Loading…
Loading…
7,154 results • Best match
Procurement of Plants of Different species for plantation at various places as part of Haritha Haram in Bodhan town Under Pattana Pragathi Funds ("Invited Under earmarked works - SCs are only eligible to participate")
Engaging of 7 Nos Water Tankers with 5000 Liters Capacity on Hire Basis from May 2022 to July 2022 for Watering to the MLAP Plantation in Zone IV Area of Nizamabad Municipal Corporation
1st Year Maintenance of Block Plantation at Suraram Forest Block (Point 2) (29380 no s) in Circle-26, Gajularamaram, Kukatpally Zone, GHMC during the year 2023-24 for a period of 12 months
Rasising and first year maintenances of OB plantation(4.0Ha) on external OB dump slops and top soil dump (9.0Ha) at KTK OCP-I-II of BHPL Area, during 2018 year planting seacon - Reg
Plantation of plants at Sri Sai nagar Ph-1 and 2, Mallikarjuna nagar, Gayathri Hills Phase - 1 and 2, BDL Colony, Lokayuktha Colony, Padmavathi Colony in Division no 19 in Badangpet Municipal Corporation
Vanamahostavam 2025-26 - Engaging of Labour for Pitting and Plantation and Engaging of Tractor with Trailer for Lifting of Plants from Nurseries at Various Places of Zone V Area of Nizamabad Municipal Corporation.
Vanamahostavam 2025-26 - Engaging of Labour for Pitting and Plantation and Engaging of Tractor with Trailer for Lifting of Plants from Nurseries at Various Places of Zone IV Area of Nizamabad Municipal Corporation.
Raising and First year maintenance of Block plantation in an area of 4.0 Ha near Annaram Village back side of the dump yard at MNGOC Project Manuguru area during the year 2023-25
Procurement of Remote Control (RC) Drone Camera with Additional Battery Sets and Charger to Enhance for Spraying Fertilizers for Plantation purpose and Aerial Surveillance for Food Items during Floods in Khammam Municipal Corporation
Raising and first year maintenance of OB plantation on external dumps of RG OC-II in an area of 23 Ha (Ratchapalli Dump 14Ha and 703 Spreader dump 9Ha) during 2026-27-28
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation areas ...
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of all available uprooted stumps of all sizes, ... the plantation area ... C(1999) plantation areas
Clear Felling Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all ... the plantation area ... in plantation areas ...
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation areas ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation areas ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation areas ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation areas ...
Plantation of Avenue plants from Housing Board Kaman to Ensanpally Road, Vemulawada Kaman to Yellamma temple and Kappalakunta to Islamina College road both sides in Siddipet town under Haritha Haram Programme under General Funds.
1st year maintenance of multiple Row Avenue Tall plants plantation from Suchitra X road to Dairy farm X road (Both Sides of service roads) in Circle-25, Quthbullapur, Kukatpally Zone, GHMc for 12 months
2nd year maintenance of Openspace plantation (Bit-I) at various locations in Circle-22, SLPZ, GHMC during the year 2023-24 for a period of (6) months under Telanganaku Haritha Haram upto march 2024
Raising and First year maintenance of Block plantation in 16.50Ha (a. Akkepalli area block-2 (9.0Ha), b. Siddapalli area block-2 (5.0Ha), c. Kannala road (2.50Ha)) in RG-III area during 2025-26-27.
Raising and first year maintenance of fruit bearing and miscellaneous plantation in 40 Ha in the areas between switchyard and coal road and railway track and old Mango orchard of STPP during 2020-22
Estimate for Raising plantation in Lakes (Raised Bund): Length: 700 RMT at Mansoorabad Pedda Cheruvu in Circle-III, Hayathnagar , LB.Nagar Zone, GHMC . During the year 2022( Raised 700 Rmt + 400 Rmt Sunken) -4th Recall
Taking up balance works (Making approach way, Diversion of Flood Water, Plantation of Special type of Plants) and Providing Drip system at Bruhath Pattana Prakruthi Vanam in Narapally in Pocharam Municipality under Green Budget
Engaging of daily wage labourers for maintenance of sanitation and plantation as part of Pattana Pragathi Programme in Bodhan town under Pattana Pragathi Funds ("Invited under earmarked Works - SCs are only eligible to participate")
Felling of Eucalyptus clonal subabul and miscellaneous plantation extraction and transportation of timber and props to SRP timberyard disposal of pulpwood and Misc. fuel wood at old site office OCPIII RGII Area during 2022
Development of Soft LandScape Garden Work with Plantation and Providing Water Supply with drilling of borewell & Erection of 7.5 HP Submersible Pumpset in Peerzadiguda Graveyard in Peerzadiguda Municipality Under Municipal General Funds 2018-19
Supply and Delivery of Plants & Tree, Manure(Gobar), Vermi-Compost, Red Soil & Engaging Labours for Haritha Haram Median Plantation from Narsapoor Chowrastha to Potharajpally Kaman in Toopran Municipality under Municipal General Fund 2020-21.
