Loading…
Loading…
4,925 results • Best match
Request for Proposal (RFP) for appointment of Authority Engineer for providing project management services for (1) Tumkur-Chitradurga-Davanagere New Line Project - Construction of New BG Line between Chainage 66/400 & Chainage 90/000 (23.60 Km) including Civil, Signal & Telecommunication, Electrification and General Electrical works between Tavarkere (Excl) & Hiriyur (Excl) stations on Engineering Procurement & Construction (EPC) mode. (2) Tumkur-Chitradurga- Davanagere New Line Project -Construction of New Railway Line between Chainage 90/000 and Chainage 130/375 (40.375 km) Civil, Signal & Telecommunication, Electrification and General Electrical works between Hiriyur (Incl.) & Palavvanahalli (Incl) stations on Engineering Procurement & Construction (EPC) mode.
Appointment of Strategic Partner for providing Detailed Design, Technical Inputs, Construction Supervision, and Operation of Nucleus Breeding Centre (NBC) for L. vannamei in India
Consulting Services for Assistance in Engineering, Procurement, Construction Supervision and Operation of a Solar PV Power Plant and Power Evacuation Infrastructure in Maharashtra, India
Consultancy Services as Authority Engineer for Supervision of Construction Four laning of N. Kawnpui (N. Mualvum)-Mualkhang via Khamrang Village - Sairang section (Pkg7) (Pkg 8) of NH-6 Silchar-Vairengte - Sairang road in the state of Mizoram
Consultancy Services for Authority Engineer for Supervision of Rehabilitation and Uppradation of Shewali Sakri - Nandurbar section of NH-753-B from km 0.000 to km 49.050 excluding km 0.300 to km 4.500 in the State of Maharashtra.
SHIFTING POLES FOR ROAD WIDENING WORK AT MUNDAPALAM IN FAVOUR OF EXE ENGINEER, KRFB PMU MLP PKD under Electrical Section, Kondotty Work code CW-6552-202223-14.
SUPPLY OF 239 NUMBERS OF OUTDOOR TYPE HEAT SHRINKABLE END TERMINATION KIT SUITABLE FOR 3X300MM2 11KV XLPE UG CABLE FOR PMU AND PMSU WORKS UNDER CENTRAL REGION
Supplying, laying, fitting, fixing and jointing of HDPE pipeline of distribution system with allied works, providing FHTC (Functional House Hold Tap Connection) and Construction of 350 cum capacity R.C.C OHR
Construction of Over Head Reservoir of Capacity 100 cum Stg. Ht. 20mtr., laying of distribution system, Construction of secondary chlorination room and providing FHTC connection under Zone-II water supply scheme of left-out Mouzas of Barabazar
Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 100 CUM and staging height 20 mtr as per approved drawing ( No PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including
Construction of RCC Over Head Reservoir (Torch type with solid raft)of capacity 150 cum and staging height 20 mtr and laying of Distribution System including pipe carrying structure all complete including providing House Hold Tap Connection (FHTC)
Repairing and painting of Over Head Reservoir (Capacity 350 Cum., staging height 20 Mtr.), Chlorination Room, Guard Room, Boundary Wall and laying distribution pipeline for providing FHTC, Sinking of 4 (Four) Nos. 200 mm dia. X 4.50 Mtr. depth horizo
Design, Surveying, Engineering, Supplying, Laying, Fitting, Fixing and Jointing of Raw Water Rising Main from Abutment of Intake Access Bridge to WTP of MS Pipe with all Specials and Valves etc. including Road, Canal Crossing and necessary Road Resto
Construction of High lift Pump House, 450 cum OHR along with soil investigation work, boundary wall and laying of rising main under Augmentation of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-III)
Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 100 CUM and staging height 20 mtr as per approved drawing ( No PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including
Construction of Over Head Reservoir of Capacity 300 cum Stg. Ht. 20mtr., laying of distribution system, Construction of secondary chlorination room and providing FHTC connection under Zone-III water supply scheme of left-out Mouzas of Barabazar
Construction of R.C.C. Elevated Reservoir, Capcaity 600 cum (Intze Type), Staging height 20 metre including Bypass arrangement and other allied works for Augmentation of (Zone-I) Manbazar WS Scheme of Purulia Sadar Sub_Division under Purulia Division
Installation of 02 (Two) nos. 1.00 H.P. capacity Solar Photovoltaic Submersible Pump set in pre-existing / new bore Tube well along with 1300 Watt peak capacity Solar photovoltaic array panels on steel structure including Supply and Delivery
Laying of Distribution System including pipe carrying structure all complete including providing House Hold Tap Connection (FHTC) and other allied works for Aug. work of Raghunathpur Water Supply Scheme (German Assisted) (Zone -II A) within RNPUR
Construction of Over Head Reservoir (OHR) of 500 Cum Capacity, Staging Height 25 mtr. at Birgiri Mouza of Bangabari W/S Scheme under Purulia Sadar Sub-Division of Purulia Division, P.H.E. Dte.
Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 100 CUM and staging height 20 mtr as per approved drawing ( No PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including
Construction of Over Head Reservoir of Capacity 300 cum Stg. Ht. 20mtr., laying of distribution system, Construction of secondary chlorination room and providing FHTC connection under Zone-VI water supply scheme of left-out Mouzas of Barabazar
Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 250 CUM and staging height 20 mtr as per approved drawing ( No PC-I/OHR/3/2012) including Laying Distribution Pipe line and providing FHTC including
Laying of HDPE pipeline, Construction of Valve Chamber, Construction Boundary wall at Tubewell site for Augmentation of Water Supply Scheme for Dubrajpur, Zone-A and its adjoining Mouzas under Simlapal Water Supply Scheme (BRGF Ph-I) under Jal Jeevan
Laying Distribution pipe line including providing functional Household Tap Connection (FHTC) Construction of 250 Cum OHR and other allied works of Raghunathpur Water Supply Scheme (Zone-I A/II) of Raghunathpur Sub Division under Purulia Division
Balance Ancillary Work for Kubirbandh and Chakai Piped Water Supply Scheme, Sonamukhi Block, Bishnupur Sub Division under Bankura Division, PHE Dte.
Supply,delivery, construction,commissioning and completion of all civil and electro mechanical works including all allied, related and enabling works for fifteen nos. PWSS.
Distribution System with FHTC work and construction of approach road at Pump House of Saltore-Hijuli Piped Water Supply Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. Part-III
Construction of Over Head Reservoir of Capacity 400 cum Stg. Ht. 20mtr., laying of distribution system, Construction of secondary chlorination room and providing FHTC connection under Zone-VIII water supply scheme of left-out Mouzas of Barabazar
Construction of Over Head Reservoir of Capacity 150 cum Stg. Ht. 20mtr., laying of distribution system, Construction of secondary chlorination room and providing FHTC connection under Zone-IV water supply scheme of left-out Mouzas of Barabazar
Construction of R.C.C. Elevated Reservoir, Capcaity 650 cum, Staging height 20 metre including Bypass arrangement and other allied works for Augmentation of Para W/S Scheme of Raghunathpur Sub-Division under Purulia Division PHE Dte.
Construction of Over Head Reservoir (OHR) of 1000 Cum Capacity, Staging Height 20 mtr. at existing OHR Campus (Rahardaga Mouza ) of Joypur W/S Scheme under Purulia Sadar Sub-Division of Purulia Division, P.H.E. Dte.
Crossing of Road by different dia MS pipe by trench less Technologies i.e Jack Pushing method with MS Carrier pipe, construction of Guard Room including plinth protection at CWR site, construction of Guard Room Toilet with sanitary water suppl
Construction of Over Head Reservoir of Capacity 250 cum Stg. Ht. 20mtr., laying of distribution system, Construction of secondary chlorination room and providing FHTC connection under Zone-VII water supply scheme of left-out Mouzas of Barabazar
Laying of Distribution System including pipe carrying structure all complete including cost of materials including providing House Hold Tap Connection (FHTC) and other allied works for Aug. work of Raghunathpur Water Supply Scheme (German Assisted)
Laying of HDPE pipe line and supplying fitting fixing of different dia. CIDF sluice valve and fitting and Construction of valve chamber in connection with retrofitting Chingani and adjoining Mouzas Water Supply Scheme under Onda Water Supply Scheme
Balance Ancillary Work for Ranibandh and Dhulai Piped Water Supply Scheme, Sonamukhi Block, Bishnupur Sub Division under Bankura Division, PHE Dte.
Construction and commissioning of R.C.C Over Head Reservoir of capacity 250 cum and staging height 20 mtr as per approved drawing, Laying DI (K7) HDPE pipe line for distribution system including Providing FHTC for Augmentation of Sub Surface Water
Supplying, laying, fitting, fixing and jointing of HDPE pipeline of distribution system with allied works, providing FHTC (Functional House Hold Tap Connection) and Construction of 100 cum capacity R.C.C OHR
Supplying, laying, fitting, fixing and jointing of HDPE pipeline of distribution system with allied works, providing FHTC (Functional House Hold Tap Connection) and Construction of 350 cum capacity R.C.C OHR
Construction of Over Head Reservoir (OHR) of 750 Cum Capacity, Staging Height 20 mtr. at BDO office Campus at Kotshila under Purulia Sadar Sub-Division of Purulia Division, P.H.E. Dte.
Laying Distribution pipe line including providing functional Household Tap Connection (FHTC) and other allied works of Raghunathpur Water Supply Scheme (Zone-I A/I) of Raghunathpur Sub Division under Purulia Division, PHE Dte.
Construction of Over Head reservoir (OHR) of capacity 350 Cum with other allied works of Bandwan WS Scheme of Purulia Sadar Sub_Division under Purulia Division PHE Dte.
Construction of RCC Over Head Reservoir of capacity 150 cum and staging height 20 mtr and laying of Distribution System including pipe carrying structure all complete including (FHTC) (Zone -II B)within Raghunathpur Sub-Division under PuruliaDivision
Distribution System with FHTC work and construction of Boundary wall at OHR Site of Saltore-Hijuli Piped Water Supply Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. Part-II
Balance Ancillary Works of Chak Patrasayer PWSS under Bishnupur Sub Division, PHE Dte.
Construction and commissioning of R.C.C Over Head Reservoir of capacity 550 cum and staging height 20 mtr as per approved drawing, Laying DI (K7), HDPE pipe line for distribution system including Providing FHTC for Augmentation of Sub Surface Water
Construction and commissioning of RCC Over Head Reservoirs including Laying Distribution Pipe lines and providing FHTCs including other allied works
Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 150 CUM and staging height 20 mtr as per approved drawing
Construction of Over Head Reservoir of Capacity 300 cum Stg. Ht. 20mtr., laying of distribution system, Construction of secondary chlorination room and providing FHTC connection under Zone-V water supply scheme of left-out Mouzas of Barabazar