Loading…
Loading…
2,969 results • Best match
LEAK PROOFING AND REPAIRS OF STAFF QUARTERS NEAR HI TECH NURSERY AT VAZHAPPARA IN CHITHALVETTY ESTATE
Desilting of pond in Chuzhaly District Permanent Nursery under Social Forestry Range Kalpetta during 2023-24
Annual Plan-MARADY GP 84/2022 Renovation Of Anganwadies,Nursery in Marady GP-General Civil Work
growing stock by 5 percentage enumeration in 1970 and 1971 Narikundu Teak Plantations of Machad Range for the preparation of Thrissur Working Plan during 2023 and 24
Terrace Vegetable Cultivation In Earthen Pots. 10 Potswith 12 Inch width in One Unit Potting Mixure with Hybrid vegetable Seedlings
Raising 25000 polybag seedlings for Kunnamkulam Block at Madakkathara under Thrissur Social Forestry Range during the financial year 2025-26
Raising 15000 polybag seedlings for Chavakkad Block at Punnayur under Thrissur Social Forestry Range during the financial year 2025-26
Raising of 10000 nos of miscellaneous species of indigenous endangered threatened tall basketted seedlings at Chuzhali under SF Range Kalpetta
COST OF FIRE BREAK AT 13 KANNARA RAILWAY TRACK AREA( 5 KM), AYYAPPANKANA- NAGAMALA(2 KM), AYYAPPANKANA SANDAL AREA( 4 KM), KUNNATHUMALA( 2 KM), MANNANTHARA 2010 MEDICINAL PLANTATION AREA ( 1 KM) IN AYYAPPANKANA BLOCK NO.5 IN THENMALA RANGE DURING 202
Estimate for the cost of IInd year maintenance of 2024 Teak Plantation at Peruvampadam (1965 TP Teak final Felled Area) over an extent of 21.9 Ha (Effective area 20 Ha) in Edakkode Forest Station under Edavanna Range, during 2025-26
Custom Bid for Services - Wild Grass Removal Category I, Custom Bid for Services - Tree Pruning Category II, Custom Bid for Services - Disposal of Wastes Category III, Custom Bid for Services - Open Sewage Line Cleaning Category IV Similar Category ... Category Plantation Service ... Service Plantation Service ... Service Plantation Service ... Service Plantation Service ...
Custom Bid for Services - Grass Cutting (Category-1), Custom Bid for Services - Tree Pruning (Category-II), Custom Bid for Services - Disposal of Related Wastes (Category-III), Custom Bid for Services - Open Drainage Cleaning (Category-IV) Similar ... Category Plantation Service ... Service Plantation Service ... Service Plantation Service ... Service Plantation Service ...
growing stock by 5 percentage enumeration in 1977 Pullamkandam and 1978 Pullamkandam Teak Plantations of Pattikkad Range for the preparation of Thrissur Working Plan during 2023 and 24
growing stock by 5 percentage enumeration in 1974 Pullamkandam and 1980 Pullamkandam Teak Plantations of Pattikkad Range for the preparation of Thrissur Working Plan during 2023 and 24
growing stock by 5 percentage enumeration in 1967 Potta and 1969 Potta Teak Plantations of Machad Range for the preparation of Thrissur Working Plan during 2023 and 24
Raising 25000 basketted seedlings of misc. species for distribution to Ernakulam Section in Ernakulam Range during 2022-23 and 2023-24
Supply of eathen pots (10 inch diametre size) , filled with potting mixture and 4 vegetable seedlings per pot (total 3300 No.s)
Kuniya Thokkanam Motta Plantation road tarring in Pullur Periya GP
Climber Cutting in 1965 Teak Plantation , Koomullu in Athirappillyb Range
Road concreting
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,shrubs, saplings, engaging mazdoor for uprooting vegetation from bridge structure Clearing drainage spouts removing stagnated sand and silt etc