Conversion of bag plants from Micro bags into 6"x8" bag size (1,00,000 Nos) in Private Lands in Circle-VIII,X & XI, Charminar Zone, UBD, GHMC during 2022-23 (Ornamental plantation other than Bougainvellias)
Conversion of bag plants from Micro bags into 6"x8" bag size (1,00,000 Nos) in Private Lands in Circle-VIII,X & XI, Charminar Zone, UBD, GHMC during 2022-23 (Ornamental plantation other than Bougainvellias)
Estimate for 1st year maintenance of Open Space plantation (Bit-II) at various locations in Circle-20, SLPZ, GHMC during the year 2022-23 for a period of (12) months under Telanganaku Haritha Haram
Engaging of watch and ward labour (15) Nos for the period of 1 year for the Plantation, Maintenance of Nurseries and Maintenance of Plants under Haritha Haram in Korutla Municipality under MGF/ Green Budget
Estimate for 1st year maintenance of Open space plantation (Bit-I) at various locations in Circle-20, SLPZ, GHMC during the year 2022-23 for a period of (12) months under Telanganaku Haritha Haram
Engage of Labour for Maintenance of Median plantation, Yadardri park & Bruhath Pattana prakruthi vanamu from April 2023 to November 2023 (Rate as per SSR 2022-23). Under Green Budget 2022-23 in Zaheerabad Municipality
RAISING OF MULTILAYER CENTRAL MEDIAN PLANTATION ON NH-163 COVERING VILLAGES FROM PALIVELPULA OF HANUMAKONDA MANDAL TO PAIDIPALLY OF WARANGAL MANDAL, HANUMAKONDA AND WARANGAL DISTRICTS - DURING THE YEAR 2022-23.(STRETCH - II, 10.58 KMS)
Engage of Labour for Maintenance of Median plantation, Yadardri park & Bruhath Pattana prakruthi vanamu from July 2022 to Dec 2022 (Rate as per SSR 2021-22). Under Green Budget 2022-23 in Zaheerabad Municipality.
Clearance and uprootal of Prosophis and miscellaneous growth and tilling for raising miscellaneous block plantation in the proposed aea near KK nagar oxidation pond at Rg.II area, during 2022-with 200 HP& above Poclain
Raising and maintenance of Open Space( Parks, Tree Parks, Open Spaces, Grave Yards,Lakes and Institutions) Plantation under TKHH in Circle-15, Musheerabad of Sec'bad Zone, GHMC during the year 2021-22 (1st recall)
Procurement, Supply & delivery of Croton plants of ( Bag Size 21/21 inches) to take up plantation in the median from Municipal Office ( Petrol Bunk) to towards Kundanaplly Road along the HKR Road in RMC
Procurement of 3.00 lakhs no.of 4"x5" bag size plants for taking up plantation at Green curtains, flyovers and central medians during Telanganaku Haritha Haram 2020-21 in Circle-20 (Bit-I), SLPZ, GHMC
Felling of Eucalyptus clonal and miscellaneous block plantation in a phased manner for OC-V Project, extraction and transportation of timber and props to Srirampur Timberyard and disposal of Eucalyptus pulpwood and miscellaneous firewood
Pitting and plantation (GAP) in MLAP at Siricilla bypass road and Hyderabad road on the programme of Haritha haram (9th phase) of MCK est cost of Rs. 15.15 lakhs under PP Funds (3rd Recall)
Raising and 1st year maintenance of OB dump plantation in an area of about 17 Ha at North external dump yard (towards South of GP vagu) of PKOC Project, Manuguru area during the years
Felling of Eucalyptus trees and Conversion of Props & timber and Transportation of Eucalyptus Props & Chock timber from various plantation sites of JKOC coal mine located in Yellandu area of SCCL during the year 2022
Estimate for 2nd year Maintenance of Block Plantation (8821 No.s) and Individual shrubs (7000 No.s) at Rampally 2BHK, in Cir-1, Kapra, LB Nagar Zone, UBD, GHMC. During the year 2024 (for one year)
Advance Operations-Tillage in entire proposed plantation area 14 Ha towards south of Akkepalli R&R site at Bittupalpalli and East side of Racchapalli R&R site RG-III Area during 2024 season-Reg
MAINTENANCE OF MULTILAYER CENTRAL MEDIAN PLANTATION ON NH-163 COVERING VILLAGES FROM REDDYPURAM PALIVELPULA OF HANUMAKONDA MANDAL TO PAIDIPALLY VILLAGE OF WARANGAL MANDAL HANUMAKONDA AND WARANGAL DISTRICTS - DURING THE YEAR 2025-26 - 5.00 KMS
Supply, Delivery and Fixing of Avenue, Hedge, Topairy, Ornamental Plantation and Kerb Stines at Nalla Cheruvu Mini Tank Bund in Jadcherla Municipality under Pattana Pragathi Grant (10% Green Budget) for the Year 2021-22.
Raising and 1st year maintenance of Avenue/Strip plantation all along the diverted road and nallah from 2 Incline under bridge to GDK.5 Incline new filter bed, RG.I (2.8KMs) during 2022 to 2024
Drilling of Pit with pneumatic air compressor for plantation under the steel flyover between the spans from Dhobi Ghat to Yadagiri Theater Circle-25, Santhoshnagar, Charminar Zone, UBD, GHMC for the year 2026-27