47 live16 closing this weekmost from PHE and MUNICIPAL AFFAIRS DEPARTMENT
47 results • Best match
REPAIR TO LEAKAGE/SEEPAGE FROM ROOF, JOINERY, RUSTED/BROKEN GI PIPE AND FITTINGS, PVC TANKS, FLOAT VALVE, TANK CLEANING, SANITARY FITTINGS, CONNECTED B/R ITEMS OF MD AND OTM ACCN OF 19 SIKH LI AT BARRACKPORE UNDER BARRACKPORE
Procurement of different MS Pipes for AHPStg II through CAPEX proposal 2025-26 for SGTPP.
Procurement of different alloy CI pipe bends and fittings of U#3,4,5and6 under AHM-KTPS
Malleable Cast Iron pipe fittings- TEE ISI marked, Size 25 mm.
Procurement of 2000 meters, 900NB MS Pipe for New Intake Pipe line through CAPEX 2026-27 under TM Department,STPS
Interconnection, laying, leakage repairing and Road restoration work of 100 mm dia DI Pipe (Pipe supplied by DMC) at Netaji Subhaspally B Block Ward-42 Under DMC.
REPAIR/REPLACEMENT OF CI/DI NETWORK OF WATER SUPPLY LINE IN SOUTH OF RUNWAY IN TECHNICAL AREA, REPAIR REPLACEMENT OF EXISTING OLD UNSERVICEABLE GI DISTRIBUTION PIPE LINE WITH PPR/CPVC PIPE LINE AT PERIMETER AREA, DSC POST AND CONNECTED WORKS AND REP
REPAIR REPLACEMENT OF OLD RUSTED CI GI DI PIPE LINE FOR MAIN WATER SUPPLY LINE FROM FILTER HOUSE AT DEPOT AREA INCLUDING ENGR SUB PARK RHPD AND NEARBY LOCATION UNDER AGE EM OF GE BENGDUBI
Custom Bid for Services - 200154028 - Replacement of MS Pipe by Cast Basalt for Ash Handling System Pipelines for Stage-I, Stage-II, and Stage-III from Pump House to all Three Ash Dyke (Kendua, Nishindra and Malancha) Including all Ash Slurry Disposa.. Similar Category Operation and Maintenance Power House/Power Plant
Emergency laying of DI pipe with interconnection work and allied work at Paraskhol to improve the water supply at Paraskhol area in Bahula GP within Pandabeswar Block Deposit work ECL Paraskhol under RCFA Division-I PHE Dte.
Repairing of distribution line, laying of HDPE pipe line, repairing of FHTC at Kalikamali village, Narayanpur village, Jamjuri village, Kashidanga village, Khayerbani village and Jamgram village under Jamgram PWSS under Barabani Block in the District
Emergency diversion work for 150 mm DI pipe near Jhanjra Colliery within Durgapur Faridpur Block for smooth running of water supply at Kuchdihi, Sirsha Palashbani village and adjacent areas (ECL Deposit Work Jhanjra OCP) under RCFA Division-I PHE D
Sinking of 2 Nos. 400.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe and strainers for Ketarchak w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte.
Sinking of 2 Nos. 400.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe and strainers for Bhanderkhali w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte.
Repairing of UPVC pipe line with reconnection of FHTC and allied work at Ramnapara Water Supply Scheme within Bhagwangola-II
Auger Boring for laying of DI pipe at Bolgona Chandrapur PWD Road near 1 No. Pump house of Balgona PWSS at Bhatar Block.
As per Tender Documents
Providing 15 Nos FHTC and laying of HDPE and UPVC pipe line for village of Dhanyakherur Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Providing 48 Nos FHTC and laying of HDPE and UPVC pipe line for village of Shigram of Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Providing 48 Nos FHTC and laying of HDPE and UPVC pipe line for village of Majhergram of Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Laying of 33 KV 3X400 sq mm 820mtr XLPE cable through mi
As per tender docus
Supply 150mm dia. C.I. N.R.V. and 10ft. long 75mm dia. PVC Pipe and delivery at Mrigala Gram Panchayet under Dankuni Municipality
Construction of approach road and land developments at HW and 2nd T.Well site of along with alternative laying of DI pipes under Hijlak PWSS under Bagnan-I Block under Uluberia Sub-Division of Howrah Division, PHE Dte.