Clearing rank vegetation, grass, saplings etc at a height of 1m above ground level (Q3), Surface dressing of the ground including removing vegetation and inequalities (Q3), Disposal of debris (Q3)
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings, Engaging mazdoor for uprooting vegetation from bridge structure, Clearing drainage spouts, removing stagnated sand and silt etc
Cost of creation of fire break at 2003 Hardwood plantation 2 Km and 2001 cane plantation (3 Km) in Kallar section of Mankulam Range during 2021-22
Name of Work Estimate for the cost of raising 1st IInd IIIrd year maintenance of 2024 25 Teak plantation at peruvampadam 1965 TP Teak final felled Area over an extent of 21.9 Ha Effective area 20 Ha in Edakkode Forest station under Edavanna
Supply of dried cowdung powder for for fruit plants, vegetable seedlings, rooted pepper cuttings, ornamental plants, medicinal plants and production of vegetables
Estimate - 5000 Casurina and Mangrove Assosiated species nursery at Chal Beach under Kannur SF Range during 2024-25
cost of construction of Generator Room at Chuzhali Central Nursery under Kalpeta Social Forestry Range during 2019 -2020
CLIMBER CUTTING WORKS AT 1980 PANJANAMKUTHU TEAK PLANTATION AT VAZHACHAL RANGE
CLIMBER CUTTING WORKS IN 1962 KARADIPPARA TEAK PLANTATION AT VAZHACHAL RANGE
CLIMBER CUTTING WORKS IN 1968 KOTHIKALLU TEAK PLANTATION IN KOLLATHIRUMEDU RANGE
MARKING FOR FINAL THINNING IN 1976 ATHIRAPILLY BIT II TEAK PLANTATION
MARKING FOR FINAL THINNING IN 1976 PANJANAMKUTHU TEAK PLANTATION VAZHACHAL RANGE
CLIMBER CUTTING WORKS AT 1964 KARADIPPARA TEAK PLANTATION IN VAZHACHAL RANGE
CLIMBER CUTTING WORKS AT 1979 TEAK ELAVU PLANTATION IN ATHIRAPPILLY RANGE
Planting 6000 nos Mangrove seedlings at Pallickal, Ithikkara, Munroethuruth and West Kallada in Kollam Social Forestry Range during 2022-23 and 2023-24
Estimate for the cost of raising 14 nos mother bed and 20000 Misc seedlings at Palathuvayal under SF Range Thalassery during 2021 22.
Improvement of road (300 mtr concrete road) to rain shelter and shade net house at District Permanent Nursery Chuzhali
cost of construction of LABOUR RESTING ROOM at Central Nursery Chuzhali under Kalpeta Social Forestry Range during 2019 -2020
Construction of Zoological Park at Puthur,Thrissur. SH: Landscaping and Horticulture works Part C SW: Development of horticulture and plantation for the bear zone and shola grass lands including civil works of Filling up of site with earth, water supply lines and trellis works etc.
building
SHADE HOUSE
growing stock by 5 percentage enumeration a of 1946 Urakkad, 1946 Manalithara and 1946 Manchatti Teak Plantations of Machad Range for the preparation of Thrissur Working Plan during 2023 and 24
INTERCROP PINEAPPLE CULTIVATION IN RUBBER PLANTATION AT CHERUPPITTAKAVU ESTATE BLOCK NO A
INTERCROP PINEAPPLE CULTIVATION IN RUBBER PLANTATION AT CHERUPPITTAKAVU ESTATE BLOCK NO B
Gap planting of Mundoor Mavu - Kudampuly plantation RET specious during 2023-24
Ist Silvicultural thinning work in 2006 Chully Teak Plantation in Athirapilly Range
Third silvicultural thinning work in 1994 Chully teak plantation in Athirapilly Range
Estimate for the cost of raising 50000 No.of polybag Casuarina, Bamboo and Kandal Associated species seedlings at Manalayipuzha during 2019-20 and 2020-21