Loading…
Loading…
9,709 results • Best match
INSTALLATION OF PVC PIPE TO COVER STREET LIGHTING POLE ALONG WITH OTHER ELECTRICAL WORKS AT DIFFERENT PLACES IN WARD NO-48
Supply and laying of 100 mm dia. DI pipe at D14 Ramgarh to Mukul Bose High School its surrounding area in ward no 100, Br-X
Emergent withdrawing, relaying and laying of different dia. UPVC/DI pipe line at Boyermari Abad water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E.Dte
LAYINGS OF 100 MM DIA DI PIPE LINE FOR SYSTEM IMPROVEMENT AT SUBHAS NAGAR PEPE BAGAN NEAR H/O SHILPI BEPARI, WARD NO. 07, LENGTH- 140
DEVELOPMENT OF WATER SUPPLY NETWORK SYSTEM BY 100MM DIA DI PIPE NEAR PREMISES NO 9/81,9/78,9/87 NETAJINAGAR ETC PLACES IN WARD 98 BR X
Laying of DI pipe along with interconnection arrangement at OHR site and Construction of Boundary wall and pathway and Sinking of Tubewell at Baghmundi (Zone-X)
LAYINGS OF 100 MM DIA DI PIPE LINE FOR SYSTEM IMPROVEMENT AT ISWARI NAGAR ROAD NEAR H/O SEKHAR CHAKRABORTY, WARD NO. 12, LENGTH-250 METER
LAYINGS OF 100 MM DIA DI PIPE LINE FOR SYSTEM IMPROVEMENT AT CHOWDHURY PARA STREET NEAR H/O SANJOY BHATTACHARYA, WARD NO. 06, LENGTH- 90 METER
Supplying and Laying of 500 mm dia SWMS pipe for replacement of DI pipe due to several leakages in existing....Kalyani Municipal Area under Kalyani Municipality.
LAYINGS OF 100 MM DIA DI PIPE LINE FOR SYSTEM IMPROVEMENT AT NABANAGAR MAIN ROAD NEAR H/O JOY MUKHERJEE, WARD NO. 14, LENGTH- 45 METER.
LAYINGS OF 100 MM DIA DI PIPE LINE FOR SYSTEM IMPROVEMENT AT BAGDI PARA ROAD NEAR H/O MITHUN DAS, WARD NO. 07, LENGTH- 75 METER.
MAINT BY LAYING OF 150MM AND 100MM DIA DI PIPE LINE AT THE SLUM AREA OF CHOWBAGHA NEAR GOLDER PARA IN WARD NO- 108, BR-XII.
LAYINGS OF 100 MM DIA DI PIPE LINE FOR SYSTEM IMPROVEMENT AT NIRANJAN SAMAJPATI SARANI NEAR H/O GOPAL SEN, WARD NO. 08, LENGTH- 80 METER.
DEVELOPMENT OF WATER SUPPLY NETWORK SYSTEM BY 100MM DIA DI PIPE NEAR PREMISES 165 ASHOK AVENUE AND ITS ADJACENT SLUM AREA IN WARD 98 BR X
Laying of DI pipe and Repairing, Rennovation and protection of boundary wall, Fencing work etc and other allied works at Head work site of Jasaikathi etc.
Emergent withdrawing, relaying and laying of different dia. UPVC/DI pipe line at Chotto Sehara water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E.Dte.
IMPROVEMENT OF WATER SUPPLY NETWORK SYSTEM BY 100MM DIA DI PIPE NEAR PREMISES NO 19E PADDAPUKUR ROAD, 17B PADDAPUKUR ROAD ETC IN WARD 98 BR X
Laying of DI pipe line from 3rd Tube Well site to towards the way of Samsi of RATUA Water Supply Scheme under Malda Division PHE. Dte.
SUPPLYING AND LAYING OF 100 MM DIA DI PIPE AT DINESH PALLY UNNAYAN SAMITY TO 62. 109 BINOY BOSE ROAD IN WARD NO 113 BR XI.
LAYINGS OF 100 MM DIA DI PIPE LINE FOR SYSTEM IMPROVEMENT AT SIDHESWARI BANERJEE LANE NEAR H/O RAMESHWAR CHAKRABORTY, WARD NO. 06, LENGTH- 65 METER.
