Loading…
Loading…
5,280 results • Best match
Estimate for desilting of dains size( 600 X 600 up to 1500 X 1500) before rainy seasons (Fy 2025-2026) and tractor mounted pumps for pond in ward no. 34, MCF.
Dismantling of Cement Concrete and Repair and Construction of Drain Type-I From chowk to Kuwan Mohallha to pond and near by area in Village Kheri Kalan Ward no. 34, Faridabad.
Filling of village pond.
Filling of village pond
Village Pond Mator ( Bajisar),
DE-SILTING OF POND
Village pond Ahun (Samsaanwala)
CONST OF MODEL POND
Filling of village pond
Filling on village pond
To fill village pond
village Pond Chausala (Kanthari)
Village Pond Sajuma (Gharowa)
To fill village pond
Digging of Pond (Thukral)
To fill village pond
Bani and Pond Plantation
Renovation of Pond Balkara
CONST. / RENO. OF POND
Marranwala Village (Marranwala Talab), Estimate for Providing and Installing 1 no. tubewell (Against failure tubewell) under Gram Panchayat Marranwala of Block Pinjore District Panchkula (Marranwala Talab).
Construction of Retaining walls and cow ghats of three main ponds in Village Khudan Block Machhrauli District Jhajjar
Renovation of Kunti Talab Park in Ward No. 4, Jagadhri.
abcd
Dewatering, Construction of pathway, wetland, Cattle Ghat, Step ghat at Village Badal
Estimate for dewatering and digging/desludging of cattle of village Rampura Block Safidon
Earth Work Excavation , Carraige
EXCAV ATION / EMBAKMENT OF JOHR
Estimate for dewatering and digging/desludging of cattle of village Jaipur Block Safidon
EARTHWORK AND PAVINGOF IPB AT JAMALPUR
approach road NAlla and high mast Light approach road NAlla and high mast Light
Earthwork in excavation
Bringing to design section of Hartari Drain from R.D 10800 TO 13800 and 15800 to 17800 for to protect the crop/land from waste water in village Budsham .
CONSTRUCTION OF NALA FROM PURANA POND TO NAYA POND AT VILLAGE MALHA MAJRA BOCK RAI
UPLANA ROUGH COST ESTIMATE FOR MODLE POND IN MOCHAN WALA POND VILLAGE UPLANA BLOCK ASSANDH
Solar power pressurized irrigation infrastructure in overflowing village Pond Ratak, School Wala Pond Distt. Karnal
Solar power pressurized irrigation infrastructure in overflowing village Pond Thari, Jata wala Pond Distt. Karnal
2 No. disposal (Rest House Pond, Kikarwasni Pond, Sewer network, Sewer manhole, Renovation Jhajjar road
Solar powered pressurized irrigation infrastructure in overflowing village Pond Sagga Kapuria Wala Pond Distt. Karnal
Solar power pressurized irrigation infrastructure in overflowing village Pond Salwan, Mata Wala Pond Dist. Karnal
SAMALKHA - BLOCK CONSTRUCTION OF MODEL POND AT VILLAGE- GARHI CHHAJU ( HARGANA WALA POND ) DISTRICT- PANIPAT
DEVELOPMENT OF TAMSABAD ROAD WALA POND AS MODEL POND in Village Sanoli Khurd Distt Panipat
Extension and Beautification of Percolation Pond Rennovation of Pond and C.C. Pitching on temple side
E/WORK, DEWATERING ,GHAT, CHAMBER,WETLAND
Gindran Laying 450 mm dia. RCC NP2 Pipe Line For Waste Water From H/o Ramrakh Godara to Pond Near Stadium via Goga Medi Mandir at Village Gindran Block Rania Distt. Sirsa
Laying RCC pipeline of 450 mm dia NP-2 for filling village pond Bachhod from Km. 3.900/L of Shampura Minor for recharging ground water table and providing irrigation facilities. (Re-invited)
Laying RCC pipeline 600mm i/d NP-2 from tail of Katchha drain Kojinda Experimental channel from Km. 4.720/L of Shyampura Minor including digging of new village pond Neerpur. (Re-invited)
ARC for De-weeding of Raw water Pond No. 1 and 2 and up keeping of raw water pump house building and surrounding area around the raw water building at PTPS, Panipat.
Laying HDPE pressurized pipeline for filling village pond Rampura from Km. 5.780/R of Rampura Sub Minor for recharging ground water table and providing irrigation facilities (Ateli Constituency) (Under Atal Bhujal Yojana)
Re Call Development of Pond GWM Kund Wala or Handan Wala at Village Palwan and Naya Johd at Village Bhonsla and Bhagal Wala Johad at Village Mandi Kalan Block Uchana District Jind