Construction of boundary wall, Intenal Pathway and Land Development including interconnection of Tube wells with DI pipes and Laying distribution pipeline at HW site of Augmentation of Bamunhati PWSS under Uluberia-II Block in Uluberia Sub-Div.PHE
Laying of UPVC pipe line damaged by gram panchayet for construction of drain at Chhatrak Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Laying of Rising main in between Tube Well to Distribution Line (UPVC Pipe) at Kulnagar for Bhatar Zone II Pipe Water Supply scheme in Bhatar Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.
Laying of UPVC pipe line damaged by gram panchayet for construction of drain at Kharangpur Jabra Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Providing balance FHTC and laying of HDPE pipe line along with approach raod and other ancillary works for Mandardihi PWSS of Bhatar Block under Burdwan Division.PHE Dte. (SM/14052)
Additional laying of Pipe line for improvement of FHTC functionality by UPVC pipe, Providing Functional Household Tap Connection (FHTC) for KANTHALANPUR piped Water Supply Scheme at Habibpur Dev. Block in the District of Malda under Malda Division,
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe, Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (2nd Call)
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe and Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (3rd Call)
Restoration of Rajendraur Kathgola Road related to proposed cutting (Open Trench) for laying of underground 600mm dia DI pipe by KMDA during the year 2024-25 - Restoration of shoulder during the year 2025-2026.
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe an providing FHTC and Construction of Boundary Wall, Earth filling and Approach road at 3rd and 4th Tubewell Site for Kadirpur PWSS in Habibpur Dev. Block
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe,Providing Functional Household Tap Connection (FHTC) , Boundary wall,Aproach Raod at HW and 2nd TW site in for JIGIN piped Water Supply Scheme of Gazole
986 nos. of House service connection upto consumer premises with HDPE pipe of 20 mm dia (OD) with necessary ferrule connection......for Water Supply Scheme at ward no. 01,02,03,04 under Diamond Harbour Municipality
1086 nos. of House service connection upto consumer premises with HDPE pipe of 20 mm dia (OD) with necessary ferrule connection......for Water Supply Scheme at ward no. 11,12,13 under AMRUT2.0 within Diamond Harbour Municipality.
878 nos. of House service connection upto consumer premises with HDPE pipe of 20 mm dia (OD) with necessary ferrule connection........for Water Supply Scheme at ward no. 09,10 under AMRUT2.0 within Diamond Harbour Municipality.
963 nos. of House service connection upto consumer premises with HDPE pipe of 20 mm dia (OD) with necessary ferrule connection......for Water Supply Scheme at ward no. 05,06,07,08 under AMRUT2.0 within Diamond Harbour Municipality.
1089 nos. of House service connection upto consumer premises with HDPE pipe of 20 mm dia (OD) with necessary ferrule connection.......for Water Supply Scheme at ward no. 14,15,16 under AMRUT2.0 within Diamond Harbour Municipality.
Repairing of bursting and Saddle Replacement and Ferrule wash of different dia. HDPE pipe of different location of Paschim Karampur Water Supply scheme and Shushuna Water Supply Schemes under Manteswar block under Durgapur Sub Division, P.H.E.DTE
Sinking of 250 x 200 mm. dia. 150 m. deep Tube Well by D.R. Rig method using UPVC pipe (CD) and UPVC deep Well Screen (RDS) under Central Circle, PHE. DTE. (1 No.) at Bolgona Railway Par (Replacement TW-III) and Pump House at beside mirickpara ICDS
As per tender docus
Replacement of UPVC/HDPE/DI pipe line damaged by WBSEDCL at khempur GP area during errection of Electric pole and surface drain Construction by GP at Kandaran Zone-I Piped Water Supply Scheme at Chanchal -II Block of Malda District under Malda Div
Road restoration work for laying of DI and HDPE Pipe line for water supply scheme of PHED on Dumdum - Lauhati Road from 7.50 km.(Anjana Sofa Center) to 8.50 km (Lotus Hospital) under Barasat Highway Division No. - I in the District of North 24 Parga
Under-ground Utility shifting of existing S.W pipe,Hume pipe and MS pipe by Supplying and laying of various dia M.S pipe within Indian oil petrol pump and Sports complex along the Sonarpur-Kamalgazi station road at ward no-8 and 27 under RSM.