50 mm Dia. PVC pipe line (Supplying, fitting and fixing) with installation of street stand post at NatunpallyAdibasipara within ward no -39, under DMC.
New Sinking of 100 mm X 50 mm dia Tube Well with PVC Pipe and deep well Pump near AMINA BIBI II under Srichanda Gram Panchayat
Installation of 80X40 mm Tube well a Depth of 88 Meter Fitted with 1.0 HP Submerssible pump and Laying PVC pipe line with soakpit at Surjapur
Sinking of 3 Three nos of Deep Tube well of 100 mm x 100 mm dia 100 mtr deep with PVC pipe and Fibre Glass Strainer
New Sinking of 100 mm X 50 mm dia Tube Well with PVC Pipe and deep well Pump near Kanai Sardar v under Srichanda Gram Panchayat
Installation of 80X40 mm Tube well a Depth of 88 Meter Fitted with 1.0 HP Submerssible pump and Laying PVC pipe line with soakpit at Guptipur
Supply of PVC pipe and Coupler for maintenance of different HDTW Schemes under Krishnagar-II (A-I) Sub-Division under Krishnagar -I (A-I) Division, Nadia.
05. Sinking of new PVC Pipe made Tube wellin front h/o Joydeb Gayen at Uttar Mouri PKR Roypara ID No.-APAS/01/174/18/0005
Arrangement of Drinking Water Supply by Sinking of 40mmX100mm Dia With PVC Pipe DWP Tube Wells under MPLAD Programme of Katwa II Deb Block Purba Barddhaman
Basin connector, waste nipple and magic pvc pipe (as per attached P.O. and ANNEXURE-A) for maintenance of LHB coach of trains of Malda Depot, ER.
Laying UPVC Pipe line in place of AC line due to strengthening of Rampurhat--Parulia PWD Road at Margram Mouza of existing MARGRAM Piped Water Supply Scheme under Rampurhat Sub-Division, under Birbhum Division, PHE Dte
Supply and Laying of UPVC pipe for different Leach Pit Soak Pit functioning at different places and sansads under Babla GP, Under 15th FC, Tied Fund, Vide SAAP No 03, Sl No 02, Activity ID 116077609
Supplying and laying of 110 mm and 90 mm dia UPVC pipe at Bansgora (Main road to Akhrapara) for providing FHTC of Bansgora Mouza JL-38 of Jamgora-Jagannathpur W/s Scheme under DWSD PHE Dte
Operation and maintenance of distribution system and rising main CI/DI/AC/UPVC pipe of Kayadanga W/S Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.w.e.f. 01.07.2025 to 30.06.2026 12 Months
Additional work supplying and laying of UPVC pipe le and laying with necessary allied works at Mohal ,Gobindapur under Augmentation of RCFA Part-III (Zone-II) (Part-B) Piped W/s Scheme under DWSD,PHE Dte
SINKING of 200 MM. DIA DEEP TUBE WELL TOP ENLARGEMENT 300 MM. DIA BY DIRECT ROTARY RIG METHOD USING UPVC PIPE AND PRE-PACKED RESIN BONDED GRAVEL FILTER AT JHAPANTALA WARD NO 15 WITHIN TARAKESWAR MUNICIPALITY
Emergency work for repair of different dia pipe Bursting, replace of damaged DI and UPVC pipe, leakage repair, installing of NRV and other allied work of Andal Phase-II PWSS under RCFA Division-I PHE Dte.
Operation and maintenance of distribution system and rising main (CI/DI/AC/UPVC pipe) of Habra Municipal Zone - II W/S Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.For one Year
LAYING OF 100 MM DIA. DI PIPE BY REPLACING EXISTING WORN OUT 100 MM DIA CI PIPE FROM PRE. NO M24 SREE PALLY TO P19 SREE PALLY AT SREE PALLY IN WD NO 114 BR XI.
Renovation Of Concrete Road, Supply,Installation Of 6Meter Gi Pipe PoleWith 20w LedStreet Light, Excavation Of Pond in ward no.-07 under APAS,Hooghly-Chinsurah Municipality
Restoration of UPVC Pipe Line etc.
Sinking of 300 X 200 mm dia 3 nos Deep Tube Well with supply of 200 mm and 300 mm dia PVC pipes and fittings (medium duty ) and 200 mm dia..with construction of Pump Houses including other allied works under Bankra FAWS Scheme
Construction of 150 mm x 150 mm Nominal Diametre size Light Duty Tubewell (LDTW) scheme up to a depth of 100 mtr. with UPVC pipe at mouza- Division Office Premises, J. L. No.- , Plot No.- under G. P. - , Block - within Jhargram District under Jha
Laying of Distribution pipe line DI Pipes All types and Class in Zone II along with Temporary restoration for vehicular movement as stated under Scope of Work for Water Supply Scheme within Kandi Municipal area in the District Murshidabad Under KM
Day to Day Operation and Maintenance of Distribution System within Zone III of Newly laid DI Pipes lines Raw Water Clear Water pipe lines and PHE lines including Chakvrigu Newly Added area under Balurghat Municipality for the Period of 12 months
Laying of Distribution pipe line DI Pipes All types and Class in Zone III along with Temporary restoration for vehicular movement as stated under Scope of Work for Water Supply Scheme within Kandi Municipal area in the District Murshidabad Under
Installation and commissioning of MS pipe range in panel no 6 and 7 of RVI seam for SHCM pakage in CM project at Nakrakonda Kumardihi B Colliery
Installation of Delivery range pipeline (150mm dia MS pipe ) from 51L/0Dip (Main pump) to 28L bore hole site (approx 600mtr) in underground at Pure Searsole Colliery
Lifting of 90kW defective submersible pump motor set incl. 6in dia MS pipe and lowering of repaired submersible pump motor set at Hazla pit of Damagoria Colliery.
Lowering, Laying n fitting of 900 mtrs, 6inch MS pipe range for 3rd pump installation at main dip ug of Chora Block Incline Colliery under Kenda Area
Dismantling, shifting and installation of power cable, switch, pump and 500 mtr. Long 6 inch. MS pipe line at different location of gourandi Colliery under Salanpur Area.