DEVELOPMENT OF WATER SUPPLY PIPE LINE BY 100MM DIA DI PIPE NEAR PREMISES NO 4/1,4/2,4/12,4/13 NETAJINAGAR IN WARD NO 98 BOROURG X
REPLACEMENT OF 100 MM DIA DAMMAGE PIPE BY LAYING OF 100 MM DIA DI PIPE BESIDE RABINDRA PALLY TALTALA GROUND IN WD NO 101 BR XII
Laying of Concrete Block removed during laying of DI Pipe in the Junction of NH-112 and Netaji Road at Ward no-6 within Habra Municipality.
Laying of Pipe Line by UPVC/HDPE Pipes with necessary accessories including fitting fixing all complete for Washout water of Over Head Tank at Dankuni Housing in ward no.-10 Under Dankuni Municipality
Supplying, fitting, fixing and laying of DI K-7, HDPE pipes of varying diameter for treated water distribution network ........all complete at Zone-5 within Sector-VI ITA jurisdiction under AMRUT 2.0 scheme.
Electro mechanical works
METAL BEDS METAL BEDS ( 95 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Structure of Metal bed frame including legs and head Structure MS PIPE SS 202 PIPE, SS 304 PIPE, MS PIPE, M S HOLLOW RECTANGULAR SQUARE SECTION, S S 202 HOLLOW RECTANGULAR SQUARE SECTION, S S 304 HOLLOW RECTANGULAR SQUARE SECTION Head board With - Shape of headboard SEMI CIRCULAR - MATERIAL Size of Rectangular Hollow section ±1(mm) 50 mm X 25 mm 50 mm X 25 mm, 60 mm X 40 mm, 66 mm X 33 mm, 80 mm X 40 mm, 96 mm X 48 mm, N.A, 40 mm x 20 mm Size of Square Hollow Section ±1(mm) 25 mm X 25 mm 25 mm X 25 mm, 32 mm X 32 mm, 38 mm X 38 mm, 40 mm X 40 Mm, 50 mm X 50 mm, 60 mm X 60 mm, 72 mm X 72 mm, 80 mm X 80 mm, N.A 1/3 Size of Circular Hollow Sections ±1(mm) 25 mm 15 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 65 mm, 80 mm, N.A Thickness of Hollow Section in Structure (mm) 1.4 mm 1.1 mm, 1.2 mm, 1.3 mm, 1.4 mm, 0.8 mm, 0.9 mm, 1.0 mm, 1.5 mm Support Panel for placement of mattresses M S hollow box rectangular section M S hollow box rectangular section, m s hollow box square section, angle iron, SS 202 RECTANGULAR SQAURE SECTION, SS 304 RECTANGULAR SQAURE SECTION, SS ANGLE Thickness of support Panel (in mm) 1.0 mm 1.4 mm, 1.5 mm, 1.6 mm, 1.1 mm, 1.3 mm Material of head board m s ERW tube IS:7138 Square Tube of 38.1 mm X 1.2 mm thick - Material of mattress panel plywood - Thickness of mattress Panel ±1(mm) 12 mm - DIMENSION Over all length of Bed in mm (±10 mm) 2000 As per GeM Catalogue. Over all width of Bed in mm (±10 mm) 915 - Height of Bed in mm (±10 mm) 450 400, 450, 500, 550, 600, 650, 700, 750, 810 Size of support members in mm (±5 mm) 25 X 50 (mm) - COLOUR & FINISH Paint/Finish of M S parts Powder Coating Powder Coating, Stove Enamel paint, NA Finish of head board powder coating - Min Powder/paint coating thickness (Micron) 60 micron 50 micron, 60 micron, NA Colour of bed (steel Frame) black - WARRANTY WARRANTY 1 year - CERTIFICATION Test reports to be furnished to buyer on demand YES - 2/3 MISC Number of support members 4 4, 5, 6 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Sambhunath Datta 711103, College Road 95 15
House Service connection with Metering Arrangement for Households necessary HDPE pipe laying restoration at Zone_E Ward No 13_14_15 under Garulia Municipality under AMRUT 2_0
Additional Laying of HDPE pipe line and allied work in connection with Augmentation Berachampa Zone-I Water Supply Scheme within Barasat Sub Division, P.H.E.Dte.
Extension of HDPE pipe line with stand post of Baniban PWSS under Uluberia-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Supplying, Laying of HDPE pipe with specials of different Dia. Including supply and installation........Siakhala Gram Panchyat District Hooghly, under State Fund (Package-I)
Supplying, Laying of HDPE pipe with specials of different Dia. Including supply and installation....Siakhala Gram Panchyat District Hooghly, under State Fund (Package-II)
New Laying of 200 mm dia HDPE Pipe from 91, Deshpran Sasmal Road to 93/7, Deshpran Sasmal Roiad under H.M.C. ward No. 24
Laying new Water Pipe line 200 mm dia HDPE pipe from 37, Bahirab Dutta Lane to 38/9 Fakir Bagan lane, Ward no - 15
House Service connection with Metering Arrangement for Households necessary HDPE pipe laying restoration at Zone_F Ward No 16_17_18 under Garulia Municipality under AMRUT 2_0
House Service connection with Metering Arrangement for Households necessary HDPE pipe laying restoration at Zone_G Ward No 19_20_21 under Garulia Municipality under AMRUT 2_0
House Service connection Metering Arrangement for Households necessary HDPE pipe laying with restoration at Zone_C Ward No 7_8_9 under Garulia Municipality under AMRUT 2_0
House Service connection with Metering Arrangement for Households necessary HDPE pipe laying restoration at Zone_B Ward No 4_5_6 under Garulia Municipality under AMRUT 2_0
Supplying and Laying of 110 mm diameter and 160 mm diameter (OD) HDPE pipe.......Khardah Municipality under Surface Water Supply Scheme of AMRUT 2.0.
Supplying and laying of HDPE pipe from 110 mm to 160 mm dia.......Water Supply Scheme of Naihati Municipality (Zone-2) under AMRUT 2.0.
Laying of 75 mm Dia. HDPE pipe (Supplying, fitting and fixing) at sriniketan Housing Society, 3 No Street, within Ward no-12, under DMC.
New Laying of 200 mm dia HDPE Pipe from 94, Deshpran Sasmal Road to 96/4, Deshpran Sasmal Road under H.M.C. ward No. 24
Engagement of Laboratory personnel Contractual for smooth running of the UPVC HDPE pipe testing laboratory at Nababhat under Burdwan Division PHE DteFor Six Months
SUPPLY, FITTING AND FIXING BRASS FERRULE INCLUDING CONNECTION WITH GI PIPES OF TATA MAKE OF 15 MM DIA INCLUDING PERMANENT ROAD RESTORATION AT ZONE 1 FOR WATER SUPPLY SCHEME OF BAIDYABATI MUNICIPALITY AREA UNDER AMRUT
SUPPLY, FITTING AND FIXING BRASS FERRULE INCLUDING CONNECTION WITH GI PIPES OF TATA MAKE OF 15 MM DIA INCLUDING PERMANENT ROAD RESTORATION AT ZONE 2 FOR WATER SUPPLY SCHEME OF BAIDYABATI MUNICIPALITY AREA UNDER AMRUT
SUPPLY, FITTING AND FIXING BRASS FERRULE INCLUDING CONNECTION WITH GI PIPES OF TATA MAKE OF 15 MM DIA INCLUDING PERMANENT ROAD RESTORATION AT ZONE 3 FOR WATER SUPPLY SCHEME OF BAIDYABATI MUNICIPALITY AREA UNDER AMRUT
Short term measure by Guard piling with GI pipes to prevent washout or damages of 4 nos. of higher Diameter clear water D.I. pipes in the bed of river Gandheswari near IGLR within Bankura Municipality
SUPPLY, FITTING AND FIXING BRASS FERRULE INCLUDING CONNECTION WITH GI PIPES OF TATA MAKE OF 15 MM DIA INCLUDING PERMANENT ROAD RESTORATION AT ZONE 4 FOR WATER SUPPLY SCHEME OF BAIDYABATI MUNICIPALITY AREA UNDER AMRUT
Construction of temporary latrine, toilet, Hand Washing Unit(bib cock,pipe and fittings etc.), vat, Sinking of temporary TW including sinking of New TW with submersible pump at NANDANPUR HIGH SCHOOL
Construction of temporary latrine, toilet, Hand Washing Unit(bib cock,pipe and fittings etc.), vat, Sinking of temporary TW including sinking of New TW with submersible pump at Chhotonaldaha